Loading...
HomeMy WebLinkAbout2023 0605 NC Mine Application - Stephenson Property - Signed NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 NOTE:It is recommended that you contact the appropriate Regional Office or the Raleigh Central Office for a PRE- APPLICATION MEETING to discuss your intentions and address any questions. 1. Name of Mine Elliott Sand & Gravel Mine County Harnett River Basin Cape Fear Latitude(decimal degrees to four places) 35.2838 Longitude(decimal degrees to four places) -78.7242 2. Name of Applicant Heidelberg Materials Southeast Agg LLC(formerly Hanson Aggregates Southeast LLC) Applicant Contact Mary Ann Hoerle Consultant Contact Tyrus Clayton Applicant Email maryann.hoede@heidelbergmaterials.mm Consultant Email tclayton@trccompanies.com Telephone 919-357-6695 Telephone 919-827-0909 Cell Phone Cell Phone 919-795-6302 3 Permanent Address for Receipt of Official Mail"* 3825 Barrett Drive, Suite 300, Raleigh, NC 27609 4. Mine Office Address 4880 NC Highway 217 South, Erwin, NC 28339 5. Mine Manager Mike Hair Mine Manager Email willie.hair@heidelbergmaterials.com Telephone 910-897-8957 Cell Phone 910-308-2270 1 certify that all details contained in this permit application are true and correct to the best of our knowledge.We fully understand that any willful misrepresentation of facts will be cause for permit revocation. Signature*** � Date J Ch oS Print Name Daren McMorris Title North Carolina General Manager "This will be the name that the mining permit will be issued to and the name that must be indicated on the reclamation bond(security;that corresponds to this site. "*The Division of Energy,Mineral,and Land Resources must be notified of any changes in the permanent address or telephone number. * Signature of company officer required. G.S.74-51 provides that the Department shall grant or deny an application for a permit within 60 days of receipt of a complete application or,if a public hearing is held,within 30 days following the hearing and the filing of any supplemental information required by the Department.All questions must be addressed,and all required maps provided before this application can be considered complete.Attach additional sheets as needed. Revised September 21, 2021 P a g e 1 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 NOTE:All the following questions must be thoroughly answered regarding your mining operation for the intended life of the mine.All responses must be clearly conveyed on a corresponding,detailed mine map. A.GENERAL CHARACTERISTICS OF THE MINE 1. Answer all the following that apply: This is an application for a NEW permit. Indicate the total acreage at the site to be covered by the permit (This is the acreage the new permit fee will be based upon.) Of this acreage,how much is owned and how much is leased? Acres owned: Acres leased: Property owner if leased: RThis is an application for a MODIFICATION to a mining permit. Mining Permit Number: 43-03 _ Total permitted acreage: 1,597.83 Does the modification involve acreage within the previously approved permitted boundary? YES 7NO If yes,indicate the acreage to be covered by this modification 135.32 Does the modification involve acreage outside the previously approved permitted boundary? ❑X YES FNO If yes,indicate the additional acreage to be covered by this modification 177.67 NOTE:You must complete all of Section F of this application form entitled Notification of Adjoining Landowners Of the acreage to be added to the permit,will any portion be affected(i.e.:disturbed,ground cover removed)by the mining operation? VI YES ❑NO If yes,indicate the acreage to be affected within the acreage to be added to the permit 72.16 The modification fee is based upon the proposed new affected acreage within the previously approved permitted boundary plus the proposed total acreage to be added outside the previously approved permitted boundary. ❑ This is an application for TRANSFER of a mining permit. Mining Permit Number: __ Total permitted acreage: Revised September 21, 2021 P a g e 12 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 MINING FEE SCHEDULE A nonrefundable permit application processing fee when filing for a new mining permit,permit modification,or transferred permit is required as follows: APPLICATION TYPE 0—25 ACRES 26+ACRES New Permit Applications $3,750.00 $5,000.00 Permit Modifications $750.00 $1,000.00 Permit Transfers $100.00 $100.00 Annual Operating Fee $400.00 $400.00 Acres for new permits means the total acreage at the site to be covered by the permit.Acres for modification of permits means the new affected acres within the previously approved permitted boundary plus the proposed total acreage to be added outside the previously approved permitted boundary. 2. Name of all materials mined: Sand & Gravel 3. Mining Method: Front-end Loader&Truck Shovel&Truck ❑ Hydraulic Dredge ❑X Dragline&Truck ❑Self-loading Scraper ZExcavator&Truck ❑Other(please explain): 4. Expected maximum depth of mine(feet)60 Depth is relative to what benchmark?(e.g.,natural ground level,mean seal level,road elevation,etc.) Natural Ground Level Expected average depth of mine(feet) 30 5. Has an area at this site been mined in the past? YESH NO If yes,when and by whom was this activity conducted?Starting in 1972.Operators-"en°Tee`'Benchmark Carolina Aggregates,Hanson Aggregates Southeast 6. Estimated life of the operation(years): 15 NOTE:The Department may request clarification on how life of mine was calculated. Revised September 21, 2021 P a g e 13 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 B.MAPS 1. Clearly mark and label the location of your mining operation on six(6)copies of a 7.5-minute quadrangle and a county highway map.These maps,in addition to six(6)copies of all mine maps and reclamation maps,must be submitted with each permit application. 7.5-minute quadrangles may be obtained from the N.C.Geological Survey: Mailina Address Physical Address 1612 Mail Service Center 512 N.Salisbury St.,5th Floor Raleigh,NC 27699-1612 Raleigh,NC 27604 Htta:llportal.ncdenr.org/web/ir/geoloQical home (919)733-2423 County highway maps may be obtained from the N.C.Department of Transportation: Mailing Address Physical Address NCDOT GIS Unit NCDOT GIS Unit 1587 Mail Service Center 3401 Carl Sandburg Court Raleigh,NC 27699-1587 Raleigh,NC 27610 http://www.ncdot.r-fiit/ais (919)212-6000 2. A table/chart must be provided on the mine map that clearly lists the approximate acreage of tailings/sediment ponds, stockpiles,waste piles,processing areas/haul roads,mine excavations and any other major aspect of the mining operation that is proposed to be affected/disturbed during the life of the mining permit.A table/chart similar to the following will be acceptable: AFFECTED ACREAGE TABLE: For new permits,complete only the total affected acreage column. For modifications,complete all columns. CATEGORY CURRENT AFFECTED PROPOSED CHANGE TO TOTAL AFFECTED ACREAGE AFFECTED ACREAGE ACREAGE Tailings/Sediment Ponds 260.00 0.00 260.00 Stockpiles 10.00 0.00 10.00 Waste piles 25.00 0.00 25.00 Processing Areas/Haul Roads 59.20 0.00 59.20 Mine Excavations 833.75 47.83 881.58 Other(Please explain) 367.53 -5.48 362.05 Total Affected Acreage 1,187.95 1,260.11 1,260.11 Total Permitted Acreage 1,555.48 42.35 1,597.83 Revised September 21, 2021 P a g e 14 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 3. Mine maps must be accurate and appropriately scaled drawings,aerial photographs,or enlarged topographic maps of the entire mine site.All aspects of the mine site must be clearly labeled on the maps along with their corresponding(approximate)acreage.Thus,all mine and reclamation maps must denote those activities that are intended to be conducted during the life of the mining permit.All maps must be of a scale sufficient to clearly illustrate the following,at a minimum: a) Property lines of the tract or tracts of land on which the proposed mining activity is to be located including easements and rights-of-way. b) Existing or proposed permit boundaries with geographic controls(e.g.metes and bounds,coordinates)labeled c) Initial and ultimate limits of clearing and grading d) Outline and width of all buffer zones(both undisturbed and unexcavated) e) Outline and acreage of all pits/excavations f) Outline and acreage of all stockpile areas g) Outline and acreage of all temporary and/or permanent overburden disposal areas h) Location and acreage of all processing plants(may be described as to location and distance from mine if sufficiently far removed) i) Locations and names of all streams,rivers,and lakes j) Outline and acreage of all settling and/or processing wastewater ponds k) Outline and acreage of all planned and existing access roads and on-site haul roads 1) Location of planned and existing on-site buildings m) Location and dimensions of all proposed sediment and erosion control measures n) Location of 100-year floodplain limits and wetland boundaries o) Names of owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract, names of owners of record of tracts adjoining these tracts that are within 1,000 feet of the mining permit boundary must be provided on the mine map. p) Names of owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary which lie directly across and are contiguous to any highway,creek,stream,river,or other watercourse, railroad track,or utility or other public right-of-way.If an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,names of owners of record of tracts adjoining these tracts,that are within 1,000 feet of the mining permit boundary,must be provided on the mine map(s).NOTE:"Highway"means a road that has four lanes of travel or less and is not designated as an Interstate Highway. q) Map legend 1) Applicant name 5) Scale 2) Mine name 6) Symbols used and corresponding names 3) North arrow 7) Date prepared and revised 4) County 8) Name and title of person preparing map Map scales should meet the following guidelines: PERMITTED ACREAGE MAP SCALE 0—49 acres 1"=50' 50—199 acres 1"=100' 200+acres 1"=200' NOTE:Smaller scaled maps may be acceptable if they clearly illustrate the above items. NOTE:In addition to the above,the maps must also include any site-specific information that is provided in the answers to the following questions(italicized questions/statements)in this application form.This application will not be considered complete without all relevant items being adequately addressed on the mine maps. Revised September 21., 2021 P a g e 15 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 C.PROTECTION OF NATURAL RESOURCES 1. Describe in detail the sequence of events for the development and operation of the mine and reference the sequence to the mine map(s).Attach additional sheets as needed. Overburden is stripped using excavators and/or trucks as needed. The sand and gravel is mined and is transported to the existing processing plant using excavators and haul trucks. The disturbed land is made to drain back to the pit or to an approved erosion control structure. Mining proceeds as regulated under the existing permit. 2. Describe specific erosion control measures to be installed prior to land disturbing activities and during mining to prevent offsite sedimentation(include specific plans for sediment and erosion control for mine excavation(s),waste piles,access/mine roads,and process areas),and give a detailed sequence of installation and schedule for maintenance of the measures.Locate and label all sediment and erosion control measures on the mine map(s)and provide typical cross-sections/construction details of each measure.Engineering designs and calculations are required to justify the adequacy of any proposed measures. Erosion control measures are noted in the attached Mine Map. These structures are all designed according to the specifications shown in the Surface Mining Manual distributed by the Land Quality Section. Details for all existing structures have been submitted and approved through past submittals. Any new erosion control structures as part of this renewal are detailed in the supporting documents. 3. A)Will the operation involve washing the material mined,recycling process water,or other wastewater handling? ZYES NO If yes,briefly describe all such processes including any chemicals to be used. Mined sand and gravel is washed and sorted. Wash water is recycled through settling ponds. No chemicals are used in the process. Water is also used for dust control at the facility.Water is used at the processing plants by introduction through sprays at crushers and at conveyor transfer points to control dust emissions.It is also used in the water truck to control dust emanating from haul roads and stockpiles. Water used in dust suppression is usually pulled from the settling ponds. At the present time,no chemicals are used in any of these processes;however,there are times it is necessary to use DWQ approved flocculants in the recycle system to help achieve a cleaner source of water for the plant washing and dust control.It may also become necessary to use chemicals such as calcium chloride or organic surfactants on the haul roads and crusting agents on the stone product stockpiles B)Will the operation involve discharging fresh or wastewater from the mine or plant as a point discharge to the waters of the State? YES FINO If yes,briefly describe the nature of the discharge and locate all proposed discharge points(along with their method of stabilization)on the mine map(s). We currently operate under the NPDES COC No. NCG020178 General Permit that covers the discharge of excess groundwater from the pit de-watering process, as well as any excess water from our closed circuit settling pond system. Groundwater and storm water flow into existing on site ponds where it ultimately discharges through NPDES discharge point 001. Revised September 21, 2021 P a g e 16 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 C)Will any part of the proposed mine excavation(s)extend below the water table? FX]YES ❑ NO If yes,do you intend to dewater the excavation(s)? YES NO Estimated withdrawal rate in gallons per day: 900,000.00 If yes,what impact,if any,will mine dewatering have on neighboring wells?Locate all existing wells on the mine map(s)that lie within 500 feet of the proposed excavation area. Provide data to support any conclusions or statement made,including any monitoring well data,well construction data,and current water withdrawal rates.Indicate whether the proposed mine locale is served by a public water system or private wells. The estimated withdrawl rate(0.9 MGD)is the average from 2022 for the entire site. Mine dewatering will vary, based upon groundwater infiltration rate and mine operations. Sheet 10, provided,shows the apparent private groundwater well houses located within 500 feet of the extent of the proposed excavation area. The surrounding locale is served by a combination of private wells,as well as county water along Covington Road and Byrds Mill Road.Additionally, as a condition of the Special Use Permit,the property owners located between Covington Road and HW 217 have been placed on a Well Protection Program(WPP).A copy of the WPP has been included with this application. D)If you answered yes to any of the above questions,provide evidence that you have applied for or obtained the appropriate water quality permit(s)(i.e.,non-discharge,NPDES,Stormwater,etc.)from the Stormwater Program.In addition,the applicant is required to register water use with the Division of Water Resources,Ground Water Management Branch,if the operation withdraws more than 10,000 gallons per day and needs a capacity use permit from the Division of Water Resources,Ground Water Management Branch,if the operation lies in a capacity use area and withdraws more than 100,000 gallons per day. Elliott Sand & Gravel currently operates under the NPDES Stormwater Permit COC No. NCG020178 that covers the pit discharges as well as the closed circuit process water system. This site is not within a capacity use area. The Elliott operation is registered with the Division of Water Resources, Facility ID: 0340-0007, and reports annual groundwater withdrawal data on an annual basis (data due April 1, each year). 4. A)Will the operation involve crushing or any other air contaminant emissions? 1X-1YES ❑NO If yes,indicate evidence that you have applied for or obtained an air quality permit issued by the Division of Air Quality or local governing body. Air Permit No. 04152R18 issued by the NC Division of Air Quality covers this site. B)How will dust from stockpiles,haul roads,etc.,be controlled? A water truck is used to wet the haul roads and stockpiles as needed to control fugitive emissions from these sources. Revised September 21, 2021 P a g e 17 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 5. A)A buffer will be required between any mining activity and any mining permit boundary or right-of-way.It may be an unexcavated buffer(no excavation,but roadways,berms,and erosion&sedimentation control measures may be installed within it),an undisturbed buffer(no disturbance within the buffer whatsoever),or a combination of the two, depending upon the site conditions.Note that all buffers must be located within the mining permit boundaries. How wide a buffer will be maintained between any mining activity and any mining permit boundary or right-of-way at this site?A minimum buffer of 25 feet is recommended,although a wider buffer may be needed depending on site conditions.Show all buffer locations and widths on the mine map(s). The buffer locations and widths are shown on the Mine Map and Details Page. B)A minimum 50 foot wide undisturbed buffer will be required between any land disturbing activities within the mining permit boundaries and any natural watercourses and wetlands unless smaller undisturbed buffers can be justified. Depending on site conditions,a buffer wider than 50 feet may be needed. How wide an undisturbed buffer will be maintained between any land disturbing activities within the mining permit boundaries and any natural watercourses and wetlands at this site?Show all buffer locations and widths on the mine map(s). A 50' wide buffer will be maintained between all wetlands located on the site. For this submittal, the recent USACE Preliminary Jurisdictional Deterimination (SAW-2022-00061) has been included to show the wetlands found on the property to be added to the permit. These wetlands and buffers are shown on the Mine Map. 6. A)Describe methods to prevent landslide or slope instability adjacent to adjoining permit boundaries during mining. Minimum 2 horizontal to 1 vertical slopes or flatter for clayey material and minimum 3 horizontal to 1 vertical slopes or flatter for sandy material are generally required unless technical justification can be provided to allow steeper slopes. Excavated overburden faces will be left at a maximum slope of 3:1 (h:v) to reduce instability. Slope stability will be maintained with backfilling of overburden and re-vegetating exposed surfaces. B)Provide a cross-section on the mine map(s)for all fill slopes(berms,waste piles,overburden disposal areas,etc.), clearly indicating the intended side slope gradient,installation of any benches and/or slope drains(with supporting design information)if needed,and the method of final stabilization. Revised September 21, 2021 F a g E 8 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 C)In excavation(s)of unconsolidated(non-rock)materials,specify the angle of all cut slopes including specifications for benching and sloping. Cross-sections for all cut slopes must be provided on the mine map(s). Above the water elevations, excavation slopes of unconsolidated materials will be 3:1 (h:v) or flatter. Below the water elevations, excavation slopes of unconsolidated materials will be 1-1/2:1 (h:v). D)In hardrock excavations,specify proposed bench widths and heights in feet.Provide cross-sections of the mine excavation clearly noting the angles of the cut slopes, widths of all safety benches and mine benches,and the expected maximum depth of the excavation. N/A 7. Describe other methods to be taken during mining to prevent physical hazard to any neighboring dwelling,house, public road,or public,commercial or industrial building from any mine excavation.Locate all such structures on the mine map if they are within 300 feet of any proposed excavation. A 50' un-excavated buffer will be maintained along the permit boundary. Pit excavations slopes shall be 3:1 with a maximum excavation depth of 60 feet below grade. The above mentioned measures should be sufficient to address the concerns. Neighboring dwellings withing 300 feet are shown on the Mine Map. 8. Describe what kind of barricade will be used to prevent inadvertent public access along any high wall area and when it will be implemented.Vegetated earthen berms,appropriate fencing and adequate boulder barriers may be acceptable high wall barricades.A construction detaillcross-section and location of each type of barricade to be used must be indicated on the mine map(s). Inadvertent public access to mining areas is prevented by vegetative buffers, berms, and fencing where appropriate. Gates are maintained at all entrance points. 9. Are acid roducing minerals or soils present? YES �NO If yes,how will acid water pollution from the excavation,stockpiles,and waste areas be controlled? N/A Revised September 21, 2021 P a g e 19 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 10. A)Describe specific plans(including a schedule of implementation)for screening the operation from public view such as maintaining or planting trees,bushes or other vegetation,building berms or other measures.Show the location of all visual screening on the mine map(s)and provide cross-sections through all proposed berms or proposed spacing, sizes and species for tree plantings. The property is isolated and naturally screened by trees, etc for much of the property boundary. The Stephenson property (subject of this modification) is bordered by neighbors along one boundary. Along this boundary, we propose a vegetated berm. Please see Mine Map and cross section D-D and K-K, sheet X-2 for further details. B)Could the operation have a significantly adverse effect on the purposes of a publicly owned park,forest,or recreation area?If so,how will such effects(i.e.,noise,visibility,etc.)be mitigated? There are no publicly owned parks, forest or recreation areas adjacent to the operation. 11. Will ex I sives be used? YES X❑NO If yes,specify the types of explosive(s)and describe what precaution(s)will be used to prevent physical hazard to persons or neighboring property from flying rocks or excessive air blasts or ground vibrations.Depending on the mine's location to nearby structures,more detailed technical information may be required on the blasting program(such as a third-party blasting study).Locate the nearest offsite occupied structure(s)to the proposed excavation(s)on the mine map and indicate its approximate distance to the proposed excavation. N/A 12. Will fuel tanks,solvents,or other chemical reagents be stored on-site? IXYES F ]NO If yes,describe these materials,how they will be stored and method of containment in case of spill.Indicate the location(s)of all storage facilities on the mine map(s). On-site storage of diesel fuel,gasoline,and various oils and greases is necessary to facilitate the operation of various equipment needed to mine and process crushed stone aggregates.The bulk storage tanks for diesel fuel, gasoline,and oils are approved aboveground storage tanks having concrete secondary containment.Any major spill or leak from these tanks would be contained within the concrete containment structures.Greases and other oils are stored in aboveground storage tanks and 55-gallon drums and are stored in a concrete containment structure.An oil/water separator is located at the shop and servicing area to treat spent water from vehicle and equipment washing.Used oil is collected from equipment and picked up for offsite recycling by properly certified contractors.Empty oil and grease barrels are returned to the supplier or cleaned and placed into the metal scrap bin for offsite recycling.The Elliott facility has a Spill Prevention Control&Countermeasures(SPCC)Plan that requires monthly inspections of all bulk fuel and lube storage units.All employees are trained on a regular basis in the proper handling of petroleum products,managing and cleaning of spills,and proper disposal of rags, absorbent materials,and any contaminated soils. Revised September 21., 2021 P a g e 110 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 D.RECLAMATION PLAN 1. Describe your intended plan for the final reclamation and subsequent use of all affected lands and indicate the sequence and general methods to be used in reclaiming this land.This must include the method of reclamation of settling ponds and/or sediment control basins and the method of restoration or establishment of any permanent drainage channels to a condition minimizing erosion,siltation and other pollution. This information must be illustrated on a reclamation map and must correspond directly with the information provided on the mine map(s).In addition, design information,including typical cross-sections,of any permanent channels to be constructed as part of the reclamation plan and the location(s)of all permanent channels must be indicated on the reclamation map. The reclamation plan is to return the site to an open water area when operations are terminated. The mined area will be a combination of discrete land and water areas. The plant and stockpile areas will be reclaimed and seeded with grass. All disturbed areas will be graded, scarified and re-vegetated in accordance with the revegetation plan. The restored mine site could be utilized for water storage, recreation, wildlife sanctuary or other uses. Please see the attached reclamation drawings for further details. 2. Is an excavated or impounded body of water to be left as part of the reclamation? a YES FINO If yes,illustrate the location of the body(s)of water on the reclamation map and provide a scaled cross-section(s) through the proposed body(s)of water.The minimum water depth must be at least 4 feet,measured from the normal low water table elevation,unless information is provided to indicate that a shallower water body will be productive and beneficial at this site. Will the body(s)of water be stocked with fish? DYES F;;7NO If yes,specify species. N/A 3. Describe provisions for safety to persons and to adjoining property in all completed excavations in rock including what kind of permanent barricade will be left.Acceptable permanent barricades are appropriate fencing,large boulders placed end-to-end,etc. Construction details and locations of all permanent barricades must be shown on the reclamation map. There is no excavation into rock proposed for this site. Revised September 21, 2021 P a g e 11 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 4. Indicate the method(s)of reclamation of overburden,refuse,spoil banks or other such on-site mine waste areas, including specifications for benching and sloping.Final cross-sections and locations forsuch areas must be provided on the reclamation map. Overburden, refuse, and spoil piles will be leveled with excavators and/or bulldozers to produce a finished elevation several feet above the water table. Slopes will be left at 3:1 (h:v) or flatter above the water and 1-1/2:1 (h:v) below the water. 5. A)Describe reclamation of processing facilities,stockpile areas,and on-site roadways. These areas will be graded, scarified and revegetated in accordance with the attached schedule. Erosion control structures necessary for final reclamation will be cleaned out and placed in good working order. B)Will any on-site roadways be left as part of the reclamation? FXYES FINO If yes,identify such roadways on the reclamation map and provide details on permanent road and ditch line stabilization. The entrance road to the pits and the road around the excavations will remain. All other roads will be reclaimed as mentioned in 5a. 6. Describe the method of control of contaminants and disposal of scrap metal,junk machinery,cables,or other such waste products of mining.(Note definition of refuse in The Mining Act of 1971.) No off-site generated waste shall be disposed of on the mine site without prior written approval from the NC Department of Environmental Quality,Division of Energy,Mineral,and Land Resources and either the Division of Waste Management(DWM)or local governing body.If a disposal permit has been issued by DWM for the site,a copy of said permit must be attached to this application.All temporary and permanent refuse disposal areas must be clearly delineated on the mine map(s)and reclamation map,along with a list of items to be disposed in said areas. As previously approved, temporary scrap and used equipment storage areas have been developed at this site. The scrap material and used equipment which accumulate as a result of mining and processing activities are stored in these areas until sold to an independent recycling contractor. A scrap bin is maintained on site for disposal by recycling of small metal scrap. Tires are recycled through the various tire suppliers. Revised September 21, 2021 P a g e 112 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 7. Describe your plan for revegetation or other surface treatment of the affected areas.This plan must include recommendations for year-round seeding,including the time of seeding and the amount and type of seed,fertilizer, lime and mulch per acre.The recommendations must include general seeding instructions for both permanent and temporary revegetation.Revegetation utilizing only tree plantings is not acceptable.Recommendations can be sought from: a. Authorized representatives of the local Soil and Water Conservation District; b. Authorized representatives of the NC Forest Service,Department of Agriculture and Consumer Services; c. Authorized county representatives of the North Carolina Cooperative Extension Service,specialists and research faculty with the Colleges of Agriculture and Life Sciences and Forest Resources at North Carolina State University; d. North Carolina licensed landscape architects; e. Private consulting foresters referred by the NC Forest Service,Department of Agriculture and Consumer Services; f. N.C.Erosion and Sedimentation Control Planning and Design Manual; g. N.C.Surface Mining Manual:A Guide for Permitting,Operation and Reclamation; h. Others as may be approved by the Department. Lime Rate of Application(tons/acre): 2 tons/acre or 3 tons/acre in clay soils Fertilizer Analysis and Rate of Application(Ibs/acre): 1000 Ib/acre(10-10-10) Seed type(s)and rate(s)of application included year-round seeding schedule(Ibs/acre): NOTE:Include legumes SEED TYPES SEEDING DATES SEEDING RATES Please see seeding schedule on X-1, specification vary based on area to be seeded. Mulch Type,Rate of Application(Ibs/acre),and Method of Anchoring: Mulch-2 tons/acre of small grain straw Anchor-Asphalt Emulsion at 450 gal/acre,or other tacking agent approved by owner Details listed on X-1 Other Vegetative Cover(s)Type(s)and Rate(s)of Application Including Seeding Schedule(Ibs/acre,trees/ acre,spacing of trees/shrubs,etc.): Revegetation and/or reforestation plan approved by: Signature Date Print Name Title Agency Revised September 21, 2021 P a g e, 113 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 E.DETERMINATION OF AFFECTED ACREAGE AND BOND The following bond calculation worksheet is to be used to establish an appropriate bond(based upon a range of$500 to$5,000 per affected acre)for each permitted mine site based upon the acreage approved by the Department to be affected during the life of the mining permit.Please insert the approximate acreage, for each aspect of the mining operation, that you intend to affect during the life of this mining permit(in addition.please insert the appropriate reclamation cost/acre for each category from the Schedule of Reclamation Costs provided with this application form)OR you can defer to the Department to calculate your bond for you based upon your maps and standard reclamation costs: CATEGORY AFFECTED RECLAMATION RECLAMATION ACREAGE COST/ACRE COST Tailings/Sediment Ponds Ac. X $ /Ac. = $ 0.00 Stockpiles Ac. X $ /Ac. = $ 0.00 Waste Piles Ac. X $ /Ac. = $ 0.00 Processing Area/Haul Roads Ac. X $ /Ac. = $ 0.00 Mine Excavation Ac. X $ /Ac. = $ 0.00 Other Ac. X $ /Ac. = $ 0.00 TOTAL AFFECTED AC.: 0.00 Ac. TOTAL PERMITTED AC.: Ac. Temporary&Permanent Sedimentation&Erosion Control Measures: Divide the TOTAL AFFECTED AC.above into the following two categories:a)affected acres that drain into proposed/existing excavation and/or b)affected acres that will be graded for positive drainage where measures will be needed to prevent offsite sedimentation and sedimentation to onsite watercourses and wetlands. a) Internal Drainage Ac. b) Positive Drainage Ac. X $1,500.00 = $ 0.00 SUBTOTAL COST:$ 0.00 Inflation Factor: SUBTOTAL COST LIFE OF MINING OPERATION OR LIFE INFLATION COST OF LEASE(YEARS) 0.02 X $ 0.00 X = $ 0.00 Total Reclamation Bond Cost: TOTAL RECLAMATION BOND COST= SUBTOTAL+INFLATION = $0•00 Round down to the nearest$100.00 NOTE:The reclamation bond cannot exceed$1 million per GS 74.54 Heidelberg Materials Southeast Agg LLC has a maximum bond of$1,000,000.00 in place at this time pursuant to NCGS 74-54 Revised September 21,2021 Page 114 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 SCHEDULE OF RECLAMATION COSTS Based upon range of$500-$5,000 per affected acre COMMODITY CODES: SG Sand and/or Gravel DS Dimension Stone PF Pyrophyllite CL Clay/Shale GS Gemstone FS Feldspar OL Olivine PE Peat Borrow Borrow/fill dirt MI Mica KY Kyanite/Sillimanite/Andalusite AU Gold CS Crushed Stone LI Lithium PH Phosphate TI Titanium OT Other TYPE TIS PONDS STOCKPILES WASTE PILES P.AREA/H.R. MINE EXCAVATION SG,GS,Borrow $500/ac.(L) $1800/ac. $2000/ac. $1800/ac. $500/ac.(L) 1500(FI) 2000(PD) CS,DS,FS, MI,LI, 500(L) 1800 2000 2000 500(L) PF,OL,KY 1500(FI) 2500(PD) 1000(L) 2500 5000 5000 2000(L) PH 2500(FI) 5000(PD) 1000(L) 2500 5000 5000 2000(L) CL 2500(FI) 3700(PD) 1000(L) 2000(L) PE,AU,TI,OT 2500(FI) 2500 3000 3500 5000(PD) (L)=Reclamation to a lake and revegetating side slopes (FI)=Reclamation by filling in and revegetating (PD)=Reclamation by grading for positive drainage&revegetating AS PER NCAC 15A 513.0003,IF YOU DISAGREE WITH THE BOND AMOUNT DETERMINED BY THE BOND CALCULATION WORKSHEET,YOU MAY SUBMIT AN ESTIMATE OF RECLAMATION COSTS FROM A THIRD-PARTY CONTRACTOR. SAID ESTIMATE MUST BE PROVIDED WITHIN 30 DAYS TO THE FOLLOWING ADDRESS: Mining Program,1612 Mail Service Center,Raleigh,North Carolina 27699-1612 ALL ESTIMATES MUST INCLUDE THE FOLLOWING,AS A MINIMUM: •FINAL GRADING COSTS PER ACRE •LIME AND FERTILIZER COSTS PER ACRE •YEAR-ROUND SEEDING MIXTURE COSTS PER ACRE(FROM APPROVED REVEGETATION PLAN IN APPLICATION/PERMIT DOCUMENT) •MULCH AND ANCHORING COSTS PER ACRE •ANY OTHER RECLAMATION COSTS NECESSARY TO COMPLY WITH THE APPROVED RECLAMATION PLAN FOR THE SITE IN QUESTION YOU WILL BE NOTIFIED AS SOON AS POSSIBLE OF THE DIRECTOR'S FINAL BOND DETERMINATION. Revised September 21, 2021 P a g e 115 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 F.NOTIFICATION OF ADJOINING LANDOWNERS The"Notice"form,or a facsimile thereof,attached to this application must be sent certified or registered mail,return receipt requested,to: (1)the chief administrative officer of each county and municipality in which any part of the permitted area is located as indicated on the mine map(s); (2)all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary)as indicated on the mine map(s);and (3)all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary which lie directly across and are contiguous to any highway,creek,stream,river,or other watercourse,railroad track, or utility or other public right-of-way.If an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary)as indicated on the mine map(s)."Highway"means a road that has four lanes of travel or less and is not designated as an Interstate Highway. The only exception to the above method of giving notice is if another means of notice is approved in advance by the Director, Division of Energy,Mineral,and Land Resources. A copy of a tax map(or other alternative acceptable to the Department)must be mailed with the completed"Notice"form(the proposed overall permit boundaries and the names and locations of all owners of record of lands adjoining said boundaries must be clearly denoted on the tax map). The"Affidavit of Notification"attached to this application must be completed,notarized and submitted to the Department,with the remainder of the completed application form before the application will be considered complete. NOTES: THIS SECTION MUST BE COMPLETED FOR ALL APPLICATIONS FOR NEW MINING PERMITS AND ALL MODIFICATIONS OF A MINING PERMIT TO ADD LAND TO THE PERMITTED AREA,AS REQUIRED BY NCGS 74-50(b1). SEE THE NEXT TWO PAGES FOR THE"NOTICE"FORM AND THE"AFFIDAVIT OF NOTIFICATION' Revised September 21, 2021 P a g e 116 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 NOTICE Pursuant to provisions G.S.74-50(bl)of The Mining Act of 1971,Notice is hereby given that Heidelberg Materials Southeast Agg LLC has applied on 06/05/2023 to the Division of Energy, (Applicant Name) (Date) Mineral,and Land Resources,North Carolina Department of Environmental Quality, 1612 Mail Service Center,Raleigh,North Carolina 27699-1612,for(check one): a new surface mining permit, a modification of an existing surface mining permit to add land to the permitted area;or a modification of an existing surface mining permit to add land to the permitted area with no disturbance in the area proposed. Please note that future modification(s)may be submitted by the applicant to allow disturbance within this area without re-notification of adjoining landowners. The applicant proposes to mine sand & gravel on 177.67 acres located 5.00 (Mineral,Ore) (Number) (Number) miles northwest of Erwin off/near road NC Highway 217 (Direction) (Nearest town) (Number,Name) in Harnett County. *SEE ATTACHED MAP FOR PROPOSED PERMIT BOUNDARIES AND CORRESPONDING ADJOINING LANDOWNER NAMES AND LOCATIONS* In accordance with G.S.74-50(bl),the mine operator is required to make a reasonable effort,satisfactory to the Department,to notify all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary).In addition,the mine operator must also notify the chief administrative officer of the county or municipality in which any part of the permitted area is located. Any person may file written comment(s)to the Department at the above address within thirty(30)days of the issuance of this Notice or the filing of the application for a permit,whichever is later. Should the Department determine that a significant public interest exists relative to G.S.74-51,a public hearing will be held within 60 days of the end of the 30-day comment period specified above. A copy of the permit application materials is on file and available for public review during normal business hours at the above listed address as well as at the appropriate regional office.For information regarding the specifics of the proposed mining activity,please contact the applicant at the following telephone number: 919-357-6695 For information on the mining permit application review process,please contact the Mining Program staff at(919)707-9220. Please note that the Department will consider any relevant written comments/documentation within the provisions of the Mining Act of 1971 throughout the application review process until a final decision is made on the application. Mary Ann Hoerle, Heidelberg Materials Southeast Agg LLC Addressee/Owner of Record's Name and Address Name of Applicant.Include Contact Person&Company Name,if Applicable 3825 Barrett Dr, Suite 300, Raleigh, NC 27609 Date of Issuance of this NoticelMailed to Addressee/Owner of Record Address of Applicant Revised September 21, 2021 P a g e 117 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 AFFIDAVIT OF NOTIFICATION Mary Ann Hoerle ,an applicant,or an agent,or employee of an applicant,for a new Mining Permit,or a modification of an existing Mining Permit to add land to the permitted area,from the N.C.Department of Environmental Quality,being first duly swom,do hereby attest that the following are all known owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary(including,where an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts,that are within 1,000 feet of the mining permit boundary)and that notice of the pending application has been caused to be mailed,by certified or registered mail,return receipt requested,to said owners of record at their addresses shown below,such notice being given on a form provided by the Department: Adjoining Landowner Name Address Please see attached list and drawing Attach additional list if necessary. I do also attest that the following individual is the chief administrative officer of the county or municipality in which any part of the permitted area is located and that notice of the pending application has been caused to be mailed,by certified or registered mail, return receipt requested,to said office at the following address: Brent Trout, County Manager P. 0. Box 759, Lillington, NC 27546 Chief Administrative Officer Name Address (i.e.:City Manager,County Manager,Mayor,etc.) The above attestation was made by me while under oath to provide proof satisfactory to the Department that a reasonable effort has been made to notify all known owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary(including,where an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts,that are within 1,000 feet of the mining permit boundary)and the chief administrative officer of the county or municipality in which any part of the permitted area is located in compliance with N.C.G.S. 74-50(bl)and 15A NCAC 56.0004(d).I understand that it is the responsibility of the applicant to retain the receipts of mailing shown gthat th-above n f es were caused to be mailed and to provid the to the Department upon request. Signature f Applicant or Agent Date If person executing Affidavit is an agent or employee of an applicant,provide the following information: Name of Applicant Mary Ann Hoerle Title of person executing Affidavit .[ Environmental Manager, Heidelberg Materials Southeast Agg LLC 1, 1 0-y n y 5• � 1'�e K ,a N,°�tary Pu I' of the County of c-[C o �p%joI11114ft�tate of North Carolina,do hereby certify that K lme'14 l V Off( I'e appeared before me this Y S.Q`�d under oath acknowledged that the above Affidavit was made by him/her. ....0448 d h +p r or y hand and notarial seal this day of h C 20 a J ry'� S Q My commission expires: O2 I 4ry� ••RBA d September 21, 2021 P a g e 18 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 G.LAND ENTRY AGREEMENT We hereby grant to the Department or its appointed representatives the right of entry and travel upon our lands or operation during regular business hours for the purpose of making necessary field inspections or investigations as may be reasonably required in the administration of the Mining Act of 1971 pursuant to G.S.74-56. We further grant to the Department or its appointed representatives the right to make whatever entries on the land as may be reasonably necessary and to take whatever actions as may be reasonably necessary in order to carry out reclamation which the operator has failed to complete in the event a bond forfeiture is ordered pursuant to G.S.74-59. LANDOWNER: APPLICANT: Signature Signature* 4L" Print Name Daren McMorris Print Name Mary nn Hoerle Title(if applicable) NC General Manager Title Environmental Manager Company(if applicable) Heidelberg Materials Southeast Agg LLC Company Heidelberg Materials Southeast Agg LLC Address 3825 Barrett Drive, Suite 300 Mine Name Heidelberg Materials-Elliott Sand&Gravel Raleigh, NC 27609 Telephone (910)897-8957 Telephone (919) 614-1153 Date Signed 5Z w,3 Date Signed C:)C,.1sLa *Signature must be the same as the individual who signed Page 1 of this application. One original and five(5)copies of the completed application,six(6)copies of all location maps,mine maps and reclamation maps.and the appropriate processing fee in the form a check or money order payable to the North Carolina Department of Environmental Quality must be sent to the Raleigh Central Office at the address listed on the front cover of this application form. Inquiries regarding the status of the review of this application should be directed to the Mining Program staff at(919)707-9220. Revised September 21, 2021 P a g e 119