Loading...
HomeMy WebLinkAbout20230413_ADI_74-98 �dio,STAT-Q, ROY COOPER Governor ? i' - r ELIZABETH S.BISER Secretary Q AM VIOL DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality April 13,2023 Certified Mail Return Receipt Requested 7008 1300 0000 1127 1418 Tony Harris American Materials Company,LLC 6131 Oleander Dr. Wilmington,NC 28403 RE: Brown Sand Mine Mining Permit No. 74-98 Pitt County Tar-Pamlico River Basin Dear Mr. Harris: We have reviewed the modification request your company submitted for the referenced mine site. In order for this office to complete its review of the referenced project in accordance with N.C.G.S. §74-50 and§74-51 of the Mining Act of 1971,please provide the additional or revised information in accordance with the following comments: 1. Please provide proof that the NOI for the NPDES Stormwater permit has been submitted. 2. Please provide proof that you have obtained a Central Coastal Plain Capacity Use Area (CCPCUA) water withdrawal permit with the Division of Water Resources Groundwater Management Branch for dewatering activities. The application form may be obtained from the following link: hops://www.ncwater.org/CCPCUA 3. Please clearly indicate and label on the mine map the locations of well for neighboring properties within 500' of the excavation. 4. N.C.G.S. §74-49 defines "affected land" as the surface are of land that is mined, the surface area of land associated with a mining activity so that soil is exposed to accelerated erosion,the surface area of land on which overburden and waste is deposited, and the surface area of land used for processing or treatment plant, stockpiles, nonpublic roads, and settling ponds. The construction entrance, office trailer, and other mine related activity at the entrance must be included within the mine permit boundary. 5. Increasing the boundary to include the above items will require notice to adjoining landowners. Please provide proof, such as copy of the signed return receipts from certified mail, that JENKINS VERGIL CARROLL JR, HUBAND ELIZABETH BROWN HEIRS, and chief administrative officer of each county and municipality have been properly notified. 6. Please clarify the affected acreage table. The table shown on the mine map states that 63.86 acres are disturbed. The table shown in the application states that 63.86 acres are permitted,but only 54.35 acres are disturbed. D E Q North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612 NORhI CAROLINA - oaaa�emaienmronmenmiuuality /`� 919.707.9200 Certified Mail 7008 1300 0000 1127 1418 Mr. Harris Page 2 7. The application has not been signed by an officer of the company. Tony Harris is not listed as an officer or managing member of American Materials Company, LLC in the annual filings on the Secretary of State Website. An officer of the company will need to sign page 1 and the land entry agreement on page 19 of the application or provide proof that Tony Harris has signature authority for American Materials Company,LLC. 8. Please clarify the address provided in the application under permanent address for receipt of official mail.The address provided in the application does not match the mailing or the registered address listed for American Materials Company,LLC on the Secretary of State Website. 9. Your response to question C.3 in the mine permit application states that the sand will be washed. Please identify and clearly label on the mine map the location of the processing/wash plant. 10. Please provide an Operation and Maintenance plan for the pumping and dewatering activities. 11. Please clarify your sequence of mining operations. Your current mine map only shows a single excavated area. Please clarify how you propose to dewater and pump from pit to pit. Additional maps may be required to illustrate mining phases and the location of separate pits. 12. Please clarify your intent to discharge water from mine dewatering. Your response to C.2 states there will be no discharge of storm water then continues to state that there will be discharge by pumping. In addition your cover letter states that the dewatering pond will overflow at times and discharge. 13. During a recent site inspection it was noted that the screening berms had not been constructed according to plan details. Please provide proof that screening berms are constructed as designed on plan details. 14. During a recent site inspection it was noted that two rock check dams need to be installed. Please provide proof that a rock check dam has been installed where the ditch leaves the pit excavation and at the ditch intersection. Please note, this office may request additional information not included in this letter, as the mining application review progresses. Be advised that our review cannot be completed until all of the items listed above have been fully addressed. In order to complete the processing of your application,please forward two(2)copies of the requested information to my attention at the following address: Division of Energy,Mineral and Land Resources Department of Environmental Quality 1612 Mail Service Center Raleigh,NC 27699-1612 If hand delivering or delivering by shipping company(e.g., FedEx, UPS),please deliver to our physical address: Division of Energy, Mineral, and Land Resources Department of Environmental Quality 512 N. Salisbury Street, 5th Floor Raleigh,NC 27604 Certified Mail 7008 1300 0000 1127 1418 Mr. Harris Page 3 As required by 15A NCAC 513.0113,you are hereby advised that you have 180 days from the date of your receipt of this letter to submit all of the requested information. If you are unable to meet this deadline and wish to request additional time,you must submit information,in writing,to the Director clearly indicating why the deadline cannot be met and request that an extension of time be granted. If an extension of time is not granted, a decision will be made to grant or deny the mining permit based upon the information currently in the Department's files at the end of the 180-day period. Though the preceding statement cites the maximum time limit for your response,we encourage you to provide the additional information requested by this letter as soon as possible. Your prompt response will help us to complete the processing of your application sooner. Please contact me at(919) 707-9220 if you have any questions. Sincerely, At_ Adam Parr, PE Assistant State Mining Engineer Enclosures: Inspection Report cc: Mr. Samir Dumpor,PE