Loading...
HomeMy WebLinkAbout20230315_IR_74-98 North Carolina Department of Environmental Quality, Division of Energy, Mineral, and Land Resources MINE INSPECTION REPORT ® PERMITTED MINE SITE ❑ UNPERMITTED MINE SITE 1. MINE NAME: Brown Sand Mine 2.MINE LOCATION: NC 33 3. COUNTY: Pitt 4. RIVER BASIN: Tar-Pamlico 5. CASE: 6. OPERATOR: Tony Harris,American Materials Company,LLC 7. ADDRESS: 6131 Oleander Dr.,Wilmington,NC 28403 8. MINING PERMIT#: 74-98 ❑ N/A 9. PERMIT EXPIRATION DATE: ® N/A 10. PERSON(S) CONTACTED AT SITE: Operator 11. PICTURES? ® Yes ❑ No TAKEN BY: Scott Graboski 12. TYPE OF INSPECTION: ❑ A. Initial Inspection(Unpermitted Mine Sites) 1. Size of affected land: ac. (attach sketch map) 2. How was this area measured? Measured by: ® B. Routine Inspection(Permitted Mine Sites) C. Follow-up Inspection 13. Date of last inspection: 02/07/2023 14. Any mining since that date? ® Yes ❑ No If yes, cite evidence of such mining activity: Excavator actively operating at the time of inspection. 15. Was mine operating at time of inspection? ® Yes ❑ No If yes, explain: Excavator actively operating at the time of inspection. 16. Is the mine in compliance with the Operating Conditions of the Permit? ❑ Yes ® No ❑ N/A If no, explain: O.C. 8. Existing vegetation or earthen berms shall be maintained between the mine and public thoroughfares.O.C.4.A.Adequate mechanical barriers...shall be provided in the initial stagesof any land disturbance and maintained. 17. Is the mine in compliance with the Reclamation Conditions of the Permit? ® Yes ❑ No ❑ N/A If no, explain: 18. Is there any off-site damage? A. ❑ Yes B. ® No C. ❑ None observed If A,describe the type and severity of the damage: If B or C,is there potential for offsite damage? ❑ Yes ® No Explain: 19. Corrective measures needed and/or taken: The two rock check dams need to be installed, one where the ditch leaves pit excavation and another at the ditch intersection.Berm is insufficient to screen operations and was not constructed according to plan detail. 20. Other recommendations and comments: 21. Is the Annual Reclamation Report+/- map accurate? ❑ Yes ❑ No (Explain) ❑ Not Reviewed ® N/A 22. Follow-up inspection needed? ® Yes ❑ No Proposed date March 2024 23. No. of additional pages of Inspection Report 0 24. Copy of Report sent to operator 03/31/2023 INSPECTED BY: Scott Graboski &Amber Rights DATE 03/15/2023 Telephone No: 252-946-6481 Copy to file Copy to operator Copy to Mining Specialist Rev.10/2015 �w •S�tiy�p.f x R9� 11�� - ! .i ram. , 'r. 4 �i�ti� 1.0A�4�x 74 MINE -�-���. ��`"�zf' „� � �`�—' tea' _ r�`' �-_. • -:r 5 �-x�.,�