Loading...
HomeMy WebLinkAbout20211005_NOV_Response Corporate Office:W3639 Highway H,Chilton,WI 53014 Design Center/Showroom:The Shops at Woodlake,765H Woodlake Road,Kohler,WI 53044 Kansas Fabrication:1000 Industrial Road,Winfield,KS 67156 North Carolina Fabrication:7274 US Hwy 221 N.Marion,NC 28752 800.236.4473 • www.buechelstone.com Friday, October 1,2021 Adam Parr Assistant State Mining Engineer Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Dear Adam, Please let this serve as confirmation of our actions for our Notice of Violation of Mining Permit at No. 61-19. We have been in touch via email communication as well but want to formally send you this as well. 1.) Immediately cease further use of explosives at the Steel Gray Mine a. Completed 2.) Complete Blast Investigation Report prepared by 3rd party. a. In progress by Arcadis, Chris Peters. This will be complete by October V 3.) Cease activity outside of permitted boundary areas a. Completed 4.) Updated Mining Permit Modification &Transfer a. In progress. Arcadis, Chris Peters is looking to have submitted by October 15`h. In addition we have: 1.) Reviewed our vendor blasting relationship with Caldwell Drilling. We have reviewed 2 additional contactors that we are hoping to obtain quotes from. 2.) Reviewed our internal procedures for vendor blasting management. We must inspect and observe our blasting contractors to ensure that they follow all permitted blasting conditions on a regular basis. 3.) We have been in regular communication with Merle (Tom)Andrews of Blue Ridge Mountain Quarries. We have been operating under the assumption that all permits had been transferred to Kenneth Pearson of Blue Ridge Mountain Stone. We wish to have the permits transferred to Buechel Stone with the cooperation of Mr.Andrews. We look forward to resolving this issue. Thank you, RECEIVE® April M..VDVowwlland COO r ' '� _ � L..^<, f^�fay .� �. -. - .o,�i� 5 .lam"� �`�'