Loading...
HomeMy WebLinkAbout47-16 ADI Response Letter 20201229 CAROLINA GEOLOGICAL SERVICES, INC December 18, 2020 Adam Parr Assistant State Mining Engineer 1612 Mail Service Center Raleigh, NC 27699-1612 RECEIVED Subject: A&H Mine DEC 'L 9 tole Mining Permit No. 47-16 Hoke County UALITY Cape Fear River Basin LAND MINING PROGRAM AM Dear Mr. Parr, On behalf of 401 Sand Company LLC I am responding to your letter of October 30, 2020, in which you requested additional information for your review of the above-referenced mining permit modification request. I appreciate the additional information and conversations we have had to clarify your need for additional information on the entire site, not just the new addition. We trust that the information contained in this response will provide the additional information that you need for your review. I assure you that every effort has been made to provide as much detailed information as possible, specific to your request. I will respond to your questions or requests in the same order for clarity; 1. Please provide post mining contours for the entire site, including mined areas. Post mining contours for the existing mining area are not shown. Response: The contours for the fully graded post-mined site are shown on Sheet C5 as included in this revised set of drawing. The contours for the existing mining area are shown on Sheet C6. 2. Please show and label the associated erosion control measures(vegetated diversion berm and silt fence) for the stream crossing. Response: The detail of the stream crossing (as previously approved and built) is shown on Detail Sheet D2. 3. Please show the locations of the baffles, dewatering devices, and outlets for all the Sediment Basins, including the existing Sediment Basins in the existing permit area. PO Box 429, GARNER, NC 27529 Page 2 401 Sand Co, ADI response Response: All requested details have been added to the site plans, including details for sediment basins in the existing permit area. The detail sheet, Sheet D4 shows all the new basins in detail including the location of coir baffles, the emergency spillway, riser and skimmer dewatering device. Details for the existing basins are listed on Sheet C1. 4. Please show how runoff will be conveyed to all Basins, by detailing ditch, etc. on map. Detail is missing from existing basins. Response: The revised plans show flow directions for overland flow and diversion swales to convey runoff to the sediment basins, including existing basins. 5. Provide maintenance requirements for the visual barrier berm and for the temporary slope drain berms. Response: Maintenance requirements for all erosion and sediment control structures are detailed on Detail Sheet D2.. 6. Please remove Weeping Love Grass from the permanent groundcover specifications, which appears on sheet D2.. Response: Weeping Love Grass has been removed from the permanent groundcover spec cations shown on Sheet D2. 7. Please provide an explanation as to how the new mining site will be accessed, as there are no roads shown on the Mine Map leading to the new mining site. During a recent field inspection, it appeared that there was an access road to the new mining site, which should be shown on the Mine Map. Response: The new Mining Area is contiguous to the existing Mining Area. Mining will simply proceed as a natural expansion of this existing pit. However, for clarity, a new temporary haul road has been shown. As site development continues, this will be incorporated into the mining area. A w Page 3 401 Sand Co, ADI response We trust this information will allow you to complete your review of this modification request. If you have any questions, or need further information, please contact me. Sincerely, James C. Izzell, Jr., PG Carolina Geological Services, Inc. enclosures