HomeMy WebLinkAbout01_20200914 ADI Response 7-20-2020 - letter MINING CHECKLIST FOR ROUTING
Applicant's Name: ,A,> CLC— ProjectName: A w �i M itiG
Applic.1 Permit No: County: N a K C Date Received 1 /-rcs
Reviewer: �' P River Basin Name:
❑ New Modification(inside permit boundaries)
❑ Modification(outside permit boundaries) ❑ Transfer ❑ Release
❑ Partial Release JR Additional Information ❑ Fee Needed# ❑ Fee Received$
Please route entire application package to
J�T V t t Regional Office(2 cmnplrte copies;attach the"LQS Wad Of ire Mining Application Review
Cheddie to one copy and attach both the DAQand DWR"Mining Ap$kAtioe Review Form"to the other copy;send both copies to the Regional
Engineer) — l
Date:Routed � f r� Rec'd
❑ Division of Water Resources Date.Routed Reed
❑ NC Wildlife Resources Commission Date.Routed Rec'd
❑ US Fish&Wildlife Service Date.Routed Rec'd
(Only new applications and modification requests that add load to the permit)
PIease route first 3 pages of the application and anq location maps to:
❑ Division of Parks&Recreation Date:Routed Reed
❑ NC Geological Survey Section Date:Routed Reed
❑ Division of Marine Fisheries Date:Routed Rec'd
❑ Division of Soil dr Water Conservation (plus LEA) Date:Routed Rec'd
(only new applications and modifications requests that add land to the permit)
❑ Division of Archives dr History Date:Routed Rec'd
(Only new applicants)
❑ Other: Date:Routed Ree'd
"Suspense Date for Comments: 17 to (no later than 25 days from receipt)
rLt Please rote the following:
r d
CAROLINA GEOLOGICAL SERVICES, INC
September 7, 2020
Adam Parr
Assistant State Mining Engineer
1612 Mail Service Center
Raleigh, NC 27699-1612 DECEIVED
Subject: A&H Mine SEP 14 7020
Mining Permit No. 4746
Hoke County LAND QUALITY
Cape Fear River Basin M WNG PROGRAM
Dear Mr_ Parr,
On behalf of 401 Sand Company LLC I am responding to your letter of July 20, 2020, in
which you requested additional information for your review of the above-referenced
mining permit modification request. I will respond to your questions or requests in the
same order for clarity;
1. Please provide proof that our(sic)company has obtained any permits or provided any
notifications to the Division of Waste Management for said landfilling activities. Please
note that a separate Sediment and Erosion Plan approval and Industrial Stormwater
Permit is required for the LCID since it is located in an already mined area. The area
must be removed from the mining permit boundary.
Response: The NC Division of Waste Management, Solid Waste Section, has
approved and issued all required permits for the LCID. A copy of the
permit is attached.. Please note that the area for LCID is within the current
and future Mining Area. After the area is mined, the LCID is proposed as
the Reclamation of this area. The area will be requested for release upon
conclusion of mining and prior to planned reclamation.
2. Please provide post mining contours for the entire site, including mined areas.
Response: The contours for the fully graded post-mined site are shown on Sheet C5
as included in this revised set of drawing.
3. Please modify the label "2 Acre LCID Landfill"to "Inactive 2 Acre LCID Landfill."
Response. The label "2 Acre LCID Landfi r has been changed to "Inactive 2 Acre
LCID Landfill."
PO Box 429, GARNER, NC 27529
Page 2
401 Sand Co, ADI response
4. Please show and label all stream location with the 75 foot undisturbed stream buffers
that is (sic) located near Basins 1 and 3. This includes showing the existing stream
crossing location and the associated erosion control measures (vegetated diversion
berm and silt fence) which is (sic) located near Sediment Basin 1.
Response: The 75-foot stream buffer has been shown on the revised plans.
5. Please address the location of Sediment Basin 1, which appears to be located in the
wetland associated with the previously mentioned stream.
Response: Sediment Basin 9 was relocated as shown on the revised site plans.
6. Please show the locations of the baffles, dewatering devices, and outlets for all the
Sediment Basins, including the existing Sediment Basins.
Response: The detail sheet, Sheet D4 that shows all of the basins in detail shows the
location of coir baffles, the emergency spillway, riser and skimmer
dewatering device.
7. Please show how runoff will be conveyed to the Basins, by detailing ditch, etc.on map.
Response: The revised plans show flow directions for overland flow and diversion
swales to convey runoff to the sediment basins.
8. Include a (sic) construction drawing, specification, and maintenance requirements for
the perimeter berm. Provide maintenance requirements for the surface dewatering
device (skimmer).
Response: The specification for the perimeter berm is shown on Sheet D2 of the
revised set of drawings.
9. Please remove Weeping Love Grass from the permanent groundcover specifications.
Response: Weeping Love Grass has been removed from the permanent groundcover
specifications shown on Sheet D3.
10.Please provide an explanation as to how the new mining site will be accessed, as
there are no roads shown on the Mine Map leading to the new mining site.
Response: The new Mining Area is contiguous to the existing Mining Area. Mining
will simply proceed as a natural expansion of this existing pit. No new
roads are necessary.
Page 3
401 Sand Co, ADI response
11.A field inspection has revealed that the silt fence on Basin 1 has been undermined
and sediment was observed on the downslope of the riprap apron. Please provide
proof that your company has brought these measures into compliance.
Response. This has been remedied by the Owner.
We trust this information will allow you to complete your review of this modification
request. If you have any questions, or need further information, please contact me.
Sincerely,
2ames�Clzzell, Jr., PG
Carolina Geological Services, Inc.
enclosures