Loading...
HomeMy WebLinkAbout47-16 - 05_Melissa comments and inspection 20190430 Wehner, Judy From: James Izzell <ncgeology@yahoo.com> Sent: Tuesday, April 23, 2019 6:36 PM To: Joyner, Melissa Cc: Wehner,Judy Subject: [External] Re:401 Sand Company, LLC A & H Mine LCID Landfill Corrected Information The landfill is in existence and its boundary was surveyed and is shown on the map sent. All runoff from this landfill flows into Basin A as shown, and since this is already existing and approved, it was agreed in previous conversion that this would serve as the "erosion control plan". Since this is existing,functioning, and previously approved, I'm not sure what else could be submitted? The modified mining plan will be forthcoming very soon. James Izzell Sent from my Whone On Apr 23, 2019, at 2:33 PM,Joyner, Melissa <melissa.iovner@ncdenr.sov>wrote: Good afternoon, Mr. Izzell, I was speaking with Mr. Lindsay and Judy Wehner earlier today about the A& H Mine LCID Landfill recent correspondence.The landfill located near the east side of the haul road, near Existing Sediment Basin A, being referenced in the letter sent to Ms.Wehner on 4/9/2019 has never been in existence. This nonexistent landfill is also shown on the maps included with the correspondence. I will visit the mine later this week to document the reclaimed area where the landfill was not developed.There is a new, active landfill which was initiated last year near the west side of the haul road. I am not sure if it is associated with Existing Sediment Basin A. An erosion control plan needs to be submitted for the new landfill as soon as possible. Please contact me if you have any questions. Regards, Melissa Melissa Joyner Environmental Specialist Division of Energy, Mineral and Land Resources Department of Environmental Quality (910)433-3384 office melissa.joyner .ncdenr.gov 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 i <image001.png> L-mail correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 2 Wehner, Judy From: Joyner, Melissa Sent: Tuesday, April 30, 2019 5:28 PM To: Wehner, Judy Cc: Miller, David; Pace,Jodi Subject: 401 Sand Company, Inc. (47-16) Routing Sheet and Mine Inspection Report Attachments: 401 Sand Company, Inc. (47-16) Routing Sheet and IR 04292019.pdf Dear Judy, Please see the attached 401 Sand Company, Inc. (47-16) Routing Sheet and Mine Inspection Report per my inspection yesterday. Have a nice rest of the week, Melissa Melissa Joyner Environmental Specialist Division of Energy, Mineral and Land Resources Department of Environmental Quality (910)433-3384 office melissa.ioyneremcdenr.gov 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 K"- -'Nothing Compares-.,-, C� � Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 MINING CHECKLIST FOR ROUTING 1 . Applicant's Name: �(7 �� ProjectName: ELT ro Applic./Permit No: 9 7/� County: d Date Received: 4VReviewer: River Basin Name: ❑ New ❑ Modification(inside permit boundaries) ❑Zcatiot(outside permit boundaries) ❑ Transfer ❑Release Pal Release ❑ Additional Information ❑ Fee Needed:$ c _ Please rot a entire a plicatig aekage to APR 12 2013 Regional Cf flee(s complete copier,attach the"LOS Regional Off ice Mining Ap*at=Review to on ropy and attach both the DAQand DWR"Mining Application Review Form"to the other OFFICE Engineer) Date:Routed �Rec'd ❑ Division of Water Resources Date:Routed //Reed ❑ NC Wildlife Resources Commission Date:Routed Rec'd ❑ US Fish&Wildlife Service Date:Routed Rec'd (Only new applications and modif iwtion requests that add land to the permit) Please route first 3 pages of the application and any location maps to.- 0 Division of Parks&Recreation Date:Routed Reed ❑ NC Geological Survey Section Date.Routed Ree'd ❑ Division of Marine Fisheries Date:Routed Reed ❑ Division of Soil&Water Conservation (plus LEA) Date:Routed Reed (Only new applications and modifications requests that add lmid to the permit) ❑ Division of Archives&History Date:Routed Reed (0rjY new appliamts) ❑ Other: Date:Routed Reed Suspense Date for Comments: /D 1 (no later than:s daps from receipt) ❑ Please note the following: Q , y E y a/ North Carolina Department of Environmental Quality, Division of Energy, Mineral, and Land Resources MINE INSPECTION REPORT X PERMITTED MINE SITE ❑UNPERMITTED MINE SITE 1. MINE NAME: A&H Mine 2.MINE LOCATION: Doc Brown Road 3. COUNTY: Hoke 4. RIVER BASIN: Cape Fear 5. CASE: 6. OPERATOR: 401 Sand Company,LLC/Attn:John Lindsay 7. ADDRESS: P.O.Box 122,Raeford,NC 28376 _ 8. MINING PERMIT#: 47-16 ❑N/A 9. PERMIT EXPIRATION DATE: N/A I—I N/A 10. PERSON(S) CONTACTED AT SITE: Duncan Parker,John Lindsay IL PICTURES?S? N Yes ❑No TAKEN BY: Melissa Joyner 12. TYPE OF INSPECTION: ❑ A. Initial Inspection(Unpermitted Mine Sites) 1. Size of affected land: ac. (attach sketch map) 2. How was this area measured? Measured by: II B. Routine Inspection(Permitted Mine Sites) X C. Follow-up Inspection 13. Date of last inspection: 3/12/2019 14. Any mining since that date? X Yes ❑ No If yes,cite evidence of such mining activity: Additional material is removed from the mine. 15. Was mine operating at time of inspection? Yes N No If yes,explain: 16. Is the mine in compliance with the Operating Conditions of the Permit? ❑ Yes ❑No ® N/A If no,explain: _ T 17. Is the mine in compliance with the Reclamation Conditions of the Permit? ❑Yes ❑ No N N/A If no,explain: 18. Is there any off-site damage? A. ❑ Yes B.X No C. ❑ None observed If A,describe the type and severity of the damage: If B or C,is there potential for offsite damage? ❑ Yes No Explain: 19. Corrective measures needed and/or taken: 20. Other recommendations and comments: An inspection was conducted to determine if the existing 2.0 acre LCID is suitable for release.This is a new,active LCID which is not suitable for release because it is not reclaimed. A sedimentation and erosion control plan has not been submitted to our Office(DEMLR)for this LCID. Is the Annual Reclamation Report+/-map accurate? ❑Yes❑No(Explain)X Not Reviewed❑N/A _ 22. Follow-up inspection needed? ❑ Yes N No Proposed date 23. No.of additional pages of Inspection Report 24. Copy of Report sent to operator 4/30/2019 INSPECTED BY: Melissa Joyner DATE 4/29/2019 __- Telephone No: 910-433-3384 Copy to file Copy to operator Copy to Mining Specialist