Loading...
HomeMy WebLinkAboutRail Correspondence Parr, Adam From: davek@bissellprofessionalgroup.com Sent: Friday, January 22, 2021 12:58 PM To: 'Mary Cole' Cc: Mark Bissell; Marcie Respass Subject: RE:4725 Bell Ballance farm Mary Thank you for the response.APVA is closing on the property any day now (supposedly today) and will own both sides of the track.As soon as the closing occurs I will have the owner sign the forms and email them to you. Is there a way that the owner can pay electronically? If so,I will find out how they would like to send payment and let you know. Best Regards, David KIebitz From: Mary Cole<mary.cole@gwrr.com> Sent: Friday,January 22, 2021 12:38 PM To: davek@bissellprofessionalgroup.com Cc: Mark Bissell <mark@bissellprofessionalgroup.com>; Marcie Respass<admin@bissellprofessionalgroup.com> Subject: RE: 4725 Bell Ballance farm David, My apologies. I must have overlooked your previous email. It appears that the applications and plans are in order to submit for processing. There is only one other question that I can think of at this time. If APVA, Inc. is not the land owner of the property that this crossing will connect (both sides of the track) we will need to have something in writing from the land owner(s) authorizing APVA, Inc. the use of the land to access the crossing requested to be installed. I can accept the forms and plans electronically but will need to know if you will be mailing in the check(s). I work every other week in the office so in the event an overnight package will be submitted, please give me a heads up so I can have someone look out for it on my out-of-the-office week. Thanks, Mary Cole Real Estate Manager Genesee&Wyoming Railroad Services, Inc. 13901 Sutton Park Drive South, Suite 270 Jacksonville, FL 32224 (904) 900-6302 From: davek@bissellprofessionalgroup.com <davek@bissellprofessionalgroup.com> Sent: Friday,January 22, 2021 12:01 PM To: Mary Cole<mary.cole@gwrr.com> 1 Cc: Mark Bissell <mark@ bissellprofessionalgroup.com>; Marcie Respass<admin@ bissellprofessionalgroup.com> Subject: FW: 4725 Bell Ballance farm Good afternoon,Ms. Cole I am following up to make sure you received my prior email below and the attachments. Our client is anxious to get this submitted and is likely going to pay the additional fee for an express review.My goal is to try to give you everything you need with the first submission.I look forward to hearing back. Best Regards, David KIebitz From: davek@bissellprofessionalgroup.com <davek@bissellprofessionalgroup.com> Sent:Thursday,January 14, 20212:41 PM To: 'Mary Cole' <mary.cole@gwrr.com> Cc: Mark Bissell <mark@ bissellprofessionalgroup.com>; Marcie Respass<admin@ bissellprofessionalgroup.com> Subject: RE: 4725 Bell Ballance farm Good afternoon Ms. Cole, I hope you are doing well and enjoyed the holidays! I am following up to the previous correspondence below with the attached unsigned completed copies of the Grade Crossing Application,Right of Entry Application and related project design drawings. Included on Sheet 3 of the drawings are a detailed plan inset,construction notes and details regarding the proposed modification of an existing gravel farm road crossing to an asphalt roadway crossing. Since we submit these applications so infrequently,I was hoping you would be able to provide a cursory review these documents and let me know if any additional general information will be needed and/or if there is an immediate concern with the proposal. Our client is likely going to request an express review and it would be great to correct anything you may see now,rather than after the application is made. Also,just so I can confirm to our client,the application fees appear to be following: • Crossing and Entry Applications: $4,500 • Expedited Processing: $2,500 Total = $7,000 I thank you for your time and assistance in this matter and if you have any questions or need additional information,please do not hesitate to ask.I look forward to hearing back from you. Best Regards, David M. Klebitz,PE plaw lk Celebrating Innovative Services Since 1985! PO Box 1068 * 3512 N. Croatan Hwy. * Kitty Hawk,NC 27949 0: (252) 261-3266 x 244 F: (252) 261-1760 Firm License # C-0956 2 www.bissefll2rofessionalgroul2.com FwdL%OP Facebook "Like" Bissell Professional Group From: Mary Cole<mary.cole@gwrr.com> Sent: Monday,July 13, 2020 12:35 PM To: Mark Bissell <mark@bisselIprofessionalgroup.com> Cc: 'David Klebitz' <davek@bisselI profession algroup.com>; 'Marcie Respass' <admin@bissellprofessionalgroup.com> Subject: RE: 4725 Bell Ballance farm Mark, Attached is the grade crossing application for your convenience. As stated, it would be best to have the plans provided along with the application so engineering can review and address any issues if needed prior to the time needed for the crossing to be ready to go. Just to reiterate the railroad does have a list of contractors that are approved for installations of crossings. Using one of the approved contractors will reduce the need for your own contractor going through the process of being approved. Below is the link to our website that will give you guidance for the application process: https://gwrr.com/real estate/grade crossings Right of Entry process (for contractor) : https://gwrr.com/real estate/accessing property I mis-spoke regarding the grading specs being on the website. I have attached examples of plans to help with your plan preparation. Depending on the volume and size of the trucks that will be using the crossing, the engineering department can specify if an aggregate, asphalt, or concrete crossing will be required. Road crossing application can be forwarded to me at the address below my name. The check can be made out to Maryland Midland Railway for the application and engineering fees. Let me know if you have any questions. Thanks, Mary Cole Real Estate Manager Genesee&Wyoming Railroad Services, Inc. 13901 Sutton Park Drive South, Suite 270 Jacksonville, FL 32224 (904) 900-6302 From: Mark Bissell <mark@bissellprofessionalgroup.com> Sent: Monday,June 29, 2020 10:06 AM To: Mary Cole<mary.cole@gwrr.com> Cc: 'David Klebitz' <davek@bissellprofessionalgroup.com>; 'Marcie Respass' <admin@bissellprofessionalgroup.com> Subject:4725 Bell Ballance farm Good morning Mary, 3 I am attaching an aerial that shows the property we are working with that I mentioned in the voice message this morning. The aerial notes the two existing farm crossings. Our plan would involve utilizing the northern crossing and abandoning the southern crossing on this property. I understand there will be a formal review process, but if you would please call me, I would like to discuss the general plan before we start the application process. Thank you, Mark S.Bissell,PE W9W I K . 7 C Oa ' Celebrating Innovative Services Since 1985! 3512 N.Croatan Hwy.*PO Box 1068*Kitty Hawk,NC 27949 0: (252)261-3266 F: (252) 261-1760 C: (252) 202-1215 Firm License#C-0956 www.bisseUl2rofessionalgEoul2.co _ "Like"Bissell Professional Group 4