Loading...
HomeMy WebLinkAboutDWR 27-55 - 02_BALLANCE TRACT MINE Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM THIS SECTION TO BE OUT BY DEIVILR DEMLR PERMIT: 27-55 Project Acti!7t Modification Transfer Release Applicant Name: Allied Properties, LLC Applicant's Email: countryscapesclay@hotmail.com County: Currituck Project Name: Ballance Tract Mine YES NO Date Commencing Have land disturbing activities started?? X Latitude: 36.4596 Longitude: -76.1198 Please return comments to (at DEMLR CO): Adam Parr adam.parr@ncdenr.gov Comments due by: 12/18/2021 SECTION • TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? P Is the RO concerned that the operation, as proposed, would violate standards of water quality? F I I ✓ Comments: Does this mine (or previous owner) have DWR back fees to pay? (If Yes, amount): Watershed/Stream Name & Classification: UT to NEW BRIDGE CREEK DWR Compliance Status of Mine: 401 Wetland Cert. required? ✓ 401 Wetland Cert. existing? ✓ (If Yes, Permit#): Does DWR RO have enough information to determine if a 401 certification is required? Z I ❑ Is an O & M Plan needed? ✓ Are wetlands disturbed at this site? z Does DWR RO suspect or know of nearby wetlands to the site? I �✓ ❑ Is a wetland delineation required prior to DWR issuing the permit? I ✓ JD Consultant Onsite ❑ Offsite ❑ ❑ Stream Determination Needed? I ❑ I Z Stream Determination Completed? 1 ❑ z Does DWR RO need a statement that no wetlands/streams are disturbed for this project ❑ ❑✓ from applicant? Buffer Determination Needed? ✓ Buffer Determination Completed? �✓ Recycle system permit existing? Ll 1 ❑ (If Yes, Permit#): New Recycle System permit required? ❑ ✓ Enough information to determine? 1�✓ El I Rev. December 2020-2020rl Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non-discharge permit existing? ✓ (If Yes, Permit#): Will wastewaters discharge to HQW waters with a 7Q10=0? ✓ 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or ❑✓ ❑ because DWR requires more information)? Has Violation O&M Requirements ❑ HQW/7Q10 Concerns 1 El Pay back fees or renew DWR permit ❑ ❑ Other Please describe the reason to hold the permit: RO contact: I Hold Until: Mine must wait to dewater until an O&M plan is approved? L Z_ Reviewed by 77777 Central Office Date Regional Office Date DWR RO Surface Water I ROBERT TANKARD 01/08/2021 RO Aquifer Protection Section Rev. December 2020-2020r1