Loading...
HomeMy WebLinkAbout20221130_Water_Withdrawal From: ken(cDkenobx.com To: Bauer,Michael; Parr,Adam Cc: "buddy Smith" Subject: [External]Water Withdrawal Registration for Buddy Smith Mine,Tyrrell County Date: Wednesday,November 30,2022 10:54:30 AM Attachments: BS-WaterUsaaeReaistration-102922.pdf CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to Report Spam. Michael, Hope you are doing well. Mr. Alvin R. Smith, mining permit applicant for the Buddy Smith Mine in Tyrrell County, received a notification letter from your office noting the need for water withdrawal registration for his project. A signed copy of the registration dated October 29 was sent to your office along with the $50 registration fee the first week of November. Attached are copies of the registration form, please let me know if these have not been received. Thanks, Ken Ken Elliott Elliott Consulting PO Box 112 Aydlett, NC 27916 USA Phone: 252-339-9021 Email: ken@kenobx.com WATER WITHDRAWAL AND NCD Division of Water Resources 1611 Mail Service Center TRANSFER REGISTRATION RaTe(,9N)707 -99021 Ke ortin Year Fax:(919)733-3558 p g _ Web:htto://www.ncwater.oro ECTION 1: FACILITY INFORMATION 1-A. Facilitv Name: For Office Use Only 1-B. Owner Name: Registration#: 1-C. Address: Citv: State: Zio Code: 1-D. Countv: 1-E. River Sub-Basin: 1-F. Contact Person: 1-G. Title: 1-H. Telephone: ( ) 1-I. Fax: 1-J. Email: 1-K. Water Use Type(select one): ❑ Agriculture-aquaculture ❑ Industrial-metal/plastic/fiberglass manufacturing ❑ Agriculture-row-crop farming and research ❑ Industrial-animal processing ❑ Agriculture-land drainage/waterfowl impoundments ❑ Industrial-textile manufacturing ❑ Agriculture-plant nursery ❑ Industrial-wood/paper products ❑ Agriculture-sod and turf production ❑ Industrial-environmental remediation ❑ Agriculture-Christmas tree production ❑ Mining-mineral extraction ❑ Agriculture-animal production ❑ PWS-drinking water(ID# ) ❑ Energy-hydropower ❑ Recreation-temporary filling of ponds ❑ Energy-pipeline testing(temporary) ❑ Recreation-golf course ❑ Energy-thermal-electric(steam-electric power,nuclear, El Recreation-snowmaking turbine generator) ❑ Industrial-chemical and pharmaceutical manufacturing/processing El sports SECTION 2: WITHDRAWAL INFORMATION 2-A. Average daily withdrawal and maximum da withdrawal by month in million gallons per day MGD . Average Daily Maximum Day Average Daily Maximum Day Month #of Days Withdrawal Withdrawal Month #of Days Withdrawal Withdrawal Used MGD MGD Used MGD MGD Jan July Feb Aug Mar Sep Apr Oct May Nov Jun Dec 2-B. Ground Water Information—Please complete a row for each ground water withdrawal source used in 2009. Well Pump Screen Depth Well Average #of Pumping Well or Sump Latitude Longitude Depth Intake Diameter Daily days Capacity Identifier (35.123456) (-77.123456) (Feet) Depth Top Feet Bet (Inches) Withdrawal used (MGD) Feet ( ) (Feet) MGD 2-C. Surface Water Information—Please complete a row for each surface water withdrawal source used in 2009. Source Latitude Longitude Average Daily #of Pumping Source Identifier Type (35.123456) (-77.123456) Withdrawal days Sub-Basin Capacity MGD used MGD Source Type—Choose one of the following: Lake, Pond,Quarry, Reservoir,River,or Stream. Rev.05/08/2017 1 SECTION 3:DISCHARGE INFORMATION 3-A. Enter the average dailyamount of water disc har ed each month in million gallons per day MGD . Average Daily Maximum Day Average Daily Maximum Day Dischared Month #of Days Discharge Discharge Month #of Days Discharge Discharge Discharged MGD MGD g MGD MGD Jan July Feb Aug Mar Sep Apr Oct May Nov Jun Dec 3-B. Please complete a row for each discharge method. Identifier or 'Discharge Latitude Longitude Average Daily #of Permitted Permit Number Type (35.123456) (-77.123456) Discharge Days Sub-Basin Capacity (MGD) Used (MGD) Discharge Type-Choose one of the following: Discharge,Hydropower,Land Application,Subsurface,or To Another System. SECTION 4:SURFACE WATER BASIN TRANSFER Complete this section if you withdraw or purchase water that is not returned to the river sub-basin from which it was withdrawn. 4-A. Please complete a row for each transfer of surface water from one sub-basin to another. Daily Transfer Description of Transfer Source Sub-Basin Receiving Sub-Basin Capacity MGD 4-B. Enter the average daily and maximum day surface water transfer amounts by month in milliongallons per day(MGD): Average Daily Maximum Day Average Daily Maximum Day Month #of Days Transfer Transfer Month #of Days Transfer Transfer Transferred MGD MGD Transferred MGD (MGD) Jan July Feb Aug Mar Sep Apr Oct May Nov Jun Dec If latitude and longitude are unknown for any water withdrawal or discharge location listed above please submit a map clearly marking and labeling all water withdrawal and discharge locations on an appropriate US Geological Survey topographic map or a comparable map. Do you have any comments? PRINT/TYPE Name of Person Registering Signature Date Rev.05/08/2017 2