HomeMy WebLinkAbout20221130_Water_Withdrawal From: ken(cDkenobx.com
To: Bauer,Michael; Parr,Adam
Cc: "buddy Smith"
Subject: [External]Water Withdrawal Registration for Buddy Smith Mine,Tyrrell County
Date: Wednesday,November 30,2022 10:54:30 AM
Attachments: BS-WaterUsaaeReaistration-102922.pdf
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an
attachment to Report Spam.
Michael,
Hope you are doing well. Mr. Alvin R. Smith, mining permit applicant for the Buddy Smith Mine in
Tyrrell County, received a notification letter from your office noting the need for water withdrawal
registration for his project. A signed copy of the registration dated October 29 was sent to your
office along with the $50 registration fee the first week of November. Attached are copies of the
registration form, please let me know if these have not been received.
Thanks,
Ken
Ken Elliott
Elliott Consulting
PO Box 112
Aydlett, NC 27916 USA
Phone: 252-339-9021
Email: ken@kenobx.com
WATER WITHDRAWAL AND NCD Division of Water
Resources
1611 Mail Service Center
TRANSFER REGISTRATION RaTe(,9N)707 -99021
Ke ortin Year Fax:(919)733-3558
p g _ Web:htto://www.ncwater.oro
ECTION 1: FACILITY INFORMATION
1-A. Facilitv Name: For Office Use Only
1-B. Owner Name: Registration#:
1-C. Address:
Citv: State: Zio Code:
1-D. Countv: 1-E. River Sub-Basin:
1-F. Contact Person: 1-G. Title:
1-H. Telephone: ( ) 1-I. Fax:
1-J. Email:
1-K. Water Use Type(select one):
❑ Agriculture-aquaculture ❑ Industrial-metal/plastic/fiberglass manufacturing
❑ Agriculture-row-crop farming and research ❑ Industrial-animal processing
❑ Agriculture-land drainage/waterfowl impoundments ❑ Industrial-textile manufacturing
❑ Agriculture-plant nursery ❑ Industrial-wood/paper products
❑ Agriculture-sod and turf production ❑ Industrial-environmental remediation
❑ Agriculture-Christmas tree production ❑ Mining-mineral extraction
❑ Agriculture-animal production ❑ PWS-drinking water(ID# )
❑ Energy-hydropower ❑ Recreation-temporary filling of ponds
❑ Energy-pipeline testing(temporary) ❑ Recreation-golf course
❑ Energy-thermal-electric(steam-electric power,nuclear,
El Recreation-snowmaking
turbine generator)
❑ Industrial-chemical and pharmaceutical
manufacturing/processing El
sports
SECTION 2: WITHDRAWAL INFORMATION
2-A. Average daily withdrawal and maximum da withdrawal by month in million gallons per day MGD .
Average Daily Maximum Day Average Daily Maximum Day
Month #of Days Withdrawal Withdrawal Month #of Days Withdrawal Withdrawal
Used MGD MGD Used MGD MGD
Jan July
Feb Aug
Mar Sep
Apr Oct
May Nov
Jun Dec
2-B. Ground Water Information—Please complete a row for each ground water withdrawal source used in 2009.
Well Pump Screen Depth Well Average #of Pumping
Well or Sump Latitude Longitude Depth Intake Diameter Daily days Capacity
Identifier (35.123456) (-77.123456) (Feet) Depth Top Feet Bet (Inches) Withdrawal used (MGD)
Feet ( ) (Feet) MGD
2-C. Surface Water Information—Please complete a row for each surface water withdrawal source used in 2009.
Source Latitude Longitude Average Daily #of Pumping
Source Identifier Type (35.123456) (-77.123456) Withdrawal days Sub-Basin Capacity
MGD used MGD
Source Type—Choose one of the following: Lake, Pond,Quarry, Reservoir,River,or Stream.
Rev.05/08/2017 1
SECTION 3:DISCHARGE INFORMATION
3-A. Enter the average dailyamount of water disc har ed each month in million gallons per day MGD .
Average Daily Maximum Day Average Daily Maximum Day
Dischared
Month #of Days Discharge Discharge Month #of Days Discharge Discharge
Discharged MGD MGD g MGD MGD
Jan July
Feb Aug
Mar Sep
Apr Oct
May Nov
Jun Dec
3-B. Please complete a row for each discharge method.
Identifier or 'Discharge Latitude Longitude Average Daily #of Permitted
Permit Number Type (35.123456) (-77.123456) Discharge Days Sub-Basin Capacity
(MGD) Used (MGD)
Discharge Type-Choose one of the following: Discharge,Hydropower,Land Application,Subsurface,or To Another System.
SECTION 4:SURFACE WATER BASIN TRANSFER
Complete this section if you withdraw or purchase water that is not returned to the river sub-basin from which it was withdrawn.
4-A. Please complete a row for each transfer of surface water from one sub-basin to another.
Daily Transfer
Description of Transfer Source Sub-Basin Receiving Sub-Basin Capacity
MGD
4-B. Enter the average daily and maximum day surface water transfer amounts by month in milliongallons per day(MGD):
Average Daily Maximum Day Average Daily Maximum Day
Month #of Days Transfer Transfer Month #of Days Transfer Transfer
Transferred MGD MGD Transferred MGD (MGD)
Jan July
Feb Aug
Mar Sep
Apr Oct
May Nov
Jun Dec
If latitude and longitude are unknown for any water withdrawal or discharge location listed above please submit a map clearly
marking and labeling all water withdrawal and discharge locations on an appropriate US Geological Survey topographic map or a
comparable map.
Do you have any comments?
PRINT/TYPE Name of Person Registering Signature Date
Rev.05/08/2017 2