Loading...
HomeMy WebLinkAbout20230202_Mine_Map�> 12MI` Lt�� FoaK5 LLe- Notes: 1. NCDOT /5 stone is preferred . Pod to be 100 ft. L x 20 rL W x 6 in. thick (min). 2. Turning radius sufficient to accomadate large trucks. 3. Must be maintained in a condition which mu prevent tracking a direct flow of mod onto streets. Periodic topdressing my be necessary. Not To Scale Figure 12-5. Gravel Construction Entrance L. OG;t�,-r I oU Mp J) t 50 RO WAn1 OUI ?rzeVIaysL� f`�lrN� 6aletINA4 G�5✓�rz i III eR 311 2: 1 �Frminnntant zi I% 1-72: 1 SLOPS � L�etnt� G/hTc-R C�o55 _ S�T4o„1 I-lo-r - TO - S -A%b c t3L,XK RWEIZ FAT2nAs Ll C wi sLa��s spa �� Ctth, J, J� YY� ,,ti7 T�tMIT U�S�LpJPGG�� G KA MEN MIN) NC LIMtT rUNE'�pJt•'Cc"'� �PERTy LIW vFcetz__3vFPEQ- E /Q M1 j T3oUN0At2 Foa #-5 LLC 0 M►NINa AveA xIVErLA�lAS I a O W p 4 ry a5(3x'PeizJP'('E� SpINgUGGE2 — �tNE / PERM1t BOVNs7�RY E zM- 3R Ltm11 Jp�gO P,R , F 2 '>t eogd 5 t,FF ErZ Q M IMINC ATZE A :ry "ll. pjZOrin� Y _...r r mou a ! i p° W G'CLLIND 5 �/ � Qcr 1 NS2,E a3 t Y _ Y1E(LANDS `so. d1 Z 3 T-ouKs LLC M $ � NEW 1 b t" j[0i.�p ��3 MINltJG LI m IT lit a- p � r F c z z � N / N / G LIMI 1 �7,�y - (jN i315T(TlZt3c� �J i� v ayFYE(i V WE+t.anr� 0 umlT sru�t /J f9� W6CLPN9 L1 t \ } '4'tefLWPX MINING �� /uMK-fit\ L It M 1-r �; \ pEiLtME is a� q M1NIrt s Aizi,4 Ad R4vT M11411UG \ - /�t2�0. roRKS 9� E,9 RnCa EL $tJt2N"c7 0 ptv'ti4oprq ��Y h� jjoNpV+.tTEMPtE SmITH / iZPNMONO �K'ES Kts4TR1L - NEtiznlrJ6 FttE9fix�ut aaH�S �aRT� MINING Le M IT CATEGORY CURRENT AFFECTED PROPOSED CHANGE TO TOTAL AFFECTED ACREAGE AFFECTED ACREAGE ACREAGE Tailklgs/Sediment Ponds 0.00 0 .00 Stockpiles 3.00 3.00 Waste piles 0.00 0.00 Processing Areas/Haul Roads 4.50 4.50 Mine Excavations 427.70 129.60 557.30 Other (Please explain) Total Aflectad Acreage 435.20 564.80 Total Permitted Acnaage 515.00 665.00 male', G. KmmotJ {-4Z.t.YtE r:1Z tDetNM�C610N AREA tNtt' If rL.l M 5it1Z 'F3c`iL.n rY11NI/JS AI to 19�0-01II7� P�M�/� i„DDY -Roos) 5� tJo5 p-(Z4Y `l NE �cr 'BpvN�R`t i 4ac' SAYS 3 ft loin. <' 514etLRILL Me. I PI I^ eg—CANTILE Q - ttou S& + ws LL lx/fiN �rY6�o't'MENT Q-HOW5G+w2LL III A'2 N V A E IROT%U CELL 2 Q�ru—Flaauedr kit'tion ft, 11 Sol Berm Berm Construction Specifications: I. Construct berm by placement of topsoil and overburden token from initially disturbed areas. 2. Prior to placement of materials for berm formation, cut vegetation nearly, flush with ground. 3. Compact materials in Iftlifts by construction traffic. N w Ili o tdol To Scale 4 U9 ti Figure 12-3. Temporary Diversion Berm Detail 2023 Modification This modification adds 150 acres to the permitted area, with 129.6 acres of this new area to be disturbed by mining. The new area is adjacent to the existing mine, connected by a 50 foot wide access. The mined sand and gravel will be hauled to the existing processing plant. All disturbed areas are surrounded by a perimeter berm, which prevents any offsite sedimentation. This mine does not discharge any stormwater or groundwater. Any dewatering of the new mining area will be pumped into the existing mine, which allows excess water to be infiltrated into the soil without any discharge. Upon completion of mining, all excavations will be reclaimed as a pond. Any disturbed areas above water table will be graded and deeded according to approved revegetation schedule. j VAAI PIT Z - PERrY\%-( SCALE DRAWN SY SAmPsot./ Lour, �y C - 3REVISED �tK")RE t/15� i —1`i -7- AMrTz.Ic.AfV MA--ERtAL.S CotvLPar.ry r L Lc •gvtseo (P-3-06 DATE DRAWING NUMBER R<V t5i 4 - ►'� -6 12 2$ D % 7CA"M N_zc �t�lt /vi z c t 3