Loading...
HomeMy WebLinkAbout20230126_Modification_55-02 ROY COOPER Governor ELIZABETH S. BISER Secretary DOUGLAS R. ANSEL NORTH CAROLINA Interim Director Environmental Quality January 26,2023 Jay Nivens Martin Marietta Materials, Inc. 8701 Red Oak Blvd. Suite 540 Charlotte,NC 28217 RE: Denver Quarry Mining Permit No. 55-02 Lincoln County Catawba River Basin Dear Mr.Nivens: Your recent request to have the above referenced mining permit modified has been approved. The modification is to increase the affected acreage to 110.4 acres as indicated in the application and the mine maps received December 5, 2022. The modification includes relocating Killian's Creek tributary to allow for future pit expansion; modification of the S&EC plans for the relocated stream;construction of an internal roadway and associated culvert; mitigation for the crossing; and the addition of 2 overburden storage areas and associated sediment and erosion control design. A copy of the modified permit is enclosed. The conditions in the modified permit were based primarily upon the initial application. Modifications were made as indicated by the modification request and as required to ensure compliance with The Mining Act of 1971. The mine name and permit number shall remain the same as before the modification. 1 would like to draw your particular attention to the following conditions where minor additions or changes were made: III.3.C, III.4.B,III.4.C, 111.103, IIL11, IV,V.1.B,VI, VIII.3 The issuance of a mining permit and/or any modification to it does not supersede local zoning regulations. The responsibility of compliance with any applicable zoning regulations lies with you. As a reminder,your permitted acreage at this site is 181.0 acres and the amount of land you are approved to disturb is 110.4 acres. Please contact me at(919) 707-9220 if you have any questions. Sincer David Miller, PE State Mining Engineer DM/ap Enclosures cc: Mr.Zahid Khan �DWQ North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh.North Carolina 276 9 9-1612 * _ r^'�^"°"�"oOs°�\ � 919.707.9200 DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY,MINERAL,AND LAND RESOURCES LAND QUALITY SECTION PERMIT For the operation of a mining activity In accordance with the provisions of N.C.G.S. §74-46 through 68,"The Mining Act of 1971,"Mining Permit Rule 15A NCAC 05B,and other applicable laws,rules,and regulations Permission is hereby granted to: Martin Marietta Materials, Inc. Denver Quarry Lincoln County-Permit No. 55-02 for the operation of a Crushed Stone Quarry Which shall provide that the usefulness,productivity and scenic values of all lands and waters affected by this mining operation will receive the greatest practical degree of protection and restoration. Page 2 In accordance with the application for this mining permit, which is hereby approved by the Department of Environmental Quality,hereinafter referred to as the Department,and in conformity with the approved Reclamation Plan attached to and incorporated as part of this permit, provisions must be made for the protection of the surrounding environment and for reclamation of the land and water affected by the permitted mining operation. This permit is expressly conditioned upon compliance with all the requirements of the approved Reclamation Plan. However,completed performance of the approved Reclamation Plan is a separable obligation,secured by the bond or other security on file with the Department,and may survive the revocation or suspension of this permit. This permit is not transferable by the permittee with the following exception: If another operator succeeds to the interest of the permittee in the permitted mining operation, by virtue of a sale, lease,assignment or otherwise, the Department may release the permittee from the duties imposed upon him by the conditions of his permit and by the Mining Act with reference to the permitted operation, and transfer the permit to the successor operator, provided that both operators have complied with the requirements of the Mining Act and that the successor operator agrees to assume the duties of the permittee with reference to reclamation of the affected land and posts a suitable bond or other security. In the event that the Department determines that the permittee or permittee's successor is not complying with the Reclamation Plan or other terms and conditions of this permit or is failing to achieve the purposes and requirements of the Mining Act,the Department may give the operator written notice of its intent to modify, revoke or suspend the permit,or its intent to modify the Reclamation Plan as incorporated in the permit. The operator shall have right to a hearing at a designated time and place on any proposed modification, revocation, or suspension by the Department. Alternatively,and in addition to the above,the Department may institute other enforcement procedures authorized by law. I. Definitions. N.C.G.S. §74-49. Wherever used or referred to in this permit,unless the context clearly indicates otherwise,terms shall have the same meaning as supplied by the Mining Act,N.C.G.S. §74-49. II. Modifications. N.C.G.S. §74-52. June 12, 1989: This permit has been modified to include the Piping and Creek Relocation Plan last revised on June 30, 1986. July 7, 1993: This permit has been modified to include the addition of two acres north of the crusher and the construction of a new berm west of the pit area as indicated on the Mine Map, last revised January 4, 1991 and received by the Land Quality Section on May 10, 1993. In addition,the 0.5 acre tract identified as the Bud and Kathryn Lee property has been released from the permitted acreage. May 14, 1996: This permit has been modified to add 0.22 acre to extend the upstream end of the existing 24 inch CMP approximately 60 feet. This modification includes placement and compaction of fill over said pipe as noted on the Mine Map received by the Land Quality Section on April 3, 1996, for the future relocation of the access road. December 31, 1996: This permit has been modified to allow an 18 acre pit expansion and the associated sediment and erosion control measures as shown on the Mine Map last revised November 12, 1996. April 10,2001: This permit has been modified to add 7.42 acres of affected area northeast of the existing pit for the expansion of the shop area and to provide a temporary stockpile of process material during the new primary plant construction as indicated on the Mine Map last revised March 23,2001. In addition,the 1.3 acre buffer area at the site requested to be released, as indicated on said map, has been released from the permitted acreage. Page 3 November 21,2001: This permit has been modified to increase the permitted acreage by 11.48 acres and the affected acreage by 9.0 acres to include the Future Stockpile and Proposed Dam/Pond as indicated on the Mine Map dated May 12, 1999,and last revised on August 27,2001. November 26,2002: This permit has been modified to add 1.6 acres to the affected acreage at the site for the construction of an access road, including its associated erosion and sedimentation control measures. This modification also includes an adjustment to the approved affected acreage at this site by reducing the affected acreage from 124.64 acres to 83.04 acres in light of improved mapping techniques. November 4, 2003: This permit has been modified to increase the affected acreage at this site to 86.75 acres as indicated on the Mine Map last revised September 11,2003. The modification includes expansion of the northwestern overburden storage berm area and the installation and maintenance of associated sediment and erosion control measures. September 6,2005: This permit has been modified to decrease the permitted acreage from 164.68 acres to 138.91 acres and the affected acreage from 86.75 to 76.1 acres at this site as indicated on the Mine Map last revised July 21,2005. This modification includes the expansion of the pit to the southeast,addition of a new berm along the southwestern pit limit,the construction of a new pit access and freshwater pond,and the release of 25.77 acres. July 12,2006: This permit has been modified to increase the affected acreage at this site to 81.05 acres as indicated on the Mine Map last revised May 30, 2006. The modification includes the addition of an overburden disposal berm near the entrance and the installation and maintenance of all associated sedimentation and erosion control measures. June 14,2007: This permit has been modified to increase the permitted acreage at this site to 183.14 acres and the affected acreage to 97.1 as indicated on the Mine Map last revised April 9,2007. The modification includes the expansion of the mine excavation area to the south and expansion of the permit boundary to the south and east. The modification also includes adjustments to the acreage numbers due to better mapping. July 15, 2013: This permit has been modified to change the corporate name from Martin Marietta Aggregates to Martin Marietta Materials, Inc. November 5, 2015: This permit has been modified to decrease the permitted acreage to 181.0 acres and increase the affected acreage at this site to 97.2 acres as indicated on the Mine Map last revised July 20, 2015. This modification includes the addition of.4 acres of buffer land along the southeastern permit boundary, the installation of a culvert under the berm running parallel to Hwy. 16 and the removal of a berm adjacent to the office/scale house. In addition,the modification allows the use of rip rap rock baffles in the erosion control basins in lieu of porous baffles. December 1,2017: This permit has been issued for the life of site or the duration of the lease term. January 26,2023: This permit has been modified to increase the affected acreage to 110.4 acres as indicated in the application and the mine maps received December 5, 2022. The modification includes relocating Killian's Creek tributary to allow for future pit expansion;modification of the S&EC plans for the relocated stream; construction of an internal roadway and associated culvert; mitigation for the crossing; and the addition of 2 overburden storage areas and associated sediment and erosion control design. The permitted area at this site is 181.0 acres and the area approved to disturb is 110.4 acres. This permit is valid for the life of the site or life of lease, if applicable, as defined by Session Law 2017- 209 and has no expiration date. However, all provisions of N.C.G.S. §74-51 and N.C.G.S. §74-52 still apply for new,transferred,and modified mining permits. Page 4 III. Operating Conditions. N.C.G.S. This Permit shall be subject to the provisions of the Mining Act, N.C.G.S. §74-46, et. seq., and to the following conditions and limitations: 1. Wastewater and Quarry Dewatering. A. Any wastewater processing or mine dewatering shall be in accordance with the permitting requirements and rules promulgated by the N.C.Environmental Management Commission. B. Any stormwater runoff from the affected areas at the site shall be in accordance with any applicable permit requirements and regulations promulgated by the Environmental Protection Agency and enforced by the N.C. Environmental Management Commission. It shall be the permittee's responsibility to contact the Stormwater Program to secure any necessary stormwater permits or other approval documents. 2. Air Quality and Dust Control. A. Any mining process producing air contamination emissions shall be subject to the permitting requirements and rules promulgated by the N.C. Environmental Management Commission and enforced by the Division of Air Quality. B. During mining operations, water trucks or other means that may be necessary shall be utilized to prevent dust from leaving the permitted area. 3. Buffer Zones. A. Any mining activity affecting waters of the State,waters of the U. S.,or wetlands shall be in accordance with the requirements and regulations promulgated and enforced by the N. C. Environmental Management Commission. B. Sufficient buffer as indicated on the Mine Maps received December 5, 2022, shall be maintained between any affected land and any adjoining waterway or wetland to prevent sedimentation of that waterway or wetland from erosion of the affected land and to preserve the integrity of the natural watercourse or wetland. C. All buffer zones shown on the Mine Maps received December 5,2022 shall be maintained to protect adjoining property. These buffer zones,with the exception of the installation of required sediment control measures and approved earthen berms,shall remain undisturbed. 4. Erosion and Sediment Control. A. Adequate mechanical barriers including but not limited to diversions, earthen dikes, sediment check dams, sediment retarding structures, rip rap pits, or ditches shall be provided in the initial stages of any land disturbance and maintained to prevent sediment from discharging onto adjacent surface areas or into any lake, wetland, or natural watercourse in proximity to the affected land. B. All mining activities, including the installation and maintenance of all associated erosion and sediment control measures, shall be conducted as indicated on the Mine Map last revised July 20, 2015 and the supplemental information received by the Land Quality Section on August 11,2015 and October 2,2015. C. All mining activities associated with the 2023 modification to relocate Killian's Creek tributary, including the installation and maintenance of all erosion and sedimentation control measures,shall be conducted as indicated on the Mine Maps received December 5, 2022. Page 5 D. An erosion and sediment control plan(s)shall be submitted to the Department for approval prior to any land disturbing activities not indicated on the revised erosion control plan or mine maps submitted with the approved application for a mining permit and any approved revisions to it. Such areas include,but are not limited to,expansion outside of the approved pit area,creek crossings,or expansion of overburden or waste disposal areas. 5. Groundwater Protection. Groundwater monitoring wells shall be installed and monitored as deemed appropriate by the Department. 6. Graded Slopes and Fills. A. The angle for graded slopes and fills shall be no greater than the angle which can be retained by vegetative cover or other adequate erosion control measure, structure, or device. In any event,exposed slopes or any excavated channels,the erosion of which may cause off-site damage because of siltation, shall be planted, or otherwise provided with groundcover,devices,or structures sufficient to restrain such erosion. B. Overburden cut slopes along any pit expansion conducted after July 7, 1993 shall be graded to a minimum 2 horizontal to 1 vertical or flatter and shall be stabilized within 60 days of completion. Furthermore,a minimum ten (10) foot wide horizontal safety bench shall be provided at the top of the rock and at the toe of any overburden slope. C. Waste rock piles shall not be constructed with steep,near vertical side slopes. Side slopes shall be constructed in such a manner as to provide for a stable, safe configuration at reclamation. 7. Surface Drainage. The affected land shall be graded so as to prevent collection of pools of water that are,or likely to become, noxious or foul. Necessary structures such as drainage ditches or conduits shall be constructed or installed when required to prevent such conditions. 8. Blasting. A. The operator shall monitor each blast with a seismograph located at a distance no farther than the closest off site regularly occupied structure not owned or leased by the operator. A seismographic record including peak particle velocity, air overpressure, and vibration frequency levels shall be kept for each blast(except as provided under Operating Condition Nos.II1.8.0 and III.8.E of this permit).The following blasting conditions shall be observed by the mine operator to prevent hazard to persons and adjacent property from surface blasting: B. In all blasting operations,the maximum peak particle velocity of any component of ground motion shall not exceed Figure 8-1(below) at the immediate location of any regularly occupied building outside of the permitted area such as a dwelling house, church, school, or public,commercial,or institutional building. Page 6 Figure 8-1-Allowable Peak Particle Velocity by Frequency !O.Q 10.0 r 0 2 p 2 in/sec 2.0 m 1.5 1.5 C to 1.0 a 0.9 0.7S i nJsec 0.9 s7 i 0.7 0.6 0.6 p,4 ' ' ' 0,4 EO.Z 0.3 ,x 0,2 ii 0.2 0.1 t 4 10 20 30 100 Blast Vibration Frequency, Hz Figure I Altemative blasting level critena (Source modified from figure 8-1. Bureau of Mines R 1 ago 7) C. In the event of seismograph malfunction or other condition which prevents monitoring, blasting shall be conducted in accordance with the following formulas: W=(D/DS)2 (EQ. 8.1) DS=D/W 12 (EQ. 8.2) V= 160(DS)" (EQ. 8.3) W = Maximum charge weight of explosives per delay period of 8.0 milliseconds or more(pounds). D = Distance from the blast site to the nearest inhabited building not owned or leased by the mine operator. (feet). DS = Scaled distance factor. V = Peak Particle Velocity(inches per second). The peak particle velocity of any component shall not exceed 1.0 inch per second, for the purposes of this Section. Page 7 D. Air blast overpressure resulting from surface blasting shall not exceed 129 decibels linear (dBL)as measured at the immediate location of any regularly occupied building not owned or leased by the operator outside of the permitted area such as a dwelling house, church, school,or public, commercial, or institutional building, unless an alternate level based on the sensitivity of the seismograph microphone as specified below is being used: Lower Frequency Limit of Measuring System(Hz) Max Level(dBL) 0.1 Hz or lower-flat response 134 peak 2.0 Hz or lower-flat response 133 peak 6.0 Hz or lower-flat response 129 peak E. In the event of seismograph malfunction or other condition which prevents monitoring, blasting shall be conducted in accordance with the following formulas: U= 82 (D/W0.33)-1.2 (EQ 8.4) To convert U(psi)to P(dBL): P=20 x log(U/2.9x 10-9) (EQ 8.5) Confined Air blast/Overpressure(dBL)for quarry situation: A=P- 35 (EQ8.6) U = Unconfined air overpressure(pounds per square inch). W = Maximum charge weight of explosives per delay period of 8.0 milliseconds or more(pounds). D = Distance from the blast site to the nearest inhabited building not owned or leased by the mine operator(feet). P = Unconfined air overpressure(decibels). A = Air blast or air overpressure for typical quarry situations(decibels). The air blast/overpressure shall not exceed 129 decibels,for the purposes of this Section. F. The operator shall maintain records on each individual blast describing: i. date and time of the blast. ii. the total number of holes. iii. pattern of holes and delay of intervals. iv. depth and size of holes. V. type and total pounds of explosives. vi. maximum pounds per delay interval. vii. amount of stemming and burden for each hole. viii. blast location. ix. distance from blast to closest offsite regularly occupied structure. Page 8 X. weather conditions at the time of the blast. Records shall be maintained at the permittee's mine office and copies shall be provided to the Department upon request. G. If ground vibration or Air blast limits are exceeded, the operator will immediately report the event with causes and corrective actions to the Department. Use of explosives at the blast site that produced the excessive reading shall cease until corrective actions approved by the Department are taken. However,blasting may occur in other approved areas within the permitted boundary. Authorization to blast at the blast site may be granted at the time of the verbal reporting of the high ground vibration or high air blast reading if the circumstances justify verbal approval. Failure to report will constitute a permit violation. H. The operator shall take all reasonable precautions to ensure that flyrock is not thrown beyond areas where the access is temporarily or permanently guarded by the operator. Failure to take corrective measures to prevent flyrock and repeated instances of flyrock shall be considered a violation of the Mining Permit. I. Should flyrock occur beyond the permitted and guarded areas, the operator shall immediately report the incident to the Department. Further use of explosives on the mine site shall be suspended until the following actions have been taken: i. A thorough investigation as to the cause(s)of the incident shall be conducted. ii. A report detailing the investigation shall be provided to the Department within 10 days of the incident. The report shall,at a minimum,document the cause(s)of the incident along with technical and management actions that will be taken to prevent further incidents. The report shall meet with the approval of the Department before blasting may resume at the mine site. J. The operator shall provide to the Department a copy of the findings of any seismic studies conducted at the mine site in response to an exceedance of a level allowed by these blasting conditions. The operator shall make every reasonable effort to incorporate the studies' recommendations into the production blasting program. K. The operator shall,when requested by the Department,give 24-hour advance notice to the Division of Energy,Mineral and Land Resources'Regional Office prior to any blast during a period for which notice is requested. 9. Highwall Barrier A physical barrier consisting of large boulders placed end-to-end or fencing shall be maintained at all times at the mining permit boundary to prevent inadvertent public access. In addition, a minimum 10 foot wide horizontal safety bench shall be provided at the junction between the top of rock and the toe of any overburden cut slope for any pit expansion conducted after July 7, 1993. 10. Visual Screening. A. Existing vegetation shall be maintained between the mine and public thoroughfares to screen the operation from the public. Additional screening methods, such as constructing earthen berms,shall be employed as deemed appropriate by the Department. B. Vegetated earthen berms shall be located and constructed as shown on the Mine Maps received December 5,2022. In addition to grasses, long leaf and/or Virginia pines or other acceptable evergreen species shall be planted as deemed appropriate by the Department to improve visual and noise buffering. Page 9 11. Buffer Between Mining Permit Boundaries and/or Right-of-warms. Sufficient buffer,as indicated on the Mine Maps received December 5,2022, shall be maintained between any excavation and any mining permit boundary to protect adjacent property. 12. Refuse Disposal. A. No on-site disposal of refuse or other solid waste that is generated outside of the mining permit area shall be allowed within the boundaries of the mining permit area unless authorization to conduct said disposal has first been obtained from both the Division of Waste Management and the Division of Energy,Mineral and Land Resources,Department of Environmental Quality. The method of disposal shall be consistent with the approved reclamation plan. B. Mining refuse as defined by N.C.G.S. §74-49 (14) of The Mining Act of 1971 generated on-site and directly associated with the mining activity may be disposed of in a designated refuse area. All other waste products must be disposed of in a disposal facility approved by the Division of Waste Management. No petroleum products, acids, solvents or their storage containers or any other material that may be considered hazardous shall be disposed of within the permitted area. C. For the purposes of this permit, the Division of Energy, Mineral and Land Resources considers the following materials to be "mining refuse" (in addition to those specifically listed under N.C.G.S. §74-49(14)of the N.C. Mining Act of 1971): i. on-site generated land clearing debris. ii. conveyor belts. iii. wire cables. iv. v-belts. V. steel reinforced air hoses. vi. drill steel. D. If mining refuse is to be permanently disposed within the mining permit boundary, the following information must be provided to and approved by the Division of Energy, Mineral and Land Resources prior to commencement of such disposal: i. the approximate boundaries and size of the refuse disposal area. ii. a list of refuse items to be disposed. iii. verification that a minimum of 4 feet of cover will be provided over the refuse. iv. verification that the refuse will be disposed at least 4 feet above the seasonally high-water table;and, V. verification that a permanent vegetative groundcover will be established. E. Used, clean concrete shall only be allowed on permitted quarry sites that have obtained a valid air permit and are allowed to operate crushing operations for the purposes of recycling and reuse provided that the following conditions are met: i. Appropriate quality control measures shall be taken when the used concrete arrives onsite to ensure that all such concrete processed onsite is clean, inert material. ii. Used,clean concrete shall be temporarily stockpiled and processed within existing approved affected areas draining to existing approved erosion and sedimentation control measures. Page 10 iii. No used,clean concrete material shall be permanently disposed of onsite. iv. Any foreign material that may be found within the used concrete must be separated from the concrete and properly recycled or disposed off-site.. IV. Annual Reclamation Report and Annual Operating Fee. N.C.G.S. §74-55. An Annual Reclamation Report and Annual Operating Fee of$400.00 shall be submitted to the Department by September 1 of each year until reclamation is completed and approved for release by the Department. V. Prior Approval Required for Plan Modification. N.C.G.S. §74-52. 1. Modification Notice A. The operator shall notify the Department in writing of the desire to delete, modify or otherwise change any part of the mining, reclamation, or erosion/sediment control plan contained in the approved application for a mining permit or any approved revision to it. Approval to implement such changes must be obtained from the Department prior to on- site implementation of the revisions. B. Prior to initiating any mining related activities in the Future Development Areas noted on the Mine Map received December 5, 2022, a modification shall be submitted to and approved by the Division of Energy,Mineral and Land Resources allowing said activities. VI. Bonding. N.C.G.S. &74-54. The security,which was posted pursuant to N.C.G.S. §74-54 in the form of a$1,000,000.00 blanket bond, is sufficient to cover the operation as indicated in the approved application. This security must remain in force for this permit to be valid. The total affected land shall not exceed the bonded acreage. VII. Archaeological Resources. N.C.G.S. §70-3. 1. Minimum Requirements. A. Authorized representatives of the Division of Archives and History shall be granted access to the site to determine the presence of significant archaeological resources. B. Pursuant to N.C.G.S. §70-3, "The Unmarked Human Burial and Human Skeletal Remains Protection Act,"should the operator or any person in his employ encounter human skeletal remains, immediate notification shall be provided to the county medical examiner and the chief archaeologist,North Carolina Division of Archives and History. VIII. Approved Reclamation Plan. N.C.G.S. §74-53. The Mining Permit incorporates this Reclamation Plan, the performance of which is a condition on the continuing validity of that Mining Permit. Additionally,the Reclamation Plan is a separable obligation of the permittee,which continues beyond the terms of the Mining Permit. To comply with N.C.G.S. §74-53 the approved plan will provide: Page 11 1. Minimum Standards. A. The final slopes in all excavations in soil,sand,gravel,and other unconsolidated materials shall be at such an angle as to minimize the possibility of slides and be consistent with the future use of the land. B. Provisions for safety to persons and to adjoining property must be provided in all excavations in rock. C. All overburden and spoil shall be left in a configuration which is in accordance with accepted conservation practices and which is suitable for the proposed subsequent use of the land. D. No small pools of water shall be allowed to collect or remain on the mined area that are,or are likely to become noxious,odious,or foul. E. The revegetation plan shall conform to accepted and recommended agronomic and reforestation practices as established by the North Carolina Agricultural Experiment Station and the North Carolina Forest Service. F. Permittee shall conduct reclamation activities pursuant to the Reclamation Plan herein incorporated. These activities shall be conducted according to the time schedule included in the plan,which shall to the extent feasible provide reclamation simultaneous with mining operations and in any event, provide reclamation at the earliest practicable time after completion or termination of mining on any segment of the permit area and shall be completed within two years after completion or termination of mining. 2. Reclamation Conditions. A. Provided further, and subject to the Reclamation schedule, the planned reclamation shall be to allow the quarry excavation to fill with water,provide a permanent barricade(fence) along the top of any high wall, and grade and revegetate any areas in unconsolidated material. B. The specifications for surface gradient restoration to a surface suitable for the planned future use are as follows: i. All areas of unconsolidated material such as overburden or waste piles shall be graded to a 2 horizontal to 1 vertical or flatter slope and terraced as necessary to insure slope stability. ii. Any settling ponds and sediment control basins shall be backfilled, graded, and stabilized or cleaned out and made into acceptable lake areas. iii. The processing, stockpile, and other disturbed areas neighboring the mine excavation shall be leveled and smoothed. iv. Compacted surfaces shall be disced, subsoiled, or otherwise prepared before revegetation. V. No contaminants shall be permanently disposed of at the mine site. On-site disposal of waste shall be in accordance with Operating Conditions Nos. III.12.A through III.12.D. vi. The affected land shall be graded to prevent the collection of noxious or foul water. 3. Revegetation Plan. Disturbed areas shall be permanently revegetated according to the Seeding Schedule for All Grassed Areas located on the Mine Map received December 5,2022. Page 12 Whenever possible, disturbed areas should be vegetated with native warm season grasses such as switch grass, Indian grass, bluestem, and gamma grass. In addition,the permittee shall consult with a professional wildlife biologist with the N.C. Wildlife Resources Commission to enhance post-project wildlife habitat at the site. 4. Reclamation Plan. Reclamation shall be conducted simultaneously with mining to the extent feasible. In any event, reclamation shall be initiated as soon as feasible after completion or termination of mining of any mine segment under permit. Final reclamation, including revegetation, shall be completed within two years of completion or termination of mining. IX. Issuance and Modification Summary. N.C.G.S. V4-51 and V4-52. This permit, issued October 4, 1984, modified June 12, 1989 and July 7, 1993, renewed March 3, 1995, modified May 14, 1996,December 31, 1996,April 10,2001,November 21,2001,November 26,2002 and November 4, 2003, renewed and modified September 6, 2005, and modified July 12, 2006, June 14, 2007 and July 15, 2013, and simultaneously renewed and modified November 5, 2015 is hereby modified this 26th day of January 2023 pursuant to N.C.G.S. §74-52. By: Douglas R. Ansel, Interim Director Division of Energy, Mineral,and Land Resources By Authority of the Secretary Of the Department of Environmental Quality