DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
SECTIONTHIS TO BE OUT
09-19 Project Action New
BY DEIVILR
Modification Transfer Release
Applicant Name:
Lynwood Estates, LLC
X
Applicant's Email:
kodeysingletary11@gmail.com
County:
Bladen
Project Name:
Singletary Pit
YES
NO
Date Commencing
Have land disturbing activities started??
L
X
Latitude:
35.7191
Longitude:
-78.8191
Please return comments to (at DEMLR CO):
Adam Parr
adam.parr@ncdenr.gov
Comments due by: 12/13/2022
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
El
X
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
F IX
Comments:
Per information provided by applicant, wetlands will be avoided and buffered. It is applicant's
responsibility to ensure accuracy of wetland delineation.
Does this mine (or previous owner) have DWR back fees to pay?
(If Yes, amount):
Watershed/Stream Name & Classification:
Big Swamp C; Sw
DWR Compliance Status of Mine:
401 Wetland Cert. required?
El
I 0
401 Wetland Cert. existing?
I 0
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
H-11
Central Coastal Plain Capacity Use Area (CCPCUA). Required?
Central Coastal Plain Capacity Use Area (CCPCUA). Existing?
I
I
❑
(If Yes, Permit #):
Does DWR RO have enough information to determine if a CCPCUA is required?
Is an O & M Plan needed?
Are wetlands disturbed at this site?
X
Does DWR RO suspect or know of nearby wetlands to the site?
X
Is a wetland delineation required prior to DWR issuing the permit?
X
JD
Consultant
Onsite
Offsite
Stream Determination Needed?
Stream Determination Completed?
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
Rev November 2021 r0
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Buffer Determination Needed?
Buffer Determination Completed?
Recycle system permit existing?
(If Yes, Permit #):
New Recycle System permit required?
Enough information to determine?
Non -discharge permit existing?
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
I ❑
Has Violation
O&M Requirements
❑
HQW/7Q10 Concerns
IT
-
Pay back fees or renew DWR permit
❑
Other
Please describe
the reason to
hold the permit:
RO contact:
Hold Until:
Mine must wait to dewater until an O&M plan is approved?
(-
CentralOffice Date Regional Office I Date
DWR RO Surface Water
Chad Turlington
12/19/2022