Loading...
HomeMy WebLinkAbout20221219_DWRReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: SECTIONTHIS TO BE OUT 09-19 Project Action New BY DEIVILR Modification Transfer Release Applicant Name: Lynwood Estates, LLC X Applicant's Email: kodeysingletary11@gmail.com County: Bladen Project Name: Singletary Pit YES NO Date Commencing Have land disturbing activities started?? L X Latitude: 35.7191 Longitude: -78.8191 Please return comments to (at DEMLR CO): Adam Parr adam.parr@ncdenr.gov Comments due by: 12/13/2022 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? El X Is the RO concerned that the operation, as proposed, would violate standards of water quality? F IX Comments: Per information provided by applicant, wetlands will be avoided and buffered. It is applicant's responsibility to ensure accuracy of wetland delineation. Does this mine (or previous owner) have DWR back fees to pay? (If Yes, amount): Watershed/Stream Name & Classification: Big Swamp C; Sw DWR Compliance Status of Mine: 401 Wetland Cert. required? El I 0 401 Wetland Cert. existing? I 0 (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? H-11 Central Coastal Plain Capacity Use Area (CCPCUA). Required? Central Coastal Plain Capacity Use Area (CCPCUA). Existing? I I ❑ (If Yes, Permit #): Does DWR RO have enough information to determine if a CCPCUA is required? Is an O & M Plan needed? Are wetlands disturbed at this site? X Does DWR RO suspect or know of nearby wetlands to the site? X Is a wetland delineation required prior to DWR issuing the permit? X JD Consultant Onsite Offsite Stream Determination Needed? Stream Determination Completed? Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? Rev November 2021 r0 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Buffer Determination Needed? Buffer Determination Completed? Recycle system permit existing? (If Yes, Permit #): New Recycle System permit required? Enough information to determine? Non -discharge permit existing? (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑ I ❑ Has Violation O&M Requirements ❑ HQW/7Q10 Concerns IT - Pay back fees or renew DWR permit ❑ Other Please describe the reason to hold the permit: RO contact: Hold Until: Mine must wait to dewater until an O&M plan is approved? (- CentralOffice Date Regional Office I Date DWR RO Surface Water Chad Turlington 12/19/2022 RO Aquifer Protection Section Rev November 2021 r0