Loading...
HomeMy WebLinkAbout20221219_Mine_MapsA',10- 51 n i M�V0 9"yAV ti TOVrµDSrone t Ar 0I 4a �e°sea�ruc�`On pTeO5 s G°os o wood 11.21 Acres Addition to Permit ® \° a e 4cd. + o c c c` xr o \ ♦ �\/� 1 _ Ire sm Aso Q� O �M a%v r1 �, Road Ar- Added to include - \ \ 11, lM - �? <, _ / ( a G° Addition to Permit r- 50IN Po This pw- r er _ r <Ine with ��s`r'�hJ - \ . ��O 011, ~ ing 10 be 2g Wider h rower N\ S \ ..��,� 4 a I Remove -O e` EO es me V ti �1 Q �< j d ^ o 3' Tax ID 5938-00-18-4556 Luck Stone Corporation 1 D \$`A� •�� Plant #2 Area EP ofPofoi(o I w/ Stockpiles lP Tox \DStone G 13.2 Acres Yo rya0 m®y O 0 4�Fearfoe SKIMMER No - -O -01 Fill CATCH � Fill BASIN -0Fill c er,d� \ ` Previously I �PTaH -O Fill _ ( I euArPermitted � Overburden Storage Area Q - 3220 Aa 1 - :, WOOa100, i p 9 . C'C/ \_ Offer BASIN 003 h !N Woods \ < ed b 5 l m �XSt\r9 NEW TOTAL PERMIT P eC� afy 606.18 Acres you n � a \ C3 �P28 wine E a ® oKer Li ` :�Spmeht 1,� ne w h Po wen f tines ,oO W iae �4\ TO W pc�s be Se Removed Ar mend The specific future use of this addition to the permitted area has not been determined. ba„ Proposed New Permit 0 Boundary hQ �s * ac do ° 0 -O 35"03 19 5g3a-o NenTv No \m o� spPd�o � t\o\\m 5g22 _ Z ttastee 905"' w 00-1 to o 5 o � tirm, / g ° / c 1g-f 919 y O 0 o r I Tox ID 5938-DO Henry r I Griffith, Mlchoel .l \ 960.4 EL 100 yc. Flood 3.c n 1�3 'ol° `- r.o1P z soo I00 Comments N 52 Mount w E Airy 74 s Pm o° as cAs Q�. Exit o, 0 i 601 , °<° Jx /I � 00Q shy 5� z Exit Vicinity Map No Scale Legend Adjacent Property Lines Existing Roads Contour Lines 3600 Existing Permit Boundary Proposed Permit Area Affected/Disturbed Boundary Existing Pit Boundary Water Edge/Stream - PQwer LIIre'Lrcis'L"1Treat~ Overhead Electric Lines Edge of Woods/Vegetation Line Towers Power/Utility Poles Body of Water 100 yr Flood Plain NOTES: 1. The contours within this map were completed under the direct and responsible charge of Robert H. Tuck from an actual Airborne survey made under my supervision; that the imagery and/or original data was obtained on 06-28-21; and that this map, including metadata, meets minimum accuracy standards unless otherwise noted. 2. This map was prepared as an inventory of facilities of the existing mine under Permit #86-01. Property boundary information is not shown as it extends well outside of formal permit area for majority of permit map. 3. The 100 year Flood Plain Information shown hereon is from information found on the North Carolina Flood Risk Information System, more specifically FEMA Flood Maps #3710593900J PANEL 5939, #3710592800J PANEL 5928, #3710593800J PANEL 5938, all with an effective date of 8/18/2009. 4. The power -line easement agreement is recorded in DB 100 PG 552 and extends 34' from the center of each line of towers, Duke Power Company shall have access to all structures at all times according to the agreement. 5. All proposed new permit boundaries to the east of the existing permit boundary run adjacent to the Ararat River. Limits of Disturbance shall, at a minimum, be 100' offset from the permit boundary or follow the boundary of the 100 year flood plain as referenced in Note #4. At no point shall disturbance be within 100' of the Ararat River. ACREAGE TABLE Category Permit 86-01 Revision Updated Total Tailings/Sediment Ponds 15.2 Ac. +0.00 Ac. 15.20 Ac. Stockpiles 18.6 Ac. +0.00 Ac. 18.60 Ac. Wastepiles(Overburden) 28.8 Ac. +3.40 Ac. 32.20 Ac. Plant Area/Roads 38.4 Ac. +12.37 Ac. 50.77 Ac. Mine Excavation/Pit 93.2 Ac. +63.52 Ac. 1 156.72 Ac. Other 146.95 Ac. -64.49 Ac. 82.46 Ac. Total Affected / Disturbed 341.15 Ac. +14.80 Ac. 355.95 Ac. Property Permitted 367.15 Ac. +239.03 Ac. 606.18 Ac. 0 150 300 600 900 1200 GRAPHIC SCALE IN FEET 1 INCH = 300 FT LUCK31STONE. SCALE: 1 " = 300' DATE: 1') P) r1mor1 RICHMOND, 'ARGINIA MOUNT AIRY QUARRI�_1x''4' DEC 19 2022 MINE PERMIT M A P,ARD QUALITY SECTION BY MP 'opo Date: IIIAIF 'JmrJ1 F-,Ie Nome PERMITMAP2-MtAIRY 22-1115.dwg „. 0 yu I All tanks will be be properly closed and removed from site - All plant and shay building will be demolished unless on alternative post y mining land use (7 retains structures. �o � 06 I a 2� 8C1, p� 1 V4 � vv 411tVv. C i^ fiOLll ` l Hdv a r p 1'l i Air �qp� c5T S� A CATCH 0 I I \ A3r sheep a'nt n®ad -- All plant ponds will be filled and \ stabilized depending on -O"-ultimate post -. mining land use. 80' 89, Ac it 1 O AR {rp- a � y All stockpiles, _�}ructures and W equipment will be removed. -ACV Ah"� �iY I 93�p8 gym. o I \ Att stockpiles, }ruc}ures and equipment will be. removed Basin's will either area filled and Riser strucl will be ren Final, b �'will a be fence and allowed to fill with water. The ultimate - lake location may vary. y wer \ - Clhe to be \ a -O' I Perimeter 6' fence to be installed at end of mine life. Fence will have warning signage every 200, y "s ♦, 44 I � as '` ..:�► {+r 3 w' 411, 411, y,Pts �'3 r e The addiiwl, this area will ultimately be us' for pit 4 + development. i The specific future use of this Aor addition to the permitted area has 1 ' not been determined.or j - 1 r+• i �.yl �� i+♦ 1, �-11'�-iF �i-I-E I.+a 1 si,t r-��-� � �. I L� Al*,MR I — —' � �♦.I:� �1E-ti-�rt� ifii��y.,.�l+� '�I��-��Ty l_�i� � � �i-r:Al.a �,1�"`�� /; NOTES: 1. The areas surrounding the pit will be stabilized by grading and appropriate seeding and planting of trees, shrubs and grasses. A combination of approved native and non—native species will used as to promote growth. Seeding will be approved prior to placement. 2. the pit will naturally fill with both ground and storm water. Appropriate barricades, gates and fences will be installed to limit access to potential remaining hazards both associated with the pit and surrounding areas. 3. All structures associated with the plants at the site will be removed from the site. This includes all plant equipment, plant buildings, stockpiles and headwalls. All tunnels w,i)J be sealed o,r Inerniomed. 4. Basins, ponds and other water bodies not associated with the pit will be either breached or filled in with inert soils. Unless otherwise approved by NCDEQ, no bodies of water outside of the remaining pit lake will remain on site. 5. Post mining land use may change over the course of mining due to conditions outside of the control of Luck Stone. Such changes may affect reclamation procedures. Any change will first be submitted to NCDEQ prior to commencement. RECEIVE® DEC 19 2022 LAND QUALITY SECTION LUCK31STONE. RICHMOND, VIRGINIA MOUNT AIRY QUARRY RECLAMATION MAP SCALE: DRAWN BY: File Name 1” = 300' BMP DATE Photo/Topo Date: PERM ITMAP2_MtAIRY 22-1115.dw Comments 12/2/2022 JUNE 2021 9