HomeMy WebLinkAbout20221025_ADI_ReceivedHood Richardson, PA C-576
110 West Second Street
Washington, N. C. 27889
252-975-3472
October 3 18, 2022
Mr. Adam Par, PE
Assistant State Mining Engineer
Division or Energy, Minerals. and Land Resources
Department of Environmental Quality
1612 Mail Service Center
Raleigh, NC 27699-1612
RE: Cutler Mine Permit Application
Beaufort County
Tar -Pamlico River Basin
Dear Mr. Pan:
RECEIVED
OCT 25 2022
K.A
I am enclosing three copies of Sheets 1 thru 3 Revised October 17, 2022 of the permit application
map and three copies of Page 14 of the application (Determination of Affected Acreage and
Bond).
These revisions are based on a meeting with Robert Tankard (Water Quality from the Washington
Regional office) and he owner. The owner agreed to designate a part of the permitted area as
wetlands not to be mined.
Sincerely yours,
H od L. Richardson, PE, PLS
NORTH CAROLINA MINING State of North Camlin 1612 tip Service Cender
PMMI T APPLICATION Depa0tent of Environmental Gu" Raleigh, NC 27699.1612
Dms m of Energy. Mineral, and Land Resources (919) 707-M
E. DETS=mATtON OF AFFECTED ACREAGE AND BOND
The f+a o t Goad ca(cufatbn worbIleg is to be used to establish an appmpda#e &W Mawd Q= a mt p of SM to S500
per affected acre) kr each pemgfted n*w -sb based upon the acreage app+rxred by the DeperWW to he Weded & trg the
fife of the mining permit Pleasein;n inse the a�antoxirr arroage for each ash fhe mirtsttt �; �yau i d to at%ci
for you based upon ME ME and standard redamahm costs:
CATEGORY AFFECTED
• , RECLAMATION
RECLAMATION
,. ACREAGE
COSTIACRE
COST
TeflingsiSeftent Ponds /ge7N,& Ac.
X $ /Ac.
= $ 0.00
140 At
' Stocloes No IlF Ac.
X $ lAc.
= $ 0.00
fro hOC
waste PMles N Ac.
X $ fAc.
= $ 0.00
I 0 We
ee�Ftaal Roads 6 ,�r Ac.
X $ [ % pt) /Ac-
_ 0.00
g'UC7
Mme Excavation q0
Omer I-jV tj Steyr. r,*a- l.r (o
TOTAL AFFECTED AC: 0.00
TOTAL PERMITTED AC.:
3 Ac. X $ ,,-Z)y /Ac. = $ 0.00 2,24
3 Ac. X $ Zv 00
Ac.
Ac.
IAc. = $ 0.00 3 2 b o
* C, Vz-<r00
TemjwW & Pemaneft Sedimectgon & Erosion Contra! Measures:
Divide he TOTAL AFFECTED AC. above into the foHowing two categories: a) affected acres that drain into sedlex g
excavadcm andfor b) affected acres that will be graded for pose drainage where measures wN be needed m went offsite
sedimentation and sedimentation to onsiie watercourses and wetlands.
a) Internal Drainage
b) Positive Drainage
SUBTOTAL COST: $ 0.00
Ac.
x $1.5W-00 = $ 0.00 ` Hd "i�
Enfladon Factor:
SUBTOTAL COST LIFE OF NMG OPERATION OR LIFE INFLATION COST
OF LEASE (YEARS} -�V ,
0.02X$0.00 X �� =$0.00 3����
��
Total Redmadon Bond Cost:
TOTAL RECLAMATION BOND COST = SUBTOTAL + INFLATION
.00 6 do, d�
Round dawn to the nearest $100.00
NOTE: The reclamation bond cannot exceed $1 million per GS 74-54
-2,p - X 21--
A�a V I'J to 11-51
#14