Loading...
HomeMy WebLinkAbout20221025_ADI_ReceivedHood Richardson, PA C-576 110 West Second Street Washington, N. C. 27889 252-975-3472 October 3 18, 2022 Mr. Adam Par, PE Assistant State Mining Engineer Division or Energy, Minerals. and Land Resources Department of Environmental Quality 1612 Mail Service Center Raleigh, NC 27699-1612 RE: Cutler Mine Permit Application Beaufort County Tar -Pamlico River Basin Dear Mr. Pan: RECEIVED OCT 25 2022 K.A I am enclosing three copies of Sheets 1 thru 3 Revised October 17, 2022 of the permit application map and three copies of Page 14 of the application (Determination of Affected Acreage and Bond). These revisions are based on a meeting with Robert Tankard (Water Quality from the Washington Regional office) and he owner. The owner agreed to designate a part of the permitted area as wetlands not to be mined. Sincerely yours, H od L. Richardson, PE, PLS NORTH CAROLINA MINING State of North Camlin 1612 tip Service Cender PMMI T APPLICATION Depa0tent of Environmental Gu" Raleigh, NC 27699.1612 Dms m of Energy. Mineral, and Land Resources (919) 707-M E. DETS=mATtON OF AFFECTED ACREAGE AND BOND The f+a o t Goad ca(cufatbn worbIleg is to be used to establish an appmpda#e &W Mawd Q= a mt p of SM to S500 per affected acre) kr each pemgfted n*w -sb based upon the acreage app+rxred by the DeperWW to he Weded & trg the fife of the mining permit Pleasein;n inse the a�antoxirr arroage for each ash fhe mirtsttt �; �yau i d to at%ci for you based upon ME ME and standard redamahm costs: CATEGORY AFFECTED • , RECLAMATION RECLAMATION ,. ACREAGE COSTIACRE COST TeflingsiSeftent Ponds /ge7N,& Ac. X $ /Ac. = $ 0.00 140 At ' Stocloes No IlF Ac. X $ lAc. = $ 0.00 fro hOC waste PMles N Ac. X $ fAc. = $ 0.00 I 0 We ee�Ftaal Roads 6 ,�r Ac. X $ [ % pt) /Ac- _ 0.00 g'UC7 Mme Excavation q0 Omer I-jV tj Steyr. r,*a- l.r (o TOTAL AFFECTED AC: 0.00 TOTAL PERMITTED AC.: 3 Ac. X $ ,,-Z)y /Ac. = $ 0.00 2,24 3 Ac. X $ Zv 00 Ac. Ac. IAc. = $ 0.00 3 2 b o * C, Vz-<r00 TemjwW & Pemaneft Sedimectgon & Erosion Contra! Measures: Divide he TOTAL AFFECTED AC. above into the foHowing two categories: a) affected acres that drain into sedlex g excavadcm andfor b) affected acres that will be graded for pose drainage where measures wN be needed m went offsite sedimentation and sedimentation to onsiie watercourses and wetlands. a) Internal Drainage b) Positive Drainage SUBTOTAL COST: $ 0.00 Ac. x $1.5W-00 = $ 0.00 ` Hd "i� Enfladon Factor: SUBTOTAL COST LIFE OF NMG OPERATION OR LIFE INFLATION COST OF LEASE (YEARS} -�V , 0.02X$0.00 X �� =$0.00 3���� �� Total Redmadon Bond Cost: TOTAL RECLAMATION BOND COST = SUBTOTAL + INFLATION .00 6 do, d� Round dawn to the nearest $100.00 NOTE: The reclamation bond cannot exceed $1 million per GS 74-54 -2,p - X 21-- A�a V I'J to 11-51 #14