July 23, 2019
Certified Mail
Return Receipt Requested
70162140 0000 05651237
Mr. Harvey Lee Tripp
Ottway Sand Mine Inc.
108 Partridge Drive
New Bern, North Carolina 28562
Re: Ottway Sand Mine
Mining Permit No.16-44
Carteret County
White Oak River Basin
Dear Mr. Tripp:
The review has been completed on the modification request you submitted for the
referenced mine site. In order for this office to complete its review of the referenced project in
accordance with GS 74-50 and 51 of the Mining Act of 1971, please provide the following:
The reclamation bond was calculated for this site using the information with the
application request. The reclamation bond for this site has been calculated to be $35,700.00.
The calculation worksheet is enclosed for your review and the bond or balance ($9,300.00) will
be required prior to approval of this modification.
For your convenience, I have enclosed a bond form, an assignment of a savings
account form and irrevocable standby letter of credit form for your use in securing the required
bond. The name on the security must be the same as the name appearing on the application
for a mining permit, i.e., Ottway Sand Mine Inc. In addition to one of these alternatives, you
may, upon request, substitute a cash deposit.
Please be advised that the modification request cannot be completed until the new bond
amount has been received.
As required by G.S. 74-51 (h), you are hereby advised that you have 60 days from the
date of your receipt of this letter to submit the reclamation bond. If you are unable to meet this
deadline and wish to request additional time, you must submit information, in writing, to the
Director clearly indicating why the deadline cannot be met and request that an extension of
time be granted.
D E Q North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
512 North Salisbury Street 11612 Mail Service Center I Raleigh,North Carolina 2 769 9-1612
nonm cuaimw
°� ^� 919.707.9200
CERTIFIED MAIL
Mr. Ottway
Page Two
In order to complete the processing of your modification request, please forward the
bond to my attention at the following address:
Division of Land Resources
Department of Environmental Quality
1612 Mail Service Center
Raleigh, NC 27699-1612
Please contact me at (919) 707-9220 if you have any questions.
Sincerely, X��
Judith A. Wehner
Assistant State Mining Specialist
Enclosures: Bond Forms
Bond Calculation Worksheet
cc: Mr. Dan Sams, PE
APPLICATION FOR A MINING PERMIT
E. DETERMINATION OF AFFECTED ACREAGE AND BOND
The following bond calculation worksheet is to be used to establish an appropriate bond(based upoVa range
of$500 to $5,000 per affected acre)for each permitted mine site based upon the acreage approved by the
Department to be affected during the life of the miningpermit. Please insert the approximate acreage or each
aspect o the mining operation, that volt intend to affect dicrin the he life o this mining permit(in addition.please
insert the appropriate reclamation cost/acre for each cate ory from the Schedule of Reclamation Costs
provided with this applicationfform) OR you can defer to the Department to calcadate ' ztr bond for volt based
atpon our maps and standard reclamation costs:
AFFECTED RECLAMATION RECLAMATION
CATEGORY ACREAGE COST/ACRE* COST
Tailings/Sediment Ponds: Ac. X $ 60 b(b /Ac. _ $ b dt)
Stockpiles: Ac. X $ O /Ac. — $
3 0,0
t2d
Wastepiles: a f. 0,V Ac. X $ ����� /Ac. _ $
Processing Area/Haul Roads: ,9 9 Ac. X $ P5 /Ac. _ $
Mine Excavation: y-(?L57Ac. X $ "boo /Ac. _ $ oyaj—
Other: L Mkj, 4flu
Ac. X $ 03 ob/Ac. _ $ V�?
TOTAL AFFECTED AC.: Ac.
(TOTAL PERMITTED AC.: 51 7b Ac.)
Temporary&Permanent Sedimentation &Erosion Control Measures:
Divide the TOTAL AFFECTED AC. above into the following two categories: a)affected acres that drain into
proposed/existing excavation and/or b)affected acres that will be graded for positive drainage where measures will
be needed to prevent offsite sedimentation and sedimentation to onsite watercourses and wetlands.
a) Internal Drainage Ac.
b) Positive Drainage Ac. X $1,500.00 = $
SUBTOTAL COST: $ au
Factor:
Da
0.02 X SUBTOTAL COST: $ Al) X Permit LifWrovided by Applicant(Life of the Mining Operation
or Life of Lease from Public Entity(in Years)): 4A 67
INFLATION COST:
SUBTOTAL COST+INFLATION COST:
Total Reclamation Bond Cost:
(round down to the nearest$100.00)
(NOTE: The reclamation bond cannot exceed $1 million per GS 74-54)