HomeMy WebLinkAbout20221107_2-ESC_Calcs Attachment 2
Stormwater and Erosion Control Calculations
> v n w p = r
(p • 6 \
- i
dir
7f
r
E
;f
IN
. .-
� t
a u s • to
6
q I �
STEEL GRAY MINE �e N 7 ota2leto 3
FORF , =� 91
W BLUE RIDGE QUARRIES,INC,
LANDCRAFT ENGINEERING PLLC
urtc t couNTv NORTH CaR0l1NA FM WENSE Na P-0740 ��®
Project No: otdwinq Title: 31 CROSS STREETSLHI
a
000 DETAILS SPRUCE PMNBC 211M
rI s I n I v I ,+ I w I a I x I
g w r c s a• r
Steel Gray Mine
Sediment Trap
Trap/ Surface Storage Spillway
Skimmer Size Drainage Area Area Volume length
T-1 16'X60'X4 0.6 acres 960ft2 3840ft3 4.0'
T-IA 10'X33'X4' 0.12 acres 330ft2 1320ft' 4.0'
T-2 20'x110'x4' 1.87 acres 2200ft2 8800ft3 6.0'
T-3 26'x100'x3' 2.12 acres 2600ft2 10400ft3 6.0'
T-4 36'x125'x4' 3.5 acres 4500ft' 18000w 10.0'
T-5 36'x99'x4' 1.95 acres 3564ft2 14256ft3 9.54
Runoff Calculations for Trap T-1
Description Acres C-Value Coef.
Bare Sandy Soil level 0 0.5 0
Bare Soil (sloping) 0.6 0.5 0.3
Grassland & disturbed Areas 0 0.5 0
Woodlands 0 0.3 0
Roadway ravel 0 0.65 0
Totals 0.6 0.3
C = 0.3 (coef) / 0.6 (acres) = 0.5
i = Rainfall Intensity for 10 year, 1 day storm = 7.06 inches
Q = (C)(i)(A) = 0.5 X 7.06 X 0.6 = 2.118 cfs
i = Rainfall Intensity for 2 year, 1 day storm = 5.21 inches
Q = (C)(i)(A) = 0.5 X 5.21 X 0.6 = 1.563 cfs
i = Rainfall Intensity for 25 year, 1 day storm = 8.09 inches
Q = (C)(i)(A) = 0.5 X 8.09 X 0.6 = 2.427 cfs
Sediment Trap Trap T=1
Trapping Effeciency
Drainage Area Acres 0.6
A = 0.01 X (0) 1 2.118 = 0.0212 X 43560 _ 922.6 ft2 Required
Basin Size 16'X60'X4'(minimum)
Ft2 Surface area 980
Ft3 Storage area 3840
Trap to be deaned at the plont where the basin no longer functions well or Is at 60%capadty.
Runoff Calculations for Trap T-1A
Description Acres C-Value Coef.
Bare Sandy Soil level 0 0.5 0
Bare Soil (sloping) 0.21 0.5 0.105
Grassland & disturbed Areas 0 0.5 0
Woodlands 0 0.3 0
Roadway ravel 0 0.65 0
Totals 0.21 0.105
C = 0.105 (coef) / 0.21 (acres) = 0.5
i = Rainfall Intensity for 10 year, 1 day storm = 7.06 inches
Q = (C)(i)(A) = 0.5 X 7.06 X 0.21 = 0.7413 cfs
i = Rainfall Intensity for 2 year, 1 day storm = 5.21 inches
Q = (C)(i)(A) = 0.5 X 5.21 X 0.21 = 0.54705 cfs
i = Rainfall Intensity for 25 year, 1 day storm = 8.09 inches
Q = (C)(i)(A) = 0.5 X 8.09 X 0.21 = 0.84945 cfs
Sediment Trap Trap T-1A
Trapping Effeciency
Drainage Area Acres 0.21
A = 0.01 X (0) 0.74 = 0.0074 X 43560 322.3 W Required
Basin Size I VX3TXW(minimum)
Ft2 Surface area 330
Ft3 Storage area 1320
Trap to be cleaned at the plant where the basin no longer funclions well or Is at 50%capacity.
Runoff Calculations for Trap T-2
Description Acres C-Value Coef.
Bare Sandy Soil level 0 0.5 0
Bare Soil (sloping) 0.75 0.5 0.375
Grassland & disturbed Areas 0 0.5 0
Woodlands 1.12 0.3 0.336
Roadway ravel 0 0.65 0
Totals 1.87 0.711
C = 0.711 (coef) / 1.87 (acres) = 0.3802139
i = Rainfall Intensity for 10 year, 1 day storm = 7.06 inches
Q = (C)(i)(A) = 0.38021 X 7.06 X 1.87 = 5.01966 cfs
i = Rainfall Intensity for 2 year, 1 day storm = 5.21 inches
Q = (C)(i)(A) = 0.38021 X 5.21 X 1.87 = 3.70431 cfs
i = Rainfall Intensity for 25 year, 1 day storm = 8.09 inches
Q = (C)(i)(A) = 0.38021 X 8.09 X 1.87 = 5.75199 cfs
\41W
Sediment Trap Trap T 2
Trapping Effeciency
Drainage Area Acres 1.87
A = 0.01 X (0) 5.02 = 0.0502 X 43560 - 2186.7 ft2 Required
Bann Size 2VX11VXC(minimum)
Ft2 Surface area 2200
FM Storage area 8800
Trap to be cleaned at the plont where the basin no longer functions wetl or is at 60%capacity.
Runoff Calculations for Culvert C-1
Description Acres C-Value Coef.
Bare Sandy Soil level 0 0.5 0
Bare Soil (sloping) 0.85 0.7 0.595
Grassland & disturbed Areas 0 0.5 0
Woodlands 1.12 0.3 0.336
Roadway ravel 0 0.65 0
Totals 1.97 0.931
C = 0.931 (coef) / 1.97 (acres) = 0.4725888
i = Rainfall Intensity for 10 year, 1 day storm = 7.06 inches
Q = (C)(i)(A) = 0.47259 X 7.06 X 1.97 = 6.57286 cfs
i = Rainfall Intensity for 2 year, 1 day storm = 5.21 inches
Q = (C)(i)(A) = 0.47259 X 5.21 X 1.97 = 4.85051 cfs
i = Rainfall Intensity for 25 year, 1 day storm = 8.09 inches
Q = (C)(i)(A) = 0.47259 X 8.09 X 1.97 = 7.53179 cfs
kqoV
Project Description
Worksheet Circular Channel-C-1
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.010
Slope 0.010000 ftfft
Diameter 15 in
Discharge 7.53 cfs
Results
Depth 0.92 ft
Flow Area 1.0 ft2
Wetted Perimeter 2.59 ft
Top Width 1.10 ft
Critical Depth 1.09 ft
Percent Full 73.9 %
Critical Slope 0.007304 ft/ft
Velocity 7.74 ftfs
Velocity Head 0.93 ft
Specific Energy 1.86 ft
Froude Number 1.45
Maximum Discharge 9.03 cfs
Discharge Full 8.40 cfs
Slope Full 0.008041 ft/ft
Flow Type Supercritical
1
I
15in
0.9I It I
VAL
H:1
NTS
Runoff Calculations for Ditch DB-2
Description Acres C-Value Coef.
Bare Sandy Soil level 0 0.5 0
Bare Soil (sloping) 0.6 0.7 0.42
Grassland & disturbed Areas 0 0.5 0
Woodlands 0 0.3 0
Roadway ravel 0 0.65 0
Totals 0.6 0.42
C = 0.42 (coef) / 0.6 (acres) = 0.7
i = Rainfall Intensity for 10 year, 1 day storm = 7.06 inches
Q = (C)(i)(A) = 0.7 X 7.06 X 0.6 = 2.9652 cfs
i = Rainfall Intensity for 2 year, 1 day storm = 5.21 inches
Q = (C)(i)(A) = 0.7 X 5.21 X 0.6 = 2.1882 cfs
i = Rainfall Intensity for 25 year, 1 day storm = 8.09 inches
Q = (C)(i)(A) = 0.7 X 8.09 X 0.6 = 3.3978 cfs
Protect Description
Worksheet Trapezoidal Channel-DB-2
Flow Element Trapezoidal Channel
Method Manninds Formula
Solve For Channel Depth
Input Data
Mannings 0.104
Coefficient
Slope 0.020000 ft1ft
Left Side Slope 2.00 V:H
Right Side Slope 2.00 V:H
Bottom who 2.00 ft
Discharge 3.39 cfs
Results
Depth 0.97 ft
Flow Area 2.4 IP
Wetted Perimeter 4.17 ft
Top Width 2.97 ft
Critical Depth 0.43 ft
Critical Slope 0.280312 ft/ft
Velocity 1.40 ftfs
Velocity Head 0.03 ft
Specific Energy 1.00 ft
Froude Number 0.27
Flow Type Subcritical
Determine sheer stress:T 62.4X 0.97 X 0.02 a 1.21 ibIW Permissible Sheer Stress 4.0 IbffN Rip Rap Lining OK
0.97 rs
---------2.00 tt -----------�
V:1
H2.0
NTS
Runoff Calculations for Ditch DB-2A
Description Acres C-Value Coef.
Bare Sandy Soil level 0 0.5 0
Bare Soil (sloping) 0.24 0.7 0.168
Grassland & disturbed Areas 0 0.5 0
Woodlands 0 0.3 0
Roadway ravel 0 0.65 0
Totals 0.24 0.168
C = 0.168 (coef) / 0.24 (acres) = 0.7
i = Rainfall Intensity for 10 year, 1 day storm = 7.06 inches
Q = (C)(i)(A) = 0.7 X 7.06 X 0.24 = 1.18608 cfs
i = Rainfall Intensity for 2 year, 1 day storm = 5.21 inches
Q = (C)(i)(A) = 0.7 X 5.21 X 0.24 = 0.87528 cfs
i = Rainfall Intensity for 25 year, 1 day storm = 8.09 inches
Q = (C)(i)(A) = 0.7 X 8.09 X 0.24 = 1.35912 cfs
\w� \�
Protect Description
Worksheet Trapezoidal Channel-DB-2A
Flow Element Trapezoidal Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.104
Slope 0.020000 tuft
Left Side Slope 2.00 V:H
Right Side Slope 2.00 V:H
Bottom Width 2.00 ft
Discharge 1.36 cfs
Results
Depth 0.55 ft
Flow Area 1.3 ft2
Wetted Perimeter 3.24 ft
Top Width 2.65 ft
Critical Depth 0.24 R
Critical Slope 0.305306 ft/ft
Velocity 1.08 ft/s
Velocity Head 0.02 ft
Specific Energy 0.57 ft
Froude Number 0.27
Flow Type Subcritical
Determine sheer stress: To 62.4X 0.66 X 0.02 0 0.691bKO Pemlissible Sheer Stress 4.0 We Rip Rap Lining OK
' f
0.55[l
.._i_
VA
H2.0
NT8