Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
Figure 01_USGS Topo Map
Figure 02_NCDOT Highway Map
Figure 03_Project KMM and TSF Location Map
Figure 04_Permitted Areas Map
Figure 05_Aerial Map
Figure 06_Topographic Map
Figure 07_Legacy Mining Facilities Map
Figure 08_Surface Water Features Map
Figure 09_Wetlands Determination Overview Map
Figure 14_Flood Map
Figure 15_Monitoring Well_Map
Figure 16_Soils Map
Figure 17_NRHP Listed or Eligible Site Map
Figure 18_Geology Map
Figure 19_Pit Geotechnical Borings Map
Figure 20_Existing Conditions - LOM Ph 0
Figure 21_Mine Layout Series Overview Map
Figure 22_Proposed Pit Map and Cross-Sections
Figure 23_Map and Cross-Section Showing the Pit Geotechnical Domains and Sectors
Figure 24_Easement Map
Figure 25_KMM Site Layout and Property Buffers
Figure 26_KM Mine Site Layout with Acreage Table
Figure 27_End of Construction - LOM Ph 1
Figure 28_Interim Operations - LOM Ph 2
Figure 29_End of Operations - LOM Ph 3
Figure 30_End of Reclamation - LOM Ph 4
Figure 36-A KMM_SWMP_Addendum2.1 with Outfalls
Figure 36-B SiteWideOverallStormwaterPlanOperations with Outfalls
Figure 37_Surface Water Management_SHEET 1
Figure 38_Surface Water Management_SHEET 2
Figure 39_Surface Water Management_SHEET 3
Figure 40_Surface Water Management_SHEET 4
Figure 41 Phase 1 Construction Stormwater Plan
Figure 42 Phase 2 Construction Stormwater Plan
Figure 43_KMM Water Balance Flowsheet rev 2024-09-14
Figure 44_Water Balance Model for Const_SRK Landscape
Figure 45_Water Balance Model for Closure_from Appendix K_Rev02_20240412
Figure 46_NCG02 Outfall Location Map
Figure 47_Public Lands and Recreation Map
Figure 48_Closest Occupied Structure to Pit Map
Figure 49_Fuel and Solvent Storage Location Map
Figure 50_Adjoining Parcels Overview Map
Figures 10 thru 13_Wetlands Determination Map Series
Figures 31 thru 35_Mine Layout Map Series
Figures 51-56_The Adjoining Parcel Map Series (6 Maps)