Loading...
HomeSearchMy WebLinkAboutFigure 01_USGS Topo MapFigure 02_NCDOT Highway MapFigure 03_Project KMM and TSF Location MapFigure 04_Permitted Areas MapFigure 05_Aerial MapFigure 06_Topographic MapFigure 07_Legacy Mining Facilities MapFigure 08_Surface Water Features MapFigure 09_Wetlands Determination Overview MapFigure 14_Flood MapFigure 15_Monitoring Well_MapFigure 16_Soils MapFigure 17_NRHP Listed or Eligible Site MapFigure 18_Geology MapFigure 19_Pit Geotechnical Borings MapFigure 20_Existing Conditions - LOM Ph 0Figure 21_Mine Layout Series Overview MapFigure 22_Proposed Pit Map and Cross-SectionsFigure 23_Map and Cross-Section Showing the Pit Geotechnical Domains and SectorsFigure 24_Easement MapFigure 25_KMM Site Layout and Property BuffersFigure 26_KM Mine Site Layout with Acreage TableFigure 27_End of Construction - LOM Ph 1Figure 28_Interim Operations - LOM Ph 2Figure 29_End of Operations - LOM Ph 3Figure 30_End of Reclamation - LOM Ph 4Figure 36-A KMM_SWMP_Addendum2.1 with OutfallsFigure 36-B SiteWideOverallStormwaterPlanOperations with OutfallsFigure 37_Surface Water Management_SHEET 1Figure 38_Surface Water Management_SHEET 2Figure 39_Surface Water Management_SHEET 3Figure 40_Surface Water Management_SHEET 4Figure 41 Phase 1 Construction Stormwater PlanFigure 42 Phase 2 Construction Stormwater PlanFigure 43_KMM Water Balance Flowsheet rev 2024-09-14Figure 44_Water Balance Model for Const_SRK LandscapeFigure 45_Water Balance Model for Closure_from Appendix K_Rev02_20240412Figure 46_NCG02 Outfall Location MapFigure 47_Public Lands and Recreation MapFigure 48_Closest Occupied Structure to Pit MapFigure 49_Fuel and Solvent Storage Location MapFigure 50_Adjoining Parcels Overview MapFigures 10 thru 13_Wetlands Determination Map SeriesFigures 31 thru 35_Mine Layout Map SeriesFigures 51-56_The Adjoining Parcel Map Series (6 Maps)