HomeMy WebLinkAbout77463_William Flockhart_20201201 .Tzjc
7CAMA / DREDGE & FILL _-A 03 c- N° 77463 A B C D
G E N E_ RAL PERMIT Previous permit#
)�—= ❑New Modification ❑Complete Reissue El Partial Reissue Date previous permit issued , -
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC
/ Rules attached.
Applicant Name �J�//ta/a /� /l a i Project Location: County 1. 4_
Address rC 7 i:)) /*c ,, P ci Street Address/State Road/Lot#(s) /2/ j`A,0-, r (/.ew
City/ /,'- 6-. ^ State NC ZIP Z ) r6 2--
Phone# (?-;) ) ' 20 .7.;7 E-Mail Subdivision 14 // X-"A /4'4'1))---'
Authorized Agent 1Ls%// �,�p City '' ZIP 2. 5 6 2"
Affected ❑CW ❑EW p'VTA ❑ES $PTS Phone# (24-1 ) 7o 2--7'/ River Basin Ne'S-12-`
O ❑OEA ❑HHF ❑IH ❑USA ❑WA i ' 'C e -, �'1 & (nat /�/unkn)
AEC s : Adj.Wtr. Bodyf -- � 3
❑ PWS: -rU -I- v�
ORW: yes / no PNA yes / no Closest Maj.Wtr. Body
Type of Project/Activity )rb /' 7, /lc A, , l' '°r '/
d �: (Scale: • 3 v
Pier(dock)len
Fixed Platform(s) 5`'Y? O' Ilj \ i I iI I
Floating Platform(s)
{ I. t --
Finger pier(s) _._._ <J L.e + /l Groin length F , PVL
number — —._. ^.4 — ....
_
Bulkhead/ftiprap length /� �.- .- ..._ Ji E.c- 1 i yr fel
� g I av distance offshore I i �� T
/ li
I i I
max distance offshore 1 b�� j
Basin,channel I
1 5.V.2U' ! . -
cubic yards I
�e_4 1
Boat ramp ! j j ` ' }
Boathouse/Boatlift I _.._._..__._..;.._.._.__._ �;(1._._. j _.__
Beach Bulldozing j —
Other 1 j i/
�f y
e c k k a'1
Shoreline Length /-v l
I ' j i
SAV: not su--re es no
Moratorium: n/a yes6.4.1r e-u 9 � Io 1 4'
Photos: yes � I 'lU A s.
�a�? Iln,'-4-r I
Waiver Attached: yes no /�
A building permit may be required by: ( ,/NUA- . ISee note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions /r I i /./ 4 c X i i c( 1.-f`'�"
-7°r t' /1 e / 'z Kam,,` �Wa-sh:;J ', 1
�ggntpr Applicant Printed N Perm er's ri e
/ r i
Signature **Please read compliance statement on back of permit** ,-, i atur 9
1i,f P 1< / O �.1 �l" 7 /'J// 2�� zU f" �/, 7oz
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the
Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden, Chowan, Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
?-2.i
0❑CAMA/ ❑DREDGE & FILL '' nn -HCI N9 77463 ABCD
GENERAL PERMIT Previous permit#
>Z ❑New 1lModification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC •
Rules attached.
Applicant Name Project Location: County / .
Address Street Address/State Road/Lot#(s) , ,
City State ZIP
Phone# ( ) i ' / E-Mail Subdivision .;i // •' ' .- `I,
Authorized Agent / r • , i City ZIP
Affected E CW ❑EW ;it/PTAI]ES PTS Phone# ( ) River Basin -- c=--
s) ❑()EA HHF ❑IH ❑UBA ❑N/A
AEC( : Adj.Wtr. Body (nat /man /unkn)
❑ PWS:
ORW: yes / no PNA yes / no Closest Maj.Wtr. Body
Type of Project/Activity
(Scale: , : c.) )
Pier(dock)length ,
Fixed Platform(s) r'5I ' (' ' sx) F I 4 i
V I I 1
Floating Platform(s) :` ' . I I I
'
r
Finger pier(s) I I I I
t- IIIILE
II , j................... .__..._._.. .._._._._.................__. l_._._...1.. ..._._Buhead/ praplength ` 7-' 1avg distance offshore O / ■■■® ■■■■■■■�■■���■■■■■■■■■■■■ ���
III11111111
Basin,channel
1111111
cubic yards 1
Boathouse/Boatlift / IiII
11111111
` H__-__1_-_..IHIH1!IIIIHHIIP.
■ ■
Other
1
I 1 J
Shoreline Length i
SAV: not sure yes no U ■M■■�■ ; i._L-.E■■■ - R'1�■■•■■■■■�■■
Moratorium: n/a yes not® ■ ■■ ■ `r II■ II E■■■■
1 Photos: yes Q U_._._■■■■■� .__..._-_1...... ...... ■ .._ UU ■ ■ ._......._. ■■ ... i
Waiver Attached: yes �no1 I I T. '
A building permit may be required by: r'' • . See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions '/ --.° t—'
ifigent or Applicant Printed Name Permi officer's f rin "^Name
Signature **Please read compliance statement on back of permit** Signature j
/Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other: _
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford,Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
Arr..A
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue,Governor James H.Gregson, Director Dee Freeman,Secretary
Date '14 — 2--0
Name of Property Owner Applying for Permit:
J 4z177
Mailing Address:
I certify that I have authorized (agent) � "c" to act on my
behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to
install or construct (activity) i 1, ," ,
at (my property located at)
This certification is valid thru (date)
' -, . is
Property Owner Signature Date
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-28081 FAX: 252-247-3330\Internet: www.nccoastalmanagement.net
An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to r V I\11 QrA `11.410141AF( S
C�, (Name of Property Owner) Oc -
property located at l al ✓1,tbYetile. ,� �1r. 14l t4 8.5/P2
(Lot,Block,Road,etc.)
on Y1cPejCrPe /V�l<. ,in_ Berg, ,N.C.
(Waterbody) (Town and/or County)
Applicant's phone# 247O-a1i'Mailing Address:
He has described to me,as shown below,the development he is proposing at that location,and,I
have no objections to his proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To be filled in by property owner proposing development)
( L
/119
VI
[ 104 6 c--
,, /
vi�
h
\
P
(Information for Property Owner Applying (Riparian Property Owner Information)
for Permit)
66 7 Entirnen E2d
Mailing Address Signature
or,k0,f3erri a85140a Bruce Ly nc h
City/State/Zip Print or Type Name
CA- 0 -a7 ,259- 511- 5q( 5
T hone Number Telephone Number
1 1 OC+ 2 a, 20,_.0
i Date Date
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to William and Elizabeth Flockharts s
(Name of Property Owner)
121 Shoreview Drive,New Bern NC 28562
property located at
(Lot,Block,Road,etc.)
Brice's Creek/Trent River New Bern(Craven Co.) N.C.
on ,th_ ,
(Waterbody) (Town and/or County)
Applicant's phone#•• Mailing Address 119 Shoreview Dr.New Bern
�iC 285fi2
He has described to me,as shown below,the development he is proposing at that location,and,I
have no objections to his proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To be filled in by property owner proposi development)
/ ife
A
/7I
(Information for Property Owner Applying (Riparian Property Owner Information)
for Permit))Sol itj nni Ppi �/K�/ Qp p7A7 PEA
aop
K.OE
Mailing Address xTzwa� fl=lg SCPMCEA tore
}� �r � CH79BYOE 7W K4 0P
N 6e ►`►2 u 110 Paul and Heather Truog
City/State/Zip Print or Type Name
T hone Number—, Telephone Number
11 ' 10/16/2020
1 e Date Date
1 ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY
Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR) regulations 15A NCAC 02B. 0233 and 0259. The Division of Coastal
Management(OCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line(NWL)or normal high water line(NHWL)and extends 30feetlandward)shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing&Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes
maintaining diffused (non-channelized)flow of storm water runoff through the suffer.
3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads)only;sites where wave overwash is
expected to be severe,the first ten(10)feet landward(unless specifically authorized otherwise by DCM)from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation ata stern density of 260 stems per acre.
Non wooded sites may be re-vegetated with woody vegetation. Restorationmustbe completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
,
• Pre-project site conditions: / iS' �.-is, A,e.fr-J71
7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing,grading,and construc lJon
corridors.This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above list co ' ons a rify that all
inf ation is com lete and accur ./
Age t or Ap i ted Nam a it c Signature
ent or A scant Signature Issue Date ///2-c3I
CAMA GENERAL PERMIT#:
77 ' 3 C-
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington.NC 27889 1252-946-6481
Wilmington Office 1127 Cardinal Drive g,n.Wilmington NC 28405-3C45! 9:C-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808