HomeMy WebLinkAbout77406_Erick & Kristen DeCosta_20201013 g K 0 CAMA/ ❑DREDGE & FILL �
�D# (07057 N° 77406 A 'B C D
GENERAL PERMIT Previous permit#
❑New ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued /;-
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC -7 f ct.t) . .
, []Rules attached.
Applicant Name`T . 'C 4. -v ' ' ,-, ( -)`.1.-1ck Project Location: County �ec=ck.\ .
Address /' 5.7 (,.)/• (is fr .1<ak Street Address/State Road/Lot#(s) i/ �g
City / ,-.....„..c,-,-, State rJ c ZIP 2_7 0 0 fa l,&l k ,,,(1,, `:' c ,4
Phone#( 4) �`- `'C---7 E-Mail Subdivision
Authorized Agent ' \-A' - City i O/c.,_ ZIP Z 7 J 0 G
❑CW 114(W [LlI 1A DES ❑PTS Phone# (.''4 �U - River Basin 1 glpia m
Affected C OEA ❑HHF ❑IH ❑UBA ❑N/A AEC(s): Adj.Wtr. Body C•re L r y
0)/man /unkn)
❑ PWS:
ORW: yes / no PNA yes / no Closest Maj.Wtr. Body a ro)` (CT) P► 0 e r
Type of Project/Activity { j= r y'(-'Lt)
T. f )(.)i (Scale: / 1 51-- )
Pier(dock)length
Fixed Platform(s) i
Floating Platform(s) I l l {.
Finger pier(s) ! j II
I
Groin length I \, /- /
number -r ...._._...._ j Xs-+b-4S.. .t1--- — ... I- .. l'J '
Bulkhead/Riprap length It_`C^, ` — f - e?g. k --_—_-- �s.- ,. ,\` —._-' I I—
! —
avgdistance offshore �' I'U ..tt `� �,
•max distance offshore C'
Basin,channel , {
I1 t
cubic yards I f I
Boat ramp i
Boathouse/Boatlift --1-- —,✓ d _..-- -- -
iV uc,-t \. 1 iv 1-
Beach Bulldozing — '. (I= r — i
fOtheJW ^ aS tlLLi
r , �ti Y!' - ,- fk
1 ;
1.. Z p`� �
5 `,- 1 i � i
4 V � / 1 •AEG i
Shoreline Length U .cif' \�'
SAV: not sure yes a _�
- .. _—_ _
i ��_T c70 1T I*)OOr ' "I �
. ! fMoratorium: n/a yes no { c( Ne-v-' �F H L}� y
�,4.� k — f -/
4. <
Photos: yes _� ❑—� j , 4 L,1K —
Waiver Attached: yes
A building permit may be required by: . L'See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) -
Notes/Special Conditions , 4. r-1 ; - 4-,. . • ,\ ),: IN h Lt,,-I/, \\ o 1c Lv 7L
1) ,_ C .
-3Lj\k\-Nt4 , S - MUII� �c e) T+'Le• c 'e (DCts+-G, /
w 4 la
Zd C ita-v y :c r--
• P' Name Perm' fficer's Printed Name
Signature Ple ead con-liance statement on back of permit** ' nature
- C-14._ , "---- .?(9(7 w - /-2 2e)t_o --- 2-- / - 2-r - 1
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie,Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
0 E CAMA/ ❑DREDGE & FILL 2 N° 77406 A BCD
GENERAL PERMIT Previous permit#
>Z ❑New - Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC
❑Rules attached.
Applicant Name Project Location: County
Address Street Address/State Road/Lot#(s) //
City State ZIP i
Phone#( ) / E-Mail Subdivision -- -- '
Authorized Agent City , 4'5. ZIP
❑CW W D-4STA ❑ES ❑PTS Phone# ( ) �7
[ River Basin
Affected ,_,, ft. "'R t v•C=
AEC(s): ❑OEA ❑HHF ❑IH ❑UBA ❑N/A Adj.Wtr. Body ii!.14.1l::'% (.r*`/man /unkn)
❑ PWS: .
ORW: yes / no PNA yes / no Closest Maj.Wtr. Body
Type of Project/Activity '
(Scale: )
Pier(dock)length
Fixed Platform(s) , 1
t ( 1 I' /�!
Floating Platform(s) n 4, :1! `� 'moo fi/ 1
Finger pier(s) - / j i "1. �� Y_
Groin length ! i 1 j i
number - �. :- z '. `- .j=I ._N 1 _.._..._....._.. ! �' i j.......
r i 1 1 t..
Bulkhead/Riprap length - - -T"� --_4 1 .L�t L ti�~�_._. d� - � � ��, '-
avg distance offshore 1; �T - " V <
Y max distance offshore -
Basin,channel j ; 'I I . i
I i j
cubic yards -
Boat ramp I + �"
/ 1 I
Boathouse/Boatlift -- --_ -- -
T
l
. 4 �—i- tot 1_ -r,ti 1 1 � ----- - � ;
Beach Bulldozing ; ----" .
Other x:' ! kt�%L. ' { . S
FRS\ # I e _ ` l,+
s t
1 i i r _ J.
T /I
Shoreline Length L !\-,,--.'."" ;= " '-* 1 t t i I,, '`
1111
SAV: not sure yes no 1 - _~
Moratorium: n/a yes no �I _ �. A _ ,_.. '3 _.77 �....
Photos: yes no I I II ! ! 0' rw a "jv"i r" r P-__
� . w w
Waiver Attached: yes 6_,,, c�' ' 1
A building permit may be required by: . 7See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions • r
0O C ; 7/� \/ ---
gen and Printed Name Perm4fiicer's Printed Name "-----
Signature "Ple ead compliance statement on back of permit** S' nature
/(" - / -' 7 ,' t ,'' - ', r
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
10/12/2020 Yahoo Mail-sea wall
sea wall
From: Toni Starling (tonistarl@yahoo.com)
To: jrstarling56@yahoo.com
Date: Monday, October 12, 2020, 02:19 PM EDT
Oct 11, 2020
To Whom it may concern:
Mr and Mrs Decosta at 1159 Whealton Pt Rd, Aurora NC have our permission to build a sea wall adjoining our property at 1161
Whealton Pt Rd, Aurora NC
Antoinette A Starling
es R Starling
A /Jv
A//) 1;49 -zz_= kW'„.1 G�4,1c1w�
4 A\ .0.„.A„.....„)
1/2
num.J II I IUII�I III
Sent: Monday, October 12, 2020 8:24 AM
To: bob carlyle
Subject: Re: set up on job from cama
Per our conversation this morning we would like for you to proceed and would request that you obtain
the permit for the construction. Thank you
Erik and Kristi de Costa
From:simon slim
Sent: Monday, October 12, 2020 8:24 AM
To: bob carlyle
Subject: Re: set up on job from cama
Per our conversation this morning we would like for you to proceed and would request that you obtain
the permit for the construction. Thank you
Erik and Kristi de Costa
On Thursday,October 8, 2020, simon slim<krieri1990@gmail.com>wrote:
Do you also have the cost to do in riprap?
On Thursday, October 8, 2020, bob carlyle<poledriver2@hotmail.com>wrote:
Kristi
Cama went by and put some steaks out were we would have to place wall
I am not very happy with the placement but as I told you when we meet I don't have any thing to do
with were they set the line I was hoping they would give us more
But as it stands looks to be around 100 ft long and at top of hill
We will be able to back fill the wash outs behind that line
We can build that wall out of vinyl (I can show you a lot we do) (mr potter has one that has been there
for a long time)
This will require a permit of$400 from cama
And will cost$135per ft or 13 500 plus fill
$
I think it will only take a few loads they will be charged out at$200 per load which will include placing
behind wall
1
They also said we can add rock at base but I am not sure that will be a lot of help for what you have
going on
We will need to put some of rocks on end to seal from erosion
I think all work can be done with permit and fill for around $15,000
Again I am really not pleased with the line from cama but as I told you they deemed it had not be
maintained and wet lands have taken over on bottom
The rock would have to be added in front at water line at bottom and i don't think it will help save the
wash
Let me know what to plan on and I will get things underway asap
Thanks bob Carlyle
252 560 0934
Sent from Mail for Windows 10
On of -;oasta4I mgt. mac4tat I spact Comp t.r S3iaet
Applicant
Date:
General Permit
Describe below the HABITAT disturbances for the application. All values should match be aarne,and units of measurement
found in your Habitat node sheet
j TOTAL Sq_ Ft. FINAL Sq.Ft. TOTAL Feet FINAL Feet
I ;Applied for. i (Anticipatednrtal ; (Applied for. (Anticipated inal
DISTURB TYPE I Disturbance total disturbance. Disturbance disturbance.
aabitat Maine Choose One ncludes any Excludes sry otal includes ; Excludes any
anticipated :estoradar any anticipated -estoration and/or
restoration or and/or'amp restoration or temp mpact
:emo impacts) , :mpactamcun( temp mpacts) amount)
Dredge] Filly Both ] Other I] I /
141-6/1A., &ioi ,� Dredge❑ Fill Both iE Other ❑ I / 0 /64V
I I'
Dredge': !il; Both ❑ Other ] I
j 1
Dredge j Fit 7 Both 7 Other f_
I i
Dredge FiIt U Both Other I •
Dredge Fill Both U Other
_
Dredge'� Fill, 3cth � Other
Dredge Fill": Both J Other
Dredge'J F Il Beth a Other ❑
Dredge Fill 0 Both 71. Other 1-1
•
Dredge Ti Fill] Both ❑ Other
•
Dredge' Fill.] 'Both 7 Other El
Dredge 0 Fill Both Other 0 •
•
Dredge: FIII Both ] Other i[
-
t ROY COOPER
;•^' • Governor
MICHAEL S. REGAN
Secretary
Coastal Management- BRAXTON DAVIS
ENVIRONMENTAL QUALITY
Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal
Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line(NWL)or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
- filling in the buffer is a violation of the riparian buffer rules.
2. Clearing& Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes
maintaining diffused (non-channelized)flow of storm water runoff through the buffer.
3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below,
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads)only;sites where wave overwash is
expected to be severe,the first ten(10)feet landward(unless specifically authorized otherwise by DCM)from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through/March 30) after completion of the bulkhead.
• Pre-project site conditions: �91 >' -zebitA isl q )6,0 -"-'(--5 I�
7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading,and construction
corridors.This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed condition d verify that all pinfor ti n is;G pplle/te and accurate.
Agen li t Prrnnted Name P rn t fficers ature
Agent or Applicant gnature Issue Date
CAMA GENERAL PERMIT#14. ( ! ((
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington.NC 27889 1252-946-6481
Wiitninaton Office 1177 Cardinal Drive Frt WiIn i"gto NC 7Ran5-38 5 1910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808