HomeMy WebLinkAbout10724_General Permit_19920715Pier (dock) length
Groin length
number
Bulkhead length
max. distance offshore
Basin, channel dimensions
cubic yards
Boat ramp dimensions
Other
C A.,
—7 , 13 �� K
CAMA AND DREDGE AND FILL
GENERAL
PERMIT °r N9 1Q7�4
as authorized by the State of North Carolina
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC
Applicant Name Phone Number
Address
City. /, TC, t„(
Project Location (County, State Road, Water Body, etc.)
Type of Project Activity
State
PROJECT DESCRIPTION SKETCH
Ile, C t � l(/fir
M
Zips
(SCALE:
f I/ /
�, Sow Y,:\ d N\ e
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine,
imprisonment or civil action; and may cause the permit to be-
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
In issuing this permit the State of North Carolina certifies that
this project is consistent with the North Carolina Coastal
Management Program.
applicant's signature
permit officer's signature
_ 1
r--
issuing date expiration date
attachments
application fee f 4"C • ` o
SunFest '92 MAF
LEGEND
A - W
Vendor Sections
n
Concert Entrances
[,
SunFest Currency
Exchange
T
Concert Ticket
Office & Main Bank
Beach
ABPD
Public Safety &
Emerg. Medical
I..I D Q
SunFest
Adminlstrci %;on
New Boar-lwalk
Controlled /lccess
Porto Jon;
ENTRANCE
TO
FESTIVAL N
• - a
CD
Q
LL a
a
C7 �
4
j:
10,
1 4i
GO-CART
< < &
FERRIS o
4 WHEEL
;d
.
0
OPULIC
O ;z
PARK I G ��\ 3 MAP LEGEND
7:
QP L 2 � 1. Welcome Tents
CO
� C1 2• Main Festival Stage (Bands)
C m 3. Secondary Festival Stage
QQ (Do Stuff)
4. Small Performing Stages
Q . 5. Dumpsters
6. Concert Band Staging Area -p
and Dressing Rooms
h The Maid CONCERT All Vendors, Press, Musicians,
STAGE Is Located A Event Staff, Etc., check in at
On TI'Ee Beach. HDQ in the Pavillion
m
E -N F -N
D-S n Fr_3 D S-1 E-S F -S 4
COORS-TRK
5 PAVILLION
(HDQ)
PRESS WB
< Q CON ";ERT AREA I AMERICA'Itl
Cn
�J RED CROS
------------J TENT
ATLANTIC 0CEAN
SUNFEST FESTIVALS, INC.
P. O. BOX 2328,
MOREHEAD CITY, NC 28557
919 726-8014
i�
BB&T
..CR.....NO wH0 TMUfT COMrANV
MOREHEAO CITY. NORTH CAROLINA 28557
_q2352
1110000015211' i:053L0112Li:5L10011'
ama&'.u!®pfIDH1' l
152 ill
% 66-112
9
531
1
_J $ ��. CIC-1'
_DOLLARS
State of North Carolina
Department of Environment, Health, and Natural Resources
Division of Marine Fisheries
P.O. Box 769 • Morehead City, North Carolina 28557-0769
James G. Martin, Governor
William W. Cobey, Jr., Secretary
16 July 1992
MEMORANDUM
TO: Charles Jones
FROM: P.A. Wojciechowski�
SUBJECT: Sunfest Music Festival at Atlantic Beach
William T Hogarth, Director
(919) 726-7021
I recommend that the proposed barriers along the water line be
placed in such a manner (approximately 30 feet) to allow the passage
and use of the dry sand beach by the general public, without
interference.
PAW/jjp
An Equal Opportunity Affirmative Action Employer