HomeMy WebLinkAbout23389_MILLS, PETER J_19991203CAMA AND DREDGE AND FILL ;.,, :.__ _, ,► .y f, !;�$�
GENERAL
FEB 0 2 2000
PERMIT _ �i
as authorized by the State of North Carolina
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15A NCAC
Applicant Name I "Y
Address Jrr� r
City
Project Location (County, State Road, Water Body, etc.)
Type of Project Activity
PROJECT DESCRIPTION
Pier (dock) length
Groin length
number
Bulkhead length
max. distance offshore
Basin, channel dimensions
cubic yards
Boat ramp dimensions
Other
-t i3�---
SKETCH
1
=?
Phone Number
State L!k - Zip
r r r °.- ,i
(SCALE: None— )
,I) Q i
�< i,.x t C4:tttCEttl �1.'
This permit is subject to compliance with this application, site 9
drawing and attached general and specific conditions. Any �s��
violation of these terms may subject the permittee to a fine,
applicant's signature
imprisonment or civil action; and may cause the permit to be-
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
permit otticer's signature
3 bre, rr >< t
issuing date expiration date
attachmentsf
In issuing this permit the State of North Carolina certifies that rr
this project is consistent with the North Carolina Coastal application fee f 1 i?°`1P " !�!' fie` r ee-
Management Program.
C§
Peter and Barbara Mills
BILL HOLMAN 39748 Hwy 264 E.
SECRETARY
Belhaven, N.C. 27810
Ai � �r
NORTH CAROLIN EPARTMENT F
ENVIRONMENT AND NAT AL RESOURCES
DIVISION OF C ASTAL MANAGEMENT
29 June 2000
Dear Mr. And Mrs. Mills:
DONNA D. MOFFITT
DIRECTOR
This letter is in reference to your application for a CAMA Major Permit received
by this office on 12 June 2000 to construct a covered boat ramp, a launch pier and two
wooden groins and perform maintenance excavation at your property on a manmade canal
off of the Pungo River, near Ponzer, Hyde County, North Carolina. I have reviewed the
application for completeness and have found a few items that need to be addressed prior
to accepting the application as complete.
Overall
The information you provided is clear and understandable. There are a few issues
that need to be corrected. The proposed boathouse is larger that what is allowed by rule.
The proposed dock is wider than the 6' allowable. If an 8' dock is necessary, include an
explanation to justify the additional width.
items
DCM-MP-I
4.b. Should be 11 acres
4.m. Need to describe how wastewater on your property is disposed of i.e.
septic tank.
DCM-MP-4
a. The maximum width allowable for a pier is 6 ft. Plat shows a 2' x 8' dock
adjacent to the boatramp.
b. The total area allowed to be covered by a boathouse is 400 ft2. You
propose to cover 448 ft2. A 16' x 25' structure would meet the size
requirement. VWPIZA
WASHINGTON REGIONAL OFFICE
943 WASHINGTON SQUARE MALL, WASHINGTON, NC 27889
PHONE: 252-946-6481 FAX: 252-975-3716
AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST -CONSUMER PAPER
DENR TOLL FREE HOTLINE: 1-877-623-6748
Peter and Barbara Mills
Page 2
29 June 2000
PIat(5)
Overall
Plats show a 2' x 8' dock adjacent to the covered boatramp, but application describes a 16' x 28' dock.
Plat 1 of 3
There is a post in the center of the boatramp in this drawing. This would cut your usable ramp
area to ±7' .
Plat 3 of 3
Need to explain what the hatch marked areas represent, and show the area to be covered by the
boatramp and roof. You also need to illustrate the area of the canal that you plan to excavate.
I am returning the entire application package, including your $400 check (#5123), to you so that
these items can be addressed. As soon as you can provide this information to me and I can accept the
application as complete, the 75 day processing time can begin. If I can provide you with any assistance,
please call me at (919) 946-6481.
Sincerely,
Q
Tracey L. heeler
Coastal Management Representative
cc: vOharles Jones- Assistant Director, DCM
Terry Moore - District Manager, Washington Regional Office, DCM
Doug Huggett - Major Permits Chief, DCM
Raleigh Bland - US Army Corps of Engineers