HomeMy WebLinkAbout21917_GARRETT JR, HERMAN E_1999063077
4 '.... tom--
`O
CAMA AND DREDGE AND FILL
GENERAL N0 21-917 A
PERMITil��
as authorized by the State of North Carolina
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15A NCAC
Applicant Name
Address }zic
C ( `4— r= 4'v�2- `r
! �� 0
Phone Number 4I76 - 50_2�
City Y1if � �{��
Q L 2"76) Li'
State
Zip
Project Location'(County State Road, Water Body, etc.) �X
�' I C
� 42l� C 62j:)1 0 q::1?Ti�)�/
Tyne of Project Activity
PROJECT DESCRIPTION SKETCH VT1 V�-0p �
Pier (dock) length
Groin length
number
Bulkhead length
max. distance offshore
Basin, channel dimensions
cubic yards
Boat ramp dimensions l
Other f
`✓ 4 Mf
----�J (SCALE.
L�
'I124,,U, n_)S
f�(jLJy�b Str� I 1 N� iC 1.!/z �C
51`-1XEL6AL' S -V44417-hTIIJ
i ZOUh SFT W117�-e4.1/rr(r_� (h= tVvdt_
vJ L
k`3Ch12��
6AUZ T;
F
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine, _
imprisonment or civil action; and may cause the permit to be- '
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
6/-1) /,5-,
attachments
applicant's signature
permit officer's signature
4 153_
ssuing date expiration date
In issuing this permit the State of North Carolina certifies that
this project is consistent with the North Carolina Coastal
Management Program.
application fee ��� OUP`
is
Vi
diNovember 2, 1999
Mr. Herman E. Garrett
Rt. 5, Box 64 CAMA
Hertford, NC 27944 -25 ?�s
Re : General Permit No. 021917A,
Dear Mr. Garrett :
IIl
i;
NOV 0 4 1999
COASTAL MAN,^ CEMENT
�40!�EHEAD
This letter is in reference to your CAMA General Permit which was issued on June 30, 1999.
This permit authorized the placement of rip rap along the shoreline of property located at Box
64, Hertford Beach within the waters of the Perquimans River in Perquimans County.
On October 18, 1999 a site visit was conducted at this site to determine and confirm that your
project was completed in accordance with the Specific Conditions concerning rip rap shoreline
stabilization structures as referenced in Subchapter 7H .1100 of the North Carolina
Administrative Code and the Coastal Area Management Act. During this inspection, it became
apparent that you have not started the work proposed and previously authorized under the above
referenced General Permit. As a courtesy, 1 wish to remind you that CAMA Permit 021917A
expired on September 28, 1999. Since this work falls within the permit jurisdictional areas
defined as Estuarine Waters and/or Public Trust Area, as described in Subchapter 7H .0206 and
.0207 respectively, of the North Carolina Administrative Code, a permit will be required from
this Division prior to the completion of this project as originally approved in CAMA General
Permit 021917A.
Than you for your time and cooperation in regard to this / these matter(s). If you have any
questions, please feel free to contact me at (252) 264-3901.
Sincerelv,
Dennis W. Hawthorn
Coastal Management Representative
cc : Charles S. Jones, Assistant Director, DCM
Doug Huggett, Permits Coordinator, DCM
Raleigh Bland, USCOE
North Carolina Department of Environment and Natural Resources • James B. Hunt Jr., Governor • Wayne McDevitt, Secretary
Division of Coastal Management • Donna D. Moffitt, Director
Elizabeth City Office • 1367 US 17 South • Elizabeth City, NC 27909 • Phone 252-264-3901
PERMIT COMPLIANCE MONITORING REPORT
Project / Permittee Name : Herman Garrett County : Perquimans
Permit Number: 021917A Expiration Date : Sept 28 , 1999
Location : Perquimans River, Box 64 Hertford Beach
Division Representative: DWH
Project Representatives Present : Herman Garrett
Type of Approved Project Activity : rip rap
Date of Inspection : Oct 18, 1999
Progress to Date : None
Permit Condition(s) Non -Compliance : See comments below / None
Corrective Action(s) Required :
Comments : Send permittee a courtesy letter advising that this general permit
has expired and a new permit will be required prior to the start
up or continuation of work.