HomeMy WebLinkAbout21254_VILLAGE MARINA, LLC_19991113CAMA AND DREDGE AND FILL
GENERAL M 021254 A
PERMIT DEC 16 1998
as authorized by the State of North Carolina
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15A NCAC P7 /-/_ //ata , ../S-06; ;20o0
Applicant Name " 1114 a A -14R Jx'id `- I' LPhone Numb r
Address
City 4'10 -T- 14 S i1, ) f -i v E'_ . State C. Zip
Project Location (County, State Road, Water Body, etc.) DACC C'b'UNT y Al C /a2
Type of Project Activity ,C' 00 � L= X1 S 'r r-)yG 19 N ego SLC D r S T 1/ A)c e—
+'tf 15 H- fie U' Al AlA,'TPAlce 4DA'e6C-4W N#IROrZc ' qac 6:4 FcfT - 7"
a;,n1 toAre,tz p] HF R PC0PFI C - G_ A) gCK,r+Itj)—rM)v F&,9 -r
P,eiN7' G' i" 6� Xi_sri All. 0 CA�- Syp,4C& N C T S5 0oc::7 L/ sr- rPS .
PROJECT DESCRIPTION SKETCH p -7- a c F 5 (SCALE: )
Pier (dock) length
/4 7 i L)
Groin length
Spam'% ,� y
number
i �f
Bulkhead length -5 00 "C �) u' U %e AA)d A ,SS5t-'C, -4 �` S
max, distance offshore
e �4- i
Basin, ehwmel dimensions
'v %-7 )a '-Y - 7
cubic yards y (0 0 co k"�
Boat ramp dimensions
Other
C Xl rin/�(
dcc /I.
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine,
imprisonment or civil action; and may cause the permit to be-
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
1 �
applicant's signature
permit officer's signature
9 y // 7..m y �?
issuing date d�E��ilN� i do date
attachments f yC(> '2 COD
In issuing this permit the State of North Carolina certifies that C, 0�;
this project is consistent with the North Carolina Coastal application fee pU C 3
Management Program.
___ "iJ.