Loading...
HomeMy WebLinkAbout31349_KEAN, GEORGE_20020603CAMA / DREDGE & FILL GENERAL PERMIT New Modification Complete Reissue Partial Rei As authorized by the State of North Carolina, Department of Environment and and the Coastal Resources Commission in an area of environmental concern pL Applicant Name < Address CityState ZIP Phone # (_ ) Fax # ( ) Authorized Agent CW ❑ EW ❑ PTA El ES ElPTS Affected AEC(s): OEA ❑ HHF ElIH El UBA ❑ N/A PWS: ❑ FC: ORW: yes / no PNA yes / no Crit. Hab. yes / no Type of Project/ Activity Pier (dock) length Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore_ max distance offshore Basin. channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other Shoreline Length SAM notsure yes no _ Sandbags: not sure yes , no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no -- A building permit may be required by: Notes/ Special Conditions 7 Agent or Applicant Printed Name 1 Signature % "Please read com�piiance statement on back of permit" Applica ionFee(s) Check# 71Resources 1 Previous permit # 2G172pte Jrevious permit issued _ - int to 1,,5A NCA�aEMEN1' ❑ Rules attached. Project Location: County Street Address/ State Road/ Lot #(s) Subdivision City ZIP Phone # ( ) -_ River Basin Adj. Wtr. Body (nat /man /unkn) Closest Maj. Wtr. Body (Scale: ) I _L r See note on back regarding River Basin rules. Permit Officer's Signature Issuing Date Expiration Date Local Planningf urisdiction Rover File Name R Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules. Division of Coastal Management Offices Central Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: Parker -Lincoln Building 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 / 1-888ARCOAST Fax:919-733-1495 Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Morehead City District 151-B Hwy. 24 Hestron Plaza II Morehead City, NC 28557 202-808-2808 Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-395-3900 Fax:910-350-2004 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 10/05/01 • NCDENR North Carolina Ce pal-tment of Environment and Natural Resources 10vision of Coastal Management Michael F, Easley, Govemor Donna D. Moffitt, Director William G. Ross Jr., Secretary 3 June 2002 Ms. Jane Bemis 264 Bennett Avenue " "=ASTAL Long Beach, CA 90803 11 RE: George Kean _ MpRFHEAD_ Proposed construction of riprap on waterward side of existing. wall at Schrams Beach, Belhaven in Beaufort County, Washington North Carolina Dear Ms. Bemis: The Division of Coastal Management has reviewed your 19 May 2002 correspondence objecting to the above referenced project. The riprap as proposed will be contained completely within the riparian access area and is consistent with North Carolina Administrative Code 07H.1100 (See Attached). The project as proposed is consistent with the appropriate rules and regulations of the Division, Therefore, on 3 Ju n :3 2002 Steve Trowell of my staff issued CAMA General Permit No. 31349-B authorizing the aforementioned project. (See Attached) If you wish to appeal tHs permit decision, you may file a request with the Director of the Division of Coastal Management, Department of Environment and Natural Resources within 20 days of the permit decision. I have enclosed a copy of the permit. If you have any questions regarding this matter, please don't hesitate to contact me at (252) 946-6481. Sincerely, �o r- Terry E. Moore District Manager Division of Coastal Management Washington Regional Office TEM/ksf ENC. L-ec, Charles Jones - Assistant Director, DCM 943 WE4shirnAn Square Mail, Washington, North Carolina 27889 Phone: 252-943-6Q11 FAX: 252-975-37161Internet http,11dcm2.enr.state.nc.us An Equal Oppui 1, miry 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper