HomeMy WebLinkAbout32015_CONASTER, BERNIE_20020829CAMA / DREDGE & FILL
GENERAL PERMIT
New Modification Complete Reissue Partial Reissue
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC
Applicant Name
Address
City__` State _ ZIP
Phone # (__ ) Fax # (_)__
Authorized Agent
Affected CW DEW ❑PTA ES PTS
AEC(s): OEA ❑ HHF ❑ IH UBA N/A
PWS: C PC:
ORW: yes / no PNA yes / no Crit. Hab. yes / no
Type of Project/ Activity
Pier (dock) length
Platform(s) _
Finger pier(s) _
Groin length
number
Bulkhead/ Riprap length
avg distance offshore
max distance offshore (+
Basin, channel
cubic yards _
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing_
Other
IP
Shoreline Length
SAV: not sure yes no - -
Sandbags: not sure yes no
Moratorium: n/a yes no
Photos: yes no
Waiver Attached: yes no
A building permit may be required by: See note on back regarding River Basin rules.
Notes/ Special Conditions
!V
Previous permit
Date previous permit issued
Rules attached.
Project Location: County
Street Address/ State Road/ Lot #(s)
_
Subdivision
City i _ ZIP
Phone # ( ) River Basin
Adj. Wtr. Body ^(nat Jman Junkn)
Closest Maj. Wtr. Body -
(Scale: )
Agent or Applicant Printed Name
Signature Please read compliance statement on back of permit
{
Application Fee(s) Check #
Permit Officer's Signature
i
Local Planning Jurisdiction
Expiration Date
Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules.
Division of Coastal Management Offices
Central Office Elizabeth City District
Mailing Address: 1367 U.S. 17 South
1638 Mail Service Center Elizabeth City, NC 27909
Raleigh, NC 27699-1638 252-264-3901
Location: Fax: 252-264-3723
Parker -Lincoln Building
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293 / 1-888-4RCOAST
Fax:919-733-1495
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Morehead City District
151-B Hwy. 24
Hestron Plaza II
Morehead City, NC 28557
202-808-2808
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-395-3900
Fax:910-350-2004
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 10/05/01
$e ity.. h_n ni rd Ancu ent_ 5.-_t'n"k I_defnII<_
BROWN PELICAN ENTERPRISES, INC.
P.O.BOX 4999 PH 354-4931
EMERALD ISLE, NC 28594
DATE Z q
14909
66-30/531
342
TO THE PAY �r �\(� _ 1$ loo as
ORDER OF ---
// �_l!�6
owe �tLtyLt`�� `�` / /Do DOLLARS
F)RS'T CITIZENS IQ
ll ,{ N V FirslCilizons Bank 8 Trust Company
�t\l I� Cape Carlorot, N.C. 28584
G��' .37oLs
FOR CO K o,7S� ✓ / v'�m , 1'�J/�lL
11'01490911' i:053100300%:0034122463030
Fax Cover
Brown Pelican ,Enterprises, Inc.
111 James Street
Emerald Isle North Carolina 28894
252-354-4931
Fax: 252-354-5198
Date: g� 1�1�DZ
To: Nk e ✓✓2 ��ve
Subject: Cc, v,ase,- A\cADOl�c�`�;d�
AUG 1 5 2002
Pages: Co u -e � P ' F e 14 1'V ..
PP
PIC�c, Se ScLed L& iQ ���s �� 4 �� P- IieS�
Cp-1 �/6-3g9-6966
C
Adjacent Riparian Property Owner
(for sound front bulkhead)
I hereby certify that I own the property adjacent to the
& Mrs. Bernie Conatser located at 9704 Lord Berkeley Dr., Emerald Isle,
N.C. on Bogue Sound.
The applicant has described to me, as shown on the attached sketch, the
development being proposed at that location. I have no objection to this
proposal and I understand that the proposed bulkhead will adjoin my
existing bulkhead at the west side boundary of my property.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
Bulkhead sketch attached.
Signature:
Name: Bill Flynn
Phone: � Y � - --2 -� / _ i Y-7 (
Date:
Brown Pelican Enterprises, Inc.
Emerald Isle, North Carolina 28 -
252-354-4931/FAX: 252-354-5198
August 16, 2002 ij�AUG 1 9 2002
Mr. Bill Flynn
9702 Lord Berkeley Dr.
Emerald Isle, N.C. 28594
MEMORANDUM: Notification of CAMA Minor Development Application
by Mr. & Mrs.Bernie Conatser, owners of the property located at 9704 Lord
berkely Dr. (Lot 19, Block 46), Emerald Isle, N.C.
Dear Mr. Flynn:
This is to notify you of the intent to construct a bulkhead along the
sound side of the subject lot. The bulkhead will be essentially identical in
design and materials to the bulkhead under construction on your property
and will join to the west end of your bulkhead.
All requirements of the Coastal Area Management Agency (CAMA),
the North Carolina Building Code and the Town of Emerald isle will be met.
If you have any questions, and/or opposition to these improvements, please
submit them to:
Michael B. Johnson / Brown Pelican Enterprises, Inc.
P.O. Box 4999
Emerald Isle, N.C. 28594
If you have no objection, please sign and submit the attached Adjacent
Riparian Property Owner Statement. A stamped self-addressed envelope is
provided for this purpose.
Sincerely,
e�
Mich ael B. ohnson
President
,�a • vrr�irr ~``--
ewse' cvr AUG 1 2002
/�, 4�/ I ASTA NIANACaEDAE�1i
�.,
au�ktkFAD(D
I C087 /V 6/* J.9'46 e
Q ' J10 ' QO to w �+
CI
I 0 .d �► JCQ .S4
Qfo p oSed • Q
is"ti c . • a ��. zt .Yr, as
r8 04 N 4l a�
7 2.9 '
KoLKirJ bL�LKNEAD
1E; 54
SOElcliF2
5fr,.�9
h
145, �,� Z9.04'
i)
6'"
9, ?'6'
• j� oL K 1 rJ •
q woo* W,*�
7
14. 64
N_05*JO•CIO"
k
1.2tc 66'
.:;PPK
1
o•t�
Rx2ct vv'
Rf 40.. DU'
r,474. 90'
.CGw/1-ft1/ .4
AUG 1 � 2002
Adjacent Riparian Property Owner Sta
(For sound front bulkhead)
I hereby certify that I own the property adjacent to the west boundary of Mr.
& Mrs. Bernie Conatser located at 9704 Lord Berkeley Dr., Emerald Isle,
N.C. on Bogue Sound.
The applicant has described to me, as shown on the attached sketch, the
development being proposed at that location. I have no objection to this
proposal and I understand that the proposed bulkhead will adjoin my
existing bulkhead at the East Side boundary of my property.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
Bulkhead sketch attached.
Signature: -- J
Name:
Phone: I / Cr - ?a t
Date: Y`�—
Brown Pelican Enterprises, Inc.
Emerald Isle, North Carolina 28894
252-354-4931/FAX: 252-354-5198
August 16, 2002
Dr. & Mrs. Jon Kolkin
9706 Lord Berkeley Dr.
Emerald Isle, N.C. 28594
MEMORANDUM: Notification of CAMA Minor Development Application
by Mr. & Mrs.Bernie Conatser, owners of the property located at 9704 Lord
berkely Dr. (Lot 19, Block 46), Emerald Isle, N.C.
Dear Mr. Flynn:
This is to notify you of the intent to construct a bulkhead along the
sound side of the subject lot. The bulkhead will be essentially identical in
design and materials to the bulkhead on your property and will join to the
east end of your bulkhead.
All requirements of the Coastal Area Management Agency (CAMA),
the North Carolina Building Code and the Town of Emerald isle will be met.
If you have any questions, and/or opposition to these improvements, please
submit them to:
Michael B. Johnson / Brown Pelican Enterprises, Inc.
P.O. Box 4999
Emerald Isle, N.C. 28594
If you have no objection, please sign and submit the attached Adjacent
Riparian Property Owner Statement. A stamped self-addressed envelope is
provided for this purpose.
Sincerely,
Michael B. ohnson
President
Bu�Kt��AD —
4.90
P,ro posed
eo,,I,Ase✓ _
4 u\kl,e
44sel�CilvrN
1
vif
h .• .. �LYNt�
1
h• f= Nam.
AUG 29NO?
� a
c�c.�rs
/10.cl?r IN
1.9
N 4,7 VJ'40 "e I , �► zzt oo
5.
16,54 #
SoEtch�R
e>k (Kt4&AD
/Y .7 JV vv
•� �61
22
N CIJ*44?51" w
Rj,2a �d •
R� 40 0U4s
.CAMMCyY.4
APPLICATION FOR
AUG 19 2002
Y
CAMA
NA
MOR GS NT p
COASTAL �AD ; MINOR
DEVELOPMENT
PERMIT
In 1974, the North Carolina General Assembly passed
the Coastal Area Management Act and set the stage for
guiding development in the fragile and productive areas
which border the state's sounds and oceanfront. Along
with requiring special care by those who build and
develop, the General Assembly directed the Coastal
Resources Commission (CRC) to implement clear regula-
tions which minimize the burden on the applicant.
This application for a minor development permit under
CAMA is part of the Commission's effort to meet the
spirit and intent of the General Assembly. It has been
designed to be straightforward and require no more
time or effort necessary from the applicant. Please go
over this folder with the Local Permit Officer (LPO) for
the locality in which you plan to build to be certain that
you understand what information he or she needs.
Under CAMA regulations, the minor permit is to be
issued within 25 days once a complete application is in
hand. Often less time is needed if the project is simple.
The process generally takes about 18 days. You can
speed the approval process by making certain that your
application is complete and signed, that your drawing
meets the specifications given inside and that your
application fee is attached.
Other permits are sometimes required for development
in the coastal area. While these are not CAMA-related,
we urge you to check with the Local Permit Officer to
determine which of these you may need. A listing is
included on page 2 of this folder.
We appreciate your cooperation with the North
Carolina Coastal Management Program and your
willingness to build in a way which protects the
resources of our beautiful and productive coast.
Coastal Resources Commission
Division of Coastal Management
Locality
GENERAL INFORMATION
LAND OWNER
Name eS ev r\ � e- a.c
Address
a S
Co Lqo SQ
✓.
Permit Number
AUG 19 2002
City M D VC�C - % ✓ State V 01 Zip Z. Z0 Z Phone 70 3 730 — Sgl6
AUTHORIZED AGENT I
Nameyowv-, p_�►co�-. �,n�. - C . NAzc- ..c.QA . �o�r�SU-L�
Address I I t S a --. eS S-+ .
City XS7 �e State M C Zip
LOCATION` OF PROJECT
9-704 Lovc� ?e✓1ZA
re
2RSg4 Phone ZSZ-354-4qZ j
QYDv.-R�y�.� c,ks S�Uv.,
(If not oceanfront, is waterbody natural or manmade?)
Na-Vk.va \
- &2, v.�
S�
DESCRIPTION OF PROJECT �+V0. � �'�`
���
L o C AL�
L a LIA w C_�C� o�
I � `w✓S 1n � v e �S--r Cc ,.�.g� v.n c.� 6 � �• � '� vti e ✓S�'
AREAS OF ENVIRONMENTAL CONCERN (AEC) CLASSIFICATION
(To be filled in by the Local Permit Officer prior to completing application.)
Ocean Hazard Estuarine Shoreline ORW Shoreline
PROP SED USE
7Residential Commercial/Industrial Other
SIZE OF BUILDING IN SQUARE FEET /VIA
5�,;, e.s Z
Other
S�.o✓e
I
Size of other impervious onbuilt upon ur ces (s�}ch as d ive�vays, etc.) within 75 f e of the shorelin (575 feet
of an ORW shoreline u lie d w . I b e a Y�x : �+�.'� \y A . S 1A, ('oe
nne��. \ti:c�, wo. Y a �Q��x �, b �o fp Uv► '�Tv
SIZE OF SITE IN SQUARE FEET Lo-� a v� 14, 000 Sty. rrl .
OTHER PERMITS MAY BE REQUIRED ...
The activity which you are planning may require
permits other than the CAMA minor permit you
are applying for here. As a service we have com-
plied a listing of the kinds of permits which might
be required. We suggest that you check over this
list with your Local Permit Officer to determine
which, if any, of these may apply to your project.
This is not a requirement of CAMA, only a sugges-
tion to help you complete your project as quickly as
possible.
Zoning, Drinking Water Well, Septic Tank (or other
sanitary waste treatment system), Burning, Electri-
cal, Plumbing, Heating and Air Conditioning, In-
sulation and Energy Conservation, FIA Certifica-
tion, Sand Dune, Sediment Control, Subdivision
Approval, Mobile Home Park Approval, Highway
Connection, Others:
STATEMENT OF OWNERSHIP
AUG 1 5 2002
I, the undersigned, an applicant for a CAMA minor development permit, B M4j*owner Of property in
an area of environmental concern or a person authorized to act as an agtmt-iQrpu oses of applying for a
CAMA minor development permit, certify that the person listed as landowner on this application has a sig-
nificant interest in the real property described therein. This interest can be described as follows: (check one)
C,Jse✓
an owner of record title, Title ested in B� ✓ e_ A !q VA M°"' , see Deed Book
page 04 G in the Ca is ve;f- County Registry of Deeds.
an owner by virtue of inheritance. Applicant is an heir to the estate of
probate was in
County.
if other interest, such as written contact or lease, explain below or use a separate sheet and attach to this
application.
NOTIFICATION OF ADJACENT PROPERTY OWNERS
I furthermore certify that the following persons are owners of properties adjoining this property. I affirm that I
have given ACTUAL NOTICE to each of them concerning my intent to develop this property and to apply for
a CAMA permit.
(Name)
(2) brA MV
(3)
(4)
(Address)
a 2 4_0-� gpv��Q('Qy %V
FOR DEVELOPERS IN OCEAN HAZARD AND ESTUARINE HAZARD AREAS:
e, C zsSQq
Ts1e,4)J.(Z ip
I acknowledge that the land owner is aware that the proposed development is planned for an area which may
be susceptible to erosion and/or flooding. I acknowledge that the local permit officer has explained to me the
particular hazard problems associated with this lot. This explanation was accompanied by recommendations
concerning stabilization and floodproofing techniques.
PERMISSION TO ENTER ON LAND
I furthermore certify that I am authorized to grant and do in fact grant permission to the local permit officer
and his agents to enter on the aforementioned lands in connection with evaluating information related to this
permit application.
This application includes: general information (this form), a site drawing as described on the back of this ap-
plication, the ownership statement, the AEC hazard notice where necessary, a check for $50.00 made payable to
the locality, and any information as may be provided orally by the applicant. The details of the application as
described by these sources are incorporated without reference in any permit which may be issued. Deviation
from these details will constitute a violation of any permit. Any person developing in an AEC without a per-
mit is subject to civil, criminal and administrative action.
ZooZ
This the 1-7 day of A KS -�-- .
Land owner or -person aorized to act as his agent
for urposes of(f/}li/ng a CAMA p�e[�pit application.
r
n
Y
r
O
n
r
SITE DRAWING/APPLICATION CHECKLIST
Please make sure your site drawing includes the following information required for a CAMA minor develop-
ment permit. The drawing may be simple and not necessarily to scale. The �Local Permit Officer -will help you,
if requested. IT--R`
PHYSICAL DIMENSIONS
abel roads
label highways right of ways
label local setback lines
�Iabel any and all structures and driveways currently
PHYSICAL CHARACTERISTICS
draw and label mean high water mark (MHW)
N f� draw location of septic tank or filter field
If you will be working in the ocean hazard area:
draw and label dune ridges (note height)
draw and label toe of dune
identify and locate first line of stable vegetation
draw and label setback line under CAMA
draw and label topographical features (optional)
If you will be working in an estuarine shoreline area:
draw and label landward limit of AEC
describe terrain (slope)
DEVELOPMENT PLANS
AUG 19 2002
draw and label areas that will be disturbed
if a house is to be placed on lot, describe location of house
note size of piling and depth to be placed in ground
draw and label all areas to be paved or graveled
describe composition of surface
note and list fully all trees and vegetation to be removed or relocated
show landscaping
NOTE TO APPLICANT
Have you:
*completed all blanks and/or indicated if not applicable?
*notified and listed adjacent property owners?
*included your site drawing?
*signed both application and statement of ownership?
*enclosed the $50.00 fee?
*completed an AEC Hazard Notice, if necessary?
FOR STAFF USE
Site Notice Posted Final Inspection Fee Received
Site Inspections
Date of Action: Issued Exempted Denied Appeal Deadline (20 days)