Loading...
HomeMy WebLinkAbout30720_BERTIE HERTFORD NORTHAMPTON DRAINAGE DIST_20020320FCAMA / DREDGE & FILL Nd ?07 20 GENERAL PERMIT Previous permit # IQ ❑New ❑Modification Li Complete Reissue ❑Partial Reissue ; _Date previous permit issued i As authorized by the State of North Carolina, Department of Environment and Natural Resources - ar and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ``_ Yi APR (fin L`J,d Rules attached. Applicant Name"�j4,�t,c_ Fly p'; (�0yq'c,rv. Or` 1 i .t 11i�s� M Project L ��&n: Jcounty -A -0 . Address City_ `v rc r, StateC, ZIP a i C145 ( n Phone # j Y)� f, Fax # ( ) Authorized Agent ❑ CW ❑ EW KPTA ❑ ES PPTS Affected AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A ❑ PWS: ❑ FC: ORW: yes /; no PNA yes / no Crit. Hab. yes / no Road/ Lot #(s) Q, PV%", ,C_ rtCc v,_ Subdivision City 4t, �r ZIP Phone #fie.` ) i ,- T-1 River Basin (j� _)( Adj. Wtr. Body QQ I t tjN-, t i C (nat�an /unkn) Closest Mal. Wtr. BodyC\­'C:t--%C-r, Type of Project/ Activity ���� � c p c�� r < ��. ,, r S&, \1 RE C% , 6c �.. �, c ,i' s ,-fir a1 n t.. Aha�k ;� C Ce �k , (Scale: r e n� .• Pier (dock) length Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length ---- avg distance offshore ^- max distance offshore Basin, channel ....- cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other( u,\�, ! crrlcl1 �1t.�r rr r n Shoreline Length ii V r n ,1PS SAM not sure yes Sandbags: not sure yes n Moratorium: n/a yes n Photos: yes no Waiver Attached: ! yes no A building permit may be required by: Notes/ Special Conditions Agent or Applicant Printed Name Signature Please read compliance statement on back of permit Application Fee(s) Check # See note on back regarding River Basin rules. r, Q0, PermitOffi ' ignature Q(7') Qo 7`S rye. ��OZ Issuing Date Expiration Date ­T'- ')C7!cXB Local Planningf urisdiction Rover File Name f t Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules. Division of Coastal Management Offices Central Office Elizabeth City District Mailing Address: 1367 U.S. 17 South 1638 Mail Service Center Elizabeth City, NC 27909 Raleigh, NC 27699-1638 252-264-3901 Location: Fax: 252-264-3723 Parker -Lincoln Building 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 / 1-888-4RCOAST Fax: 919-733-1495 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Morehead City District 1 51-B Hwy. 24 Hestron Plaza II Morehead City, NC 28557 202-808-2808 Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-395-3900 Fax: 910-350-2004 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 10/05/01 3. Pipe to be set to provide positive drainage as directed by Contracting Officer Representative or Inspector. 4. Eroded section of travelway to be rebuilt and surface graded away from the channel. 5. Sediment bars, debris, trees, etc. that deflect channel flow toward the bank to be restored, to be removed as directed by the Contracting Officer Representative or Inspector. NGDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Govemor Donna D. Moffitt, Director 2 April 2002 Hertford Soil and Water Conservation District Attn: Mr. Paul Boone PO Box 265 Winton, North Carolina, 27986 William G. Ross Jr., Secretary r200d COASTAL MANAGEMENT MOREHEAD On 18 March 2002 Mr. Steve Trowell and I, Field Representatives for the Division of Coastal Management (DCM) in the Washington Regional Office met with you at your office in Winton, North Carolina. The purpose of the meeting was to discuss the Bertie, Hertford, Northampton Water District's plans to repair/replace failing culverts and perform bank stabilization along portions of Ahoskie Creek, near Ahoskie, in Hertford County, North Carolina. During the course of that meeting, the question arose as to whether that section of Ahoskie Creek running between NC Highway 561 and SR 1427 (Thomas Bridge) was navigable, and therefore a Public Trust Area, which is an Area of Environmental Concern (AEC) as designated by the Coastal Resources Commission and subject to permit requirements. On 28 March 2002, Steve Trowell, Ed Lynch, Planner for DCM, Lynn Henry of the Division of Marine Fisheries, and I successfully navigated that section of Ahoskie Creek running between NC Highway 561 and SR 1427 (Thomas Bridge) in canoes. Due to fallen trees, we had to portage for a short distance (less than 20 feet) on two (2) occasions; however, we observed a discernible creek bed at all times. Based on this information, that section of Ahoskie Creek is navigable and is a Public Trust Area. The channelized section of Ahoskie Creek located upstream of the NC Highway 561 bridge crossing (including the proposed project area) is also navigable, is a Public Trust Area AEC, and is subject to permit requirements. On 20 March 2002, I issued General Permit No. 30720-B to the Bertie, Hertford, Northampton Water District for the repair/replacement of failing culverts and to perform bank stabilization at nine (9) sites along that portion of Ahoskie Creek located between SR 1118 and SR 1101. As we discussed at the time I issued the general permit, those activities authorized by the permit would be more appropriately authorized via the CAMA major permit process. Therefore, I encourage you to either have completed all work authorized by the aforementioned general permit by 20 June 2002 (the expiration date of the general permit) or to incorporate these activities, as previously suggested, in a Major CAMA application for maintenance excavation, etc. of the Ahoskie Creek drainage project. 943 Washington Square Mall, Washington, North Carolina 27889 Phone: 252-946-6481 \ FAX: 252-975-3716 \ Internet http://dcm2.enr.state.nc.us An Equal opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper Hertford Soil and Water Conservation District Attn: Mr. Paul Boone 2 April 2002 Page Two Thank you for your time and cooperation in resolving this matter. If you have any questions about this or related matters, please call me at 252-946-6481 ext. 280. Sincerely, CJ Guy C. Pearce Coastal Management Representative cc: ~Charles Jones - Assistant Director, DCM Terry E. Moore- District Manager, Washington Office, DCM Steve Trowell — Field Representative, Washington Office, DCM Ed Lynch — Planner, Washington Office, DCM Lynn Henry — Division of Marine Fisheries, Columbia Office