Loading...
HomeMy WebLinkAbout11583_General Permit_19930409S r G-rJ 0 tr F5 r� /� a M /-�- 0 rF► e� ri LAuD0w1,451v5 Tv 6r /o/zov/pC,D I CAMA AND DREDGE AND FILL Applicant Name Address GENERAL PERMIT rr-T--7. # APR s 199- U 99 U Lit-/ ............. ..----- as authorized by the State of North Carolina IDepartment of Environment, Health, and Natural Resources and the Coastal Resou es Commission in an area of environmental concern pursuant to 15 NCAC d // / -7 O c> �",t{ G/'zG C5" _ V /) 7 H A Ivk A /M I C A l OS R E 1NG Phone Number i't 4/ 5�3� J 3 k). rT 4,5r ti i.,_"h IL S i x e, --TI City A / c I N &- 7- ` 0-) SKETCH F 5 State V—!) zip e2-:7 -101,3 Project Location (County, State Road, Water Body, etc.) DA Ri C av NT/ 1140 420C./C 0A19 /00 , WIyE Loy- A0TAeF,vT Civ/L/L�Tuc/C 50U J1) F4 Type of Project Activity 4PAL/c,9-T 15 6 - 7-11CXI z4LI Tc F/e t / N .i/ C5eI9xY-4 &Ac// -(r- 1=1 LL ANowAe_J o,r Ito ' of S/c.T 5CXEE,.,11-,Cr 4-0,1c6EJ sc, r r/_/;GTEJ AL0NGC_ :V PECK /9/L/1 G-5 PROJECT DESCRIPTION SKETCH F 5 (SCALE: Pier (dock) length SO TU _!3 fel LL i �i- i — _�� Groin length F4 number Bulkhead length Lt 3 max. distance offshore - — Basin, channel dimensions. I 1 ty z cubic yards Boat ramp dimensions Other t 0 � - 7 This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written --statement -has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. J--9 -93 issuing date applicant's signature permit officer's signature 7 -y -q3 expiration date attachments 70 L47-HtIM 4. A4/CAS In issuing this permit the State of North Carolina certifies thatcc ` this project is consistent with he North Carolina Coastal application fee 5O Management Program.