HomeMy WebLinkAbout11583_General Permit_19930409S r G-rJ 0 tr F5 r� /� a M /-�- 0 rF► e� ri
LAuD0w1,451v5 Tv 6r /o/zov/pC,D
I CAMA AND DREDGE AND FILL
Applicant Name
Address
GENERAL
PERMIT
rr-T--7.
#
APR s 199-
U
99 U Lit-/
............. ..-----
as authorized by the State of North Carolina
IDepartment of Environment, Health, and Natural Resources and the Coastal Resou es Commission
in an area of environmental concern pursuant to 15 NCAC d // / -7 O c> �",t{ G/'zG C5"
_ V
/) 7 H A Ivk A /M I C A l OS R E 1NG Phone Number i't 4/ 5�3�
J 3 k). rT 4,5r ti i.,_"h IL S i x e, --TI
City A / c I N &- 7- ` 0-)
SKETCH F 5
State
V—!)
zip e2-:7 -101,3
Project Location (County, State Road, Water Body, etc.)
DA Ri C
av NT/
1140
420C./C 0A19
/00 , WIyE Loy- A0TAeF,vT
Civ/L/L�Tuc/C
50U J1)
F4
Type of Project Activity 4PAL/c,9-T 15 6 - 7-11CXI z4LI
Tc
F/e t / N
.i/ C5eI9xY-4
&Ac// -(r- 1=1 LL ANowAe_J
o,r Ito '
of
S/c.T 5CXEE,.,11-,Cr
4-0,1c6EJ
sc, r r/_/;GTEJ AL0NGC_ :V
PECK
/9/L/1 G-5
PROJECT DESCRIPTION
SKETCH F 5
(SCALE:
Pier (dock) length
SO
TU _!3 fel LL
i
�i-
i — _��
Groin length
F4
number
Bulkhead length
Lt 3
max. distance offshore
-
—
Basin, channel dimensions.
I
1
ty
z
cubic yards
Boat ramp dimensions
Other
t
0
�
-
7
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine,
imprisonment or civil action; and may cause the permit to be-
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written --statement -has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
J--9 -93
issuing date
applicant's signature
permit officer's signature
7 -y -q3
expiration date
attachments 70
L47-HtIM 4. A4/CAS
In issuing this permit the State of North Carolina certifies thatcc
`
this project is consistent with he North Carolina Coastal application fee 5O
Management Program.