HomeMy WebLinkAbout11012_General Permit_19930721CAMA AND DREDGE AND FILL
GENERAL
PERMIT
as authorized by the State of North Carolina
Department of Environment, Health, and Natural Resources and the Coastal Resou es Commission
in an area of environmental concern pursuant to 15 NCAC I I I' '
Applicant Name
Address ' �'�
City
Project Location (County, State Road, Water Body, etc.)
Type of Project Activity i
Phone Number
State Zip
PROJECT DESCRIPTION
Pier (dock) length
SKETCH
?
C L j�
/r
S
(SCALE:
1 1
M1
I
l i l j
I
Groin length
number
Bulkhead length
max. distance offshore17
Basin, channel dimensions
cubic yards
Boat ramp dimensions
i
i
i
Other
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine,
imprisonment or civil action; and may cause the permit to be-
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
In issuing this permit the State of North Carolina certifies that
this project is consistent with the North Carolina Coastal
Management Program.
attachments -
application fee
applicant's signature
permit officer's signature
issuing date expiration date
MAP SKETCH ADDENDUM
Borrower/Client
Property Address
City County State Zip Code
Lender
BUILDING SKETCH
i
� V
,l
4 f f.
.t�� crjTiNG JOCKS
rz
1440 Q S C
1
m
July 16, 1993
Dr. Murphy McGirt, Jr.
135 Yaupon La.
Atlantic, North Carolina 28511
Dear Murphy
I am requesting your permission to complete construction of a
bulkhead on the west side of my boat basin. The bulkhead will be
constructed of pressure treated sea wood exactly like the bulkhead on the
east side of the basin. Please see the enclosed diagram for the dimensions
and placing of the bulkhead.
If you approve of this construction, please sign this letter below.
Thank you,
L
sen
I have been advised of Mr. Hansen's proposed bulkhead
approve.
Dr. Murphy McGirt,
Date
July 16, 1993
Mr. Tommy B. Powell
129 Yaupon La.
Atlantic, North Carolina 28511
Dear Tom,
I am requesting your permission to complete construction of a
bulkhead on the west side of my boat basin. The bulkhead will be
constructed of pressure treated sea wood exactly like the bulkhead on the
east side of the basin. Please see the enclosed diagram for the dimensions
and placing of the bulkhead.
If you approve of this construction, please sign this letter below.
ThankOu,
Larry Hansen
I have been advised of Mr. Hansen's proposed bulkhead construction and
approve.
Tommy B. Powell
Date
= �_
�-- ._ � — _
- - "� � � -
--
,�� �a.--
.�,:
.._�
�- � i-�3
�e� Ham.
/ ��i
�6 �3 y