HomeMy WebLinkAboutGeneral Permits (363)CERTIFICATION OF EX PT ON 9cot
FROM REQUIRING A CAMA PERMI
0 as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
�'" �r-
nn
Applicant Name !� (�.�.-ri C�=6 Phone Number 7� y_ /?% S'
Address < / A 7
City - o State Zip a �'
Pro ct Location Count y
� ( y, LSiate Road, Water Bod/ ,etc.)
p �,
0
Type and Dimensions of Project
The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA permit is
above is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expiration,
quirement pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be necessary
CAMA permit requirements does not alleviate the necessity of to continue this certification.
your obtaining any other State, Federal, or Local authorization.
SKETCH (SCALE: )
f
1 4-
Any person who proceeds with a development without the con-
sent of a CAMA official under the mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that (1) the ap-
plicant has read and will abide by the conditions of this exemp-
tion, and (2) a written statement has been obtained from adjacent
landowners certifying that they have no objections to the
proposed work.
Applicant's signature
i
CAMA Official's signature
i S / ,'
Issuing date
Expiration date
Attachment: 15 North Carolina Administrative Code 7K .0203
a
�' 0_� 9 - 117 / R7
1705 Pugh Street
Fayetteville, NC 28305
18 NOV 92
Mr. David Field
Lox 117
Gloucester, NC 28528
Dear Mr. Field:
This will acknowledge your 2 NOV letter and telcons. concerning
bulkhead construction on your property. I hereby approve the
construction on your property which you have requested. I am
planning similar construction on my property in the near future
and request similar authorization and documentation on your part.
The neighbor to the west of my property indicates that he wants
to construct a bulkhead in the near future.
Please advise the contact point for the governmental offical
responsible for approving bulkheads as I will have to secure the
necessary approvals for bulkhead construction on my property.
Good luck on your venturer
Sincerely,
William E. Cannon
Cx�
v Please insure that the bulkhead construction company fills
and secures the end of your bulkhead so it does not wash out
before my pending bulkhead is completed and attached to your
bulkhead. ��
7
l� p�4iP,oak� �j Ra,✓� e�
1
J�a
7z-
4 // -� &r" gs"-
e-q_al�