Loading...
HomeMy WebLinkAboutGeneral Permits (310)CERTIFIC M�OF E� EMPTIOW FROM REQUIR 'U 'F(A� �R' I as authorized by the Stat o}" ,_ . Department of Environment, Health., and Natural ResS_uLws and the Coastal Resour s C mmission in an areaof environmental concern pursuant to 15 NCAC Subchapter 7K Applicant Name Phone Number 4933 Address .�) r r ��r.>yY , .f .K City Project Location (County, State Road, Water Body, etc.) _ Type and Dimensions of Projpct U F' The proposed project to be located and constructed as described above is hereby certified as exempt from the CAMA permit re- quirement pursuant to 15 NCAC 7K .0203. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal, or Local authorization. State /f 1 Zip a? This certification of exemption from requiring a CAMA permit is valid for 90 days from the date of issuance. Following expiration, a re-examination of the project and project site may be necessary to continue this certification. SKETCH (SCALE: ) yJ f G 0 fY� Any person who proceeds with a development without the con- sent of a CAMA official under the mistaken assumption that the development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the Ovelopment. The applicant certifies by signing this exemption that (1) the ap- plicant has read and will abide by the conditions of this exemp- tion, and (2) a written statement has been obtained from adjacent landowners certifying that they have no objections to the proposed work. i Applicant's signature / CAMA Official's signatu Issuing date Expiration date Attachment: 15 North Carolina Administrative Code 7K .0203 STAT£ o f State of North Carolina Department of Environment, Health, and Natural Resources 512 North Salisbury Street • Paleigh, North Carolina 27604 James B. Hunt, Jr., Governor March 25, 1993 Mr. James E. Stevens Board of Directors BLACKBEARD SAILING CLUB, LTD. P. O. Box 303 New Bern, NC 28560 Dear Mr. Stevens: Jonathan B. Howes, Secretary Attached is a Certificate of Exemption From Requiring a CAMA Permit to repair and maintain the docking facility by replacing 3 mooring piles and designated planking at Blackbeard Sailing Club, Ltd., off SR1600 and Upper Broad Creek, near Fairfield Harbor, in Craven County. In order to validate this permit, please sign all three (3) copies as indicated. Retain the yellow copy and the attached regulation (7K .0203) for your files and return the blue and green signed copies to us in the enclosed, self-addressed envelope. Your early attention to this matter would be appreciated. Sincerely, ames L. Mercer Field Representative JLM/dh Enclosures cc: Charles S. Jones P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-4984 Fax k 919733-0513 s An Equal Opportunity Affirmative Action Employer March 23, 1993 Mr. James Mercer N. C. Division of P.O. Box 769 Morehead City, NC Dear Mr. Mercer, Coastal Management 28557 r .. MAR 2 4 1993 i.- U U L, L'J ---- ----------------- — Per our phone conversation of 22 Mar., I have enclosed copies of diagrams showing the area of pier damage done at Blackbeard Sailing Club, Upper Broad Creek, Craven County, NC. by the storm of March 13 and 14, 1993. At this time it would appear that three pilings on 'C' dock will have to be replaced. One is broken off and has floated ashore. Two are leaning over and may be broken also. A 48' boat broke mooring lines and did the damage to the three pilings in addition to some dock planking on 'C' dock. Damco Marine Construction Co. has been contacted and has given us a preliminary bid of $1250.00 to replace the one piling and reset the other two if they are not broken. If the others are broken the repair cost will be higher. They won't know the extent of the damage until the barge is in place and the two damaged pilings have been pulled and inspected. There was other dock planking damage done to all three docks by boats pounding on the docks. Approximately 15 to 20 planks total must be replaced on the three docks. We plan to do that work on our previously scheduled maintenance work day, Saturday 27 March, as we have extra planks on hand at this time. One finger pier was also damaged at the end of 'B' by the 36' boat tied there. That work will also be done on the work day. The planking work must be done ASAP as it now is hazardous for club members to get to their boats over the damaged areas. We are therefore requesting the necessary permission to repair the storm damage done to our piers and pilings. If you need any more information please call me at 919-633-5936. Si erely yo s, c ames F. Stevens For the Board of Directors Blackbeard Sailing Club, Ltd. P.O. Box 303 New Bern, NC 28560 UPPER BROAD L . r-�_o wze,5 Doc, Soo' &A(Ck13EAZD SAILING CLV ,LTD. ��. OLD PILINGS R/F'�^,yA.:E L' F,P�f�1 W.L. FLv✓�E.t S .SEPT /9B3 � PROP05co NEW P/Ep ATfj CL UB PART IAiG RAM PARK;NG VE1a o,Ry 3 9, T -TUPA6 E Plemc � ELTF BL r=?+�'�:' �•�/; R �; c; (L l ;"J� �.� Jam, % 'D, r"�FOF?'. 'i '�'� EXISTING PIERS_ F4 CRAVEN CO, �40FEk"Ty Ll,•JE ;;OV,'J!�kl<•=,��1+.1D /S'SET 54, LINE OFDI1/IS/4W U= 7' OLD\ PlLiNGs > - c4 EX/STI"G d�• YYATEQ GEPTHS 9ARir46c1 1:P1 �jbet wATO,C4 WATE.P FLo'N ►�RvF�2T�;� �0 5 �-40- 6sc PRo FE (ZT '7 / L /NE 90 ° To OF C/w/7 NNE L l� 'SET CLACK C-- aS c �RvPck'Ty c/rvE cxr���s/oN D -A �o (loSI.IAS 2��X 12.5�� ($SIRS 35�X�Z•5� }--- 14. SLIPS zz 95' /DD' �i civGK (cA/J//NC�J /0RAVV/NG *'-eSC -C: -" S lee 0 Z, Za1' �2om SNvk� i DAm��t: �? Nj 0 • ��,� �� PrE'of=os� n (-y-poC,L f EMA4 1993 ------ i