HomeMy WebLinkAbout50162_BERTSCH, MARY JO_20080221:7N
C'lr
GE & FILL ? 50162
PERMIT Previous permit #
ew ❑Modification L7Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources /-
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC (�`► .v[ �(.�
t 10 Rules attached.
A licant Namer T� Pro ect Location: Coun ��(A�i
PP �! - -- 1 �'--
Address_°�' i,. :; Street Address/ State Road/ Lot #(s) r`" jr
City 4 State i'dczIP
r,
Phone # r - � 0(.�Fax # M� C� (,;� . )_-�- (_) - Subdivision �
Authorized Agent h �_ _ ti City ZIP%
Affected U Cw D� ,�TA �S ❑ PTS Phone # ) [> River Basin L15
C l OEA F] HHF ❑ IN ❑ USA ❑ N/A
AEC(s): Adj. Wtr. Body /man unkn'
-' PWS: ❑FC:
^} ��. Closest Maj. Wtr. Body
ORW: yes /J PNA yes /�i� Crit.Hab. yes —
Type of Project/ Activity
(Scale: y0 17 - )
Pier (dock) length ,
Groin length _
number
Bulkhead Ripra length -,700
avg distance offshore ---
max distance offshore C
Beach Bulldozing
Shoreline Length
SAV: not sure
yes
no
Sandbags: not sure
yes
no
Moratorium: n/a
yes ,i
no
,.
Photos:
yes-
no
Waiver Attached:
yes
nod--�-'"-
A building permit may be required by: _
Agen or Applicant Printed Name ?
Signature
y
nature ' Please reackComplian Zstatementonbackofpermiit(
XSee note on back regarding River Basin rules.
i'
Per7it9fficer'f Signature f
Expiration Date
t�f f '- �,-) -) I /1. 4 A
Foley Contractors, LLC.
1810 Old Airport Rd.
New Bern NC 28562
252-229-6467
May 21, 2009
Dear Sirs/ Madam,
Mary Jo Bertsch and Melany Furimsky have contracted us to install a 40' long by 5' wide
dock with a 10' wide by 16' long walkway. Also we will install a boatlift as well and place 6 loads
of granite to their shoreline. This letter serves notice to you on our intentions in the permitting
process with the NC Division of Coastal Management. Please sign the enclosed form and mail it
using our self addressed stamped envelope. We very much appreciate it and should you need
any of our services please don't hesitate to call or email me.
Sincerely,
Dan I Foley
President, Foley Contractors, LLC.
dan@foleycontractors.com
North Carolina Department of Environment and Natural Resources
` Division of Coastal Management
Charles S. Jones, Director
Michael F Easley, Governor William G Ross Jr., Secretary
Date November 26, 2008
Applicant Name Bertsch & FurimsU
Mailing Address 732 White Horse Dr Greenville, NC 27834
I certify that I have authorized (agent) Foley Contractors, LLC. To act on my
behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to
install or construct (activity) Dock ,
at (location) 531 Prichard Ave. Havelock, NC 28532
This certification is valid thru (date) 1 year
Signature �� ` —
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-2808/ FAX 252-247-3330/ Internet: www.nccoastalmanagement.net
An Equal Opportunity/ Affirmative Action Employer-50% Recycled/ 10% Post Consumer Paper
■ Complete items 1, 2, and 3. Also complete
item 4 if Restricted Delivery is desired.
■ Print your name and address on the reverse
so that we can return the card to you.
■ Attach this card to the back of the mailpiece,
or on the front if space permits.
1. Article Addressed to:
ones
SSUa /I�a�,s Creek-12eQ
/7�lve,1oc.I< A/C aks3a
❑ Agent
by (Prtntif Name) I C. Date of
D. Is delivery address different from item 1? LJ Yes
If YES, enter delivery address below: ❑ No
3. jr'Cr1t1IrType
eed Mail ❑ Express Mailegistered ❑ Return Receipt for Merchandise
❑ Insured Mall ❑ C.O.D.
4. Restricted Delivery? (Extra Fee)
2. Article Number ❑ Yes
(Transfer from service label) l 0 0-7 % 9(D )ED 9033 9//,K
PS Form 3811, February 2004 Domestic Return Receipt
102595-02-M•1540
■ Complete items 1, 2, and 3. Also complete A.
item 4 if Restricted Delivery is desired. X
■ Print your name and address on the reverse
so that we can return the card to you. B
■ Attach this card to the back of the mailpiece,
or on the front if space permits.
1. Article Addressed to:
Arc1}n 6v��r��
3/55 N6 awl /O/
A)& a853�,
Je ❑ Agent
LL ❑ Addressee
(Prinked Name), C. Date of Delivery
D. Is delivery address different from item 1? ❑ Yes
It YES, enter delivery address below: ❑ No
3. Service Type
CCertified Mail ❑ Express Mail
❑ Registered ❑ Return Receipt for Merchandise
❑ Insured Mali ❑ C.O.D.
4. Restricted Delivery? (Extra Fee) ❑ Yes
2. Article Number ' 7 Q
(Transfer from service labeg / V a� l ()OOD 9033 9i, 5
PS Form 3811, February 2004 Domestic Return Receipt 102595-02-M-1540
Page 1 of I
CEMETARK- AITCHARI]
CARLTOi4! `Ju01TH JOHNSON TRUSTEE
fUVVARDS, MICHAEL I &SUSAN G
PELOSI, ELEANOR M
110]
I
I�
III SEGAL, JONATHAN & KAREN
I 8259]
MORRIS, RODNEY E & VICKI -
MORESCHI, RAFAEL M & KATHERINE E
BROWN, HARRIET PRICHARD
N
F.
JONES, ELIJAH ET AL
http://gismaps.cravencounty.com/output/craven GISMAPS2164098135440.png 5/21/2009
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
p"�`' ^C Chuck Wakild, Deputy Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -
Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC
0213.0233 & .0259.
Activities covered by your Coastal Area Management Act (CAMA) permit are deemed to have
a Buffer Authorization from the DWQ only if the project can meet ALL of the conditions listed
below. If ALL the avoidance and minimization guidelines described below cannot be met, a
separate buffer authorization request must be submitted using a Pre -Construction Notification
(PCN) application to DWQ at the address below. A PCN application may be obtained on the
DWQ web site http•//h2o.enr.state.nc.us/wetlands.htm1.
Questions regarding this process should be directed to wetland/buffer staff of the DWQ in the
Washington Regional Office at 252-946-6481, or the 401 Oversight Unit in the Raleigh Central
Office at 919-733-6893.
A written authorization from DWQ MUST be received prior to any construction activities in the
riparian buffer, including land clearing. Failure to secure a Buffer Authorization prior to
construction &/or land clearing shall subject the property owner & the party (contractor)
performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per
violation.
a Minimize removal of woody vegetation in Zone 1 to what MUST be removed for the
installation of the shoreline stabilization project. Zone 1 begins at the most landward of
either the waters edge or the coastal wetland line and extends 30 feet landward.
Unnecessary clearing is a violation of the riparian buffer rules and may result in a civil
penalty assessment of up to $25,000 per day per violation.
a The property owner is responsible for site restoration of woody vegetation. Pre -project
site conditions MUST be re-established. A site that was wooded prior to this
shoreline stabilization project MUST be restored with native hardwood trees at a stem
density of 320 trees per acre. Hardwood restoration must be completed by the first
subsequent planting season (November 1 through March 30).
u Disturbance in Zone 2 of the riparian buffer, which begins at the landward edge of Zone
1 and extends 20 feet is restricted to uses listed under 15A NCAC 2B .0233(4)(b) & (6),
and 15A NCAC 2B.0259(4)(b) & (6). Clearing and grading of Zone 2 is allowed provided
that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused flow of storm water runoff through Zone 1.
North Carolina Division of Water Quality Internet: www.ncwaterouality.org . 7One j
940 Washington Square MI`all Phone: 252-946-6481 ofthCat'o�llna
V lashington, NC 27889 FAX 252-946-9215 Naturally
An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper
rdgu L
❑ For vertical shoreline stabilization projects (bulkhead) only; sites where wave overwash
is expected to be severe, the first ten (10) feet landward from the structure may be
maintained as a stable lawn in order to provide for structural stability. This certificate
condition is intended to apply only to projects adjacent to larger water bodies where the
conditions may routinely produce severe overwash.
❑ Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored, see the first condition of this authorization.
❑ When restoration is required Please submit a project map of your property indicating the
area to be restored, and a restoration plan. The DWQ website (Helpful links),
http://h2o.enr.state.nc.us/ncwetlands/RiparianBufferRules.htm may be helpful in the
preparation of the restoration plan.
This Buffer Authorization is not considered approved until the DWQ has received both
this signed form AND the project map.
Submit the requested information to:
Division of Water Quality
Attn: Surface Water/Buffer Program
943 Washington Square Mall
Washington, NC 27889
By your signature below you agree to be held responsible for meeting ALL of the above listed
conditions and verify that all information is complete and accurate. Only the property owner is
responsible for the second condition. Please be aware, violations of the above -listed conditions
are subject to civil penalty assessment of up to twenty-five thousand dollars ($25,000) per
violation per day.
Applicant/Agent's Signature
CAMA. General Permit Number:
North Carolina Division of Water Quality Internet: www.ngwaterguality.org
943 Washington Square Mall Phone: 252-946-6481
Washington, NC 27889 FAX 252-946-9215
An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper
Date
One
NofthCarohna
NaAmIly
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Chuck Wakild, Deputy Director
BUFFER AUTHORIZATION CERTIFICATE FOR PIER ACCESS
A riparian buffer authorization is required for an approved access way through the Tar -Pamlico
& Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC
02B.0233 & .0259.
Activities covered by your Coastal Area Management Act (CAMA) permit are deemed to have
a Buffer Authorization from the DWQ as long as the project can meet ALL of the conditions
listed below. If ALL of the avoidance and minimization guidelines listed below cannot be met, a
separate buffer authorization request must be submitted using a Pre -Construction Notification
(PCN) application to DWQ at the address below.
A PCN application may be obtained on the DWQ site http://h2o.enr.state,nc.us/wetlands.html.
Any questions regarding this process should be directed to the wetland/buffer staff of the DWQ
in the Washington Regional Office at 252-946-6481, or the 401 Oversight Unit in the Raleigh
Central Office at 919-733-6893.
A written authorization frorn DWQ MUST be received prior to any construction activities in the
riparian buffer, including land clearing. Failure to secure a Buffer Authorization prior to
construction &/or land clearing shall subject the property owner & the party (contractor)
performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per
violation.
❑ Pier access must cross the riparian buffer perpendicularly (which is defined as between
75 and 105 degrees). The alignment should also be located to minimize the removal of
woody vegetation to the greatest extent practicable.
❑ Walkway/access shall be made of pervious materials like open -slatted wood, mulch, or
grass. The use of impervious materials like concrete, pavers, or gravel will require a
PCN review and a separate Buffer Authorization. A request for an impervious walkway
shall include a justification of need.
❑ The width of the access is limited to six (6) feet or less. A width of greater than 6 feet
wide shall require a PCN review and a separate Buffer Authorization. A request for an
access greater than 6 feet shall include a justification of need.
❑ Please submit a project map of your property indicating the location of the pier and any
requested walkway/access.
North Carolina Division of Water Quality Internet: A A,w.ncA,aterquahrv.ore One 1
943 Washington Square Mall Phone: 252-946-6481 NorthCaroli 1a
Washington; NC 27989 FAX 252-946-9215 Nat"ally
An Equal Opportunity/Affirmative .Action Employer— 50% Recycled!10% Post Consumer Paper
This Buffer Authorization is not considered approved until the DWQ has received both
this signed form AND the project map.
Submit the requested information to:
'1
Division of Water Quality
Attn: Surface Water/Buffer Program
943 Washington Square Mall
Washington, NC 27889
By your signature below you agTee4. V held responsible for meeting ALL of the above listed
conditions and verify that all info rrrra n is complete and accurate. Please be aware, violations
of the above -listed conditions are ect to civil penalty assessment of up to twenty-five
thousand dollars ($25,000.00) ppr violation per day.
Applicant/Agent's Signature
CAMA General Permit Number:
North Carolina Division of Water Quality Intemet: www.ncwatergualitv.orQ
943 Washington Square Mall Phone: 252-946-6491
Washington, NC 27889 FAX 252-946-9215
An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper
,� /K-6yS
Date
NorthCarollna
atwnilly