Loading...
HomeMy WebLinkAbout55799_BARDEN III, GRAHAM_20100618❑CAMA / ❑ DREDGE & FILL CaENERAL PERMIT Previous permit# ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ? ❑ Rules attached. Applicant Name ! 'l P Project Location: County Address i ;J �;�, j ( ~y 'f. V( Street Address/ State Road/ Lot #(s) City 1.'' . �.' (�`} State ZIP Phone # y' 0 Fax #- O -- Subdivision Authorized Agent (' CityZIP Affected ElCW q EW ❑ PTA : aS OTS Phone # ( ) River Basin C OEA [IHHF ❑ IH ElUBA El N/A AEC(s): Adj. Wtr. Body t � ��`1 � (nat /man /unkn) ❑ PWS: ❑ FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no Closest Maj. Wtr. Body f �i Type of Project/ Activity it (Scale: f ) -- Pier (dock) length Platform(s) �— -4 FT-��:� -r-:F Finger pier(s) Groin length - number I h 7 Bulkhead/ Ri raP length avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp - Boathouse/ Boatlift Beach Bulldozing Other � I- Shoreline Length 6 SAV: not sure yes f no Sandbags: not sure yes f no - Moratorium: n/a yes no t) Photos: yes no Waiver Attached: yes no --. A building permit may be required by: ) Notes/ Special Conditions �� " - - - - — I - _- — - i r I - 11711 - rules. - - See note on back p xr regarding River Basin Agent or Applicant Printed Name Signature ** Please read compliance statement on back of permit" Application Fee(s) Permit Officer's Signatu9fi Issuing Date Check# Local Planningfurisdiction F7cpira on,D e �-a 4f Rover File Name r J � Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Mailing Address: 400 Commerce Ave 1638 Mail Service Center Morehead City, NC 28557 Raleigh, NC 27699-1638 252-808-2808/ 1-888ARCOAST Location: Fax: 252-247-3330 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 (Serves: Carteret, Craven, Onslow -above New River inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 NCDENR \IGrth uafoilna �0"2CarTrmem of irnvironment and �r/ision of �oastai Ibianagement REyEY'y �a�iES `�?idUE u � James H Gregson Governor Director �i ail!l ai ResourrBc ee-reefi,ao. Sec, et3nl BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 0213.0259 & 0233. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re- established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would remove understory vegetation is allowed. • Pre -project site conditions: (�(j s. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all information is complete and accurate. es Agent Alp Pr#am Permit Officer' Signature Agent or ica SiIssue ate CAMA GENERAL PERMIT #: Washington Office Morehead City Office 943 Washington Square Mall 400 Commerce Avenue Washington, NC 27889 Morehead City, NC 28557 One Phone 252-946-6481 Phone 252-808-2808 Northh C,�ay+rolina An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper A h i 91/1Y Version 5, 09/2009 h ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to 6 09# ` M A- T�i�� �� 's (Name of Property Owner) property located at 5 /O3Iq TR5 4WIGe (Lot, Block, Road, etc-) on %RgNr Rl // e , in 7�`Iyrli C S , N.C. (Waterbody) (Town and/or County) Applieant's phone #: Sot 3 3 S�� Mailing Addreaa: A:2 cd/ �Er ��� 3elel�l /Vc He has described to me, as shown below, the development he is proposing at that location, and, I `" ' T ave no objections co h>s prapos�ia DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: p� (To beJilled iy by roperty owner proposing dewkpawnt) (Information for Property Owner Applying for Permit) /2%F Mailing Address New A(C- CAS; Z City/State/Zip G�Z - 63Z - 301' 7V Tele one Number Signature e (Riparian Property Owner Print or Type Name �t j�pptZoxr r� arE 1�lEw x AD �TY6R CxRADE V-o saocv �c1ZTr1 cCN��`�C-QC SOD . ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to t hz L' „� u �G ✓c /6, t T%L 's ace (Name of Property Owner) property located at JIG 3 /-1' 7✓� ,� -f l ✓ ^_�'S l� Y , v (lat, Block, Road, etc.) on TYz ,e f %6 v e ,- , in / 1 eoel s , N.C. (Waterbody) (Town and/or County) Applicant's phone #. L -E33- �3�7o Mailing Address: /o/d' Ci111f-A� Nrti✓ ,ae y 7,. /VL 2— He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (To be f iUed in by property owywpropoAq development) U'� (Information for Property Owner Applying for Permit) /b/,' n fern G22c Mailing Address 7— City/State/Zip 7,S-.2-- 633 - :3J7(�' Teleph Number �% Signature Date Gtr"�- X/ o// 0 (Ri rim Pro Owner Information) k [ c)r (/scams Signature Print or Type Name 636-1�6a Telephone Number !� l6L0 +T Date V�.opa-v--O AVPROXXV� ATE i a C-lrrNA-VE NEw !�JALM6AO �TJGR C(tAO6- C ?-o ar» SL c?r-- E S \ NzmLS-zr,- o rw�E mz A7 E L %Y �z- CCN-VI?C--pC SOD. I s K( a m A Bar n, di7 Nora F Barden 66-30i531 Ph. 633-3878 119 6016 1018 Colleton Way New Bern, NC 28562 x' c PAY TO TI1E / V ii tBank for:Micro Pant sr nature line. ra p• a and linovork. First CGtizrns Bank 1 of nre•�ent > itizens 8 y P ° . do not cash. (irstcitizens.com -qr,��40, //9// .0531003001:0011 18 214SSr 06❑ �� ,NC Division of Coastal Mgt. Habitat Impact Computer Sheet Applicant: Graham Barden III Date: June 18, 2010 General Permit #: 55799C Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. TOTAL Sq. Ft. FINAL Sq. Ft. TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any Excludes any total includes Excludes any anticipated restoration any anticipated restoration and/or restoration or and/or temp restoration or temp impact temp impacts) impact amount) temp impacts amount SB Dredge ❑ Fill ® Both ❑ Other ❑ 1,580 1,580 HG Dredge ❑ Fill ❑ Both ® Other ❑ 31950 0 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-888-4RCOAST ^ www.nccoistalmanagement.net revised:02/03110