HomeMy WebLinkAbout38344_WACHTER, RICHARD_20040520i J-CAMA / C DREDGE & FILL
^ l
GENERAL PERMIT
'New ❑Modification ❑Complete ❑Partial
Previous permit#r/
Reissue Reissue Date previous permit issued 1.
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC
�,
4114
� Rules attached.
Applicant Name ;� c
Project Location: County �-
Address' �' 1 Rr e / f�e�
Street Address/ State Road/ Lot #(s)
City t`J State L ZIP`r•
c
Phone # ()Li-j 533- 1ti " Fax # ( )
Subdivision
Authorized Agent NIA
City fl' F �='�" �"� ZIP S
Affected ❑ CW D EW ❑ PTA E<i ❑ PTS
Phone # ( ) River Basin
AEC(s): ❑ ,a El HHF ElIH ElUBA El N/A
Adj. Wtr. Body r ``� �c r (nat /man /unkn)
❑ PWS: ❑FC:
rtf c ., ��✓e,✓
ORW: yes / . no PNA yes / \n Crit. Hab. yes / no
Closest Maj. Wtr. Body
Type of Project/ Activity
Pier (dock) length
Platform(s)
Finger pier(s)
Groin length
number
Bulkhead/ Riprap length �✓ !Du `
avg distance offshore E
max distance offshore
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other
s
VV
i
!%1 4
4f
i
� � I
X
I -
Shoreline Length
SAV: not sure yes n- (- ---- — -- • d �l. —.
Sandbags: not sure yes i
Moratorium: n/a yes°
Photos: yes
Waiver Attached: yes go��- - - --
A building permit may be required by: 7
Notes/ Special Conditions J ;�
Ag or AP111icant Pr' tee Names
t �
r.
Signature -iO� Please read compliance stat€Fnent on back of permit"
Application Fee(s) Check #
(Scale:
f ''
� T � 10/
i .
[See note on back regarding River Basin rules.
rermirutticer-s wgnature
Issuing Date Expiration Date
Local Planningfurisdiction / Rover File Name
1W ,
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules
-1 Neuse River Basin Buffer Rules
Other:
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules.
Division of Coastal Management Offices
Central Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
Parker -Lincoln Building
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293 / 1-888ARCOAST
Fax: 9 19-733-1495
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Morehead City District
151-B Hwy. 24
Hestron Plaza II
Morehead City, NC 28557
202-808-2808
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-395-3900
Fax:910-350-2004
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
www.nccoastalmanagement.net
Revised 10/05/01
66-301531
RICHARD E WACHTER 111 540
MARY ANNE WACHTER
431 RIVERSIDE DR
NEW BERN, NC 28560����
Ou�\l 1
FIRST CITIZENS "' MONEY MARKET SAVINGS
1� n 4(Y First-CitizensN.C.Bank 8 Trust company
r�
�!-ll �I l� Naw Be,.,Barn, N.26563
////wnj '►�,
6a?c kLJ
1:0 5 3 100 3001:00 11 2806 546 SIll 00 540
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to !�� �� �,�� \/�,c� CHTC ?'s
(Name of Property Owner)
property located at Lo; 2-2->AZQ) 4,31 P%vF'RSSK'�" Di -
(Lot, EGck, Road, etc.)
on N v. �E i�,v� R in t�� F�ER�t — C'�ay�� Cz� , N.C.
(Waterbody) (Town and/or County)
He has described to me as shown below, the development he is proposing at that location,
and, I have no objections to his proposal.
DESCRIPTION AN]XOR DRANVENG OF PROPOSED DEVELOPIMENT
(To be filled in by individual proposing development)
P/L
�xtSTn�Ce,
_ E x 5T) •-4
o f R v E2
fl �
101
Ex\5TIn1G, — `P/L
A, V Vtw P, %?
------------------------------------------------------------------------------------------------------------------
Sign ure
Lir-'iDA 0vkIvr�,J
Print or Type Name
-
Date: PSI 3o za�4
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to P%cNN,i X') \�,ACNDEma's
(Name of Property. Owner)
property located at LeT 2.2, d Z 9i 4- 31 P, v RS i
(Lot, Block, Road, etc.)
on �iy. SE i,y R , in N ., Rom► - C,"Z- A�/�� C�`( , N.C.
(Waterbody) (Town and/or County)
He has described to me as shown below, the development he is proposing at that location,
and, I have no objections to his proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(To be filled in by individual proposing development)
P/L
0
�_-' x IsT»<—,
T R F. F S (4)
_ E XIST)NC-%
U
N E USrc.
Rev E�
P
W N L V-W N `� /L
------------------------------------------------------------------------------------------------------------------
Signatu e
Print or Type Name
Telephone Number
Date; -i' — 3� /:3
SECTION.1100 - GENERAL PERMIT FOR CONSTRUCTION OF BULKHEADS kND THE PLACEMENT OF
RTPRAP FOR SHORELINE PROTECTION IIY ESTUARINE AND PUBLIC TRUST WATERS
1SA NCAC 07H.1101 PURPOSE
This permit will allow the construction of bulkheads and the placement of riprap for shoreline protection in the public trust waters
and estuarine waters AECs according to authority provided in Subchapter 7J A 100 and according to the following guidelines.
This permit will not apply to shoreline protection within the ocean hazard AEC.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 1134-114;
Eff. March 1, 1984.
HA NCAC 07H.1102 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete an application form requesting approval for
development. The applicant shall provide information on site location, dimensions of the project area, and his name and address.
(b) The applicant must provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners
indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed
work. Such notice should instruct adjacent property owners to provide any comment; on the proposed
development in writing for consideration by permitting officials to the Division of+CoaFW _IM- anagement within
ten days of receipt of the notice, and. indicate that no response will be interpreted as no objection. DCM staff
will review all comments and determine, based on their relevancso the potential impacts of the proposed
project, if the proposed project can be approved by a General Permit. If DCM sari finds that the comments
are worthy of more in-depth review, the applicant will be notified that he mu--, submit an application for a
major development permit.
(c) No work shall bean until an on -site meeting is held with the applicant and appropriate Division of Coas',al Management
representative so that the proposed bulkhead alignment can be appropriately marked. Written authorization to proceed with the
proposed development maybe issued during this visit. Construction of the bulkhead or riprap stnrc;uremust be_dri vithin 90 days
of this visit or the general authorization expires and it will be necessary to re-examine the alimmenn dete —; ine if the general
authorization can be reissued.
Histor✓ Tote: Authority G.S. 113.4-107(a); 113A-107(b); 113A-113(b); 113.4-118.1; 113A-12 4;
Eff.' March 1, 1984,
Amended Eff. January 1, 1990: December 1, 1987.
15A NCAC 07H.1103 PERMIT FEE
The applicant must pay a permit fee of one hundred dollars ($100.00) by check or money order payable to the De; artment.
History lore: Authority G.S. 113.I-10 ; 113A-113(b); 113,4-118.1; 113.4-119; 113-119.1; 1:3.4_11 ';
E7 March 1, 1984;
Amended Eff. August 1, 1000; ,''larch 1, 1991.
ISA NCAC 07H .1104 GENERAL CONDITIONS
(a) This permit authorizes only the construction of bulkheads and the placement of riprap coafor.. ing to the standards herein-
(b) Individuals shall allow authorized representatives of the Department of Environment. Health. and Natraal Resources to make
periodic inspections at any time deemed necessary in order to be sure that the activity_ being performed under authority of this
general permit is in accordance with the terms and conditions prescribgd herein.
(c) Thep shall be no significant interference with navigation or use of the waters by the public by 'he existence of the bulkhead
or the riprap authorized herein.
(d) This permit will not be applicable to proposed construction where the Department has de;errs red. based on an initial rmiew
of the application- that notice and review pursuant to G.S. I I3A-119 is necessary because they are unpsolved questions
concerning the proposed activity's impact on adjoining properties or on water quality; air quality: coastal wetlands: cultural or
historic sites; wildlife; fisheries resources: or public trust tights.
(e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization.
(f) Development carried out under this permit must be consistent with all local requirements. AEC rules. and laal land use plans
current at the time of authorization.
History Note: AuthorityG.S. 113A-107(a); 113,1-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff' May 1, 1990; December 1, 1987,•
RRC Objection due to ambiguityEff. May 19, 1994;
Amended Eff. August 1, 1998,'Jult, 1, 1994.
18A NCAC 07H.110S SPECIFIC CONDITIONS
(a) This general permit is applicable only along shorelines void of wetland vegetation including match grass and wooded swamp,
or where all construction is to be accomplished landward of such vegetation.
(b) Along natural shorelines e. g. rivers, creeks. bays. sounds, etc.; bulkheads and riprap material must be positioned as follows:
(1) Bull heads must be positioned so as not to exceed more than an average distance r of Z fe--watem'-ard of the
mean high water mark or the normal water level contour, whichever is applicable. Iz no case shall the
bulkhead be positioned more than j feet waterward of the mean hieh water or normal water level contour at
any point along its alignment.
(2) Ripmp must be positioned so as not to exceed a maximum of 8 feet water -ward of the mea,, m -il watermark or
normal water level 'contour at any point along itsalignment. This location standard al -so a^.olies to riprap
proposed waterward of the existing bulkheads.
(c) Along shorelines within upland basins, canals, and ditches, bulkheads or riprap material must be positioned so as not to
exceed more than an average distance of 5 feet waterward of the mean high water mark or the normal water level contour.
whichever is applicable. In no case shall the bulkhead or riprap be positioned more than 10 feet waterward of the mean high
water or normal water level contour at any point along its alignment. For the purpose of these Rules, the Atl=dc Intracoastal
Waterway (AlWW) is considered a natural shoreline and development must occur as described in iH .110
(d) Construction authorized by this general permit Rill be limited to a maximum shoreline length of 500 fee;.
(e) All backfill material shall be obtained from an upland source.
(f) The bulkhead must be constructed, or the riprap must be in place prior to any backfilling activities.
(g) The bulkhead or riprap must be structurally tight so as to prevent seepage of baclftll materials throug_'� the structure.
(h) Rpprap material shall be free from loose dirt or any other pollutant. It must be of a size safrcient to prn zt its movement from the site by wave or current action.
(i) Riprap material must consist of clean rock or masoury materials such as but not limited to granite or broken concrete_
Materials such as tires. car bodies, scrap metal, paper products. tree limbs, wood debris, orgamic material or:i=i:armaterial- are
not considered riprap.
0) The bulkhead must be solid and constructed of treated wood, concrete slabs; metal she--: piles or other siitable materials
approved by department personnel. No excavation is pe-mitted except for that which may be required for the consmtction of the
bulkhead wall, riprap. deadmen cables, etc. 1"Es permit does not authorize any excavation watervard ofthe alignment.
(k) Bulkheads or riprap shall not extend beyond established alignments nor restrict the orig�:nal width of d- c ral or basin
(1) If one contig�rous acre or more of prope-n is to be excavated or filled, an erosion and sedimentation cons of pi�must be filed
with the Division of Land Resources, Land Quality Section, or appropriate local government hawing jurisdiction This plan must
be approved prior to commencing the land -disturbing activity.
HistoryNlote: 4uthoritvG.S. 113A-107(a); 113,1-107(b); 113A-113(b); 113.4-118.1; 113A-124;
E;if. March 1, 1984;
Amended Etf.' December 1, 1991; January 1, 1989; December 1, 1987.
History Note: 4uthoriiv G.S. 113,1-10 113,4-118.1;
Temporary Adoption Ej. October 2, 1999.