Loading...
HomeMy WebLinkAbout54687_CORRAO, ANTHONY_20100712-. ❑CAMA / ❑ DREDGE & FILL ONO V �tf• GENERAL PERMIT 44 Previous permit# ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC ❑ Rules attached. Applicant Name �� ti� ;, r .,, a r, !C tt , t; k Address. City Stated ZIP : t; Phone # () Fax # () Authorized Agent - Affected ❑ CW ❑ EW ❑ PTA ❑ ES ❑ PTS AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A ❑ PWS: ❑ FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no Project Location: County Street Address/ State Road/ Lot #(s) Subdivision CityZIP Phone # ( ) River Basin Adj. Wtr. Body (nat /man /unkn) Closest Maj. Wtr. Body Type of Project/ Activity Pier (dock) length Platform(s) Finger pier(s) (Scale: Groin length number Bulkhead/ Riprap length S3 4;s( avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other 1 4— j --- — -- ! � I Shoreline Length 4 111,Q Ll u SAV: not sure yes no Sandbags: not sure yes no ! Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: Notes/ Special Conditions — p ❑ See note on back regarding River Basin rules. Agent r Appljcant Printed Name Signature Please read compliance statemfnt on back of permit y I(h Application Fee(s) Check # PermitOfficer's Signature Issuing Date Expiration Date Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888ARCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 Adjacent Riparian Property Owner's Notification by Certified Mail - Return Receipt Requested Adjacent Riparian Property Owner: Section Number: Name: IR II c.n w / Address: Telephone Number: E-mail Address: Lot Number.- 15/ / ._ L7 I hereby certify that I own the property adjacent to: Section Number: -L'-c_ Owners I Address: Tel eplion.e'Number: E-mail Address: Lot Number. / --;Z nLi./Y)T The individual applying for this permit has described to me the scope of work as shown on the attached copy of the "Description and Drawing of Proposed Work" form. qs la,� as ct ,ddes i26 f QQ _ I have no objections to the proposed work. rYt y p 1-6 pe--yy I tC r r tC, rn. Y lfyou have objections to the work being proposed, please write the Division of Coastal Management, 400 C:ommeret Ave. Morehead City, Nl�'8557, or call 252-808-2808 within ten (I0) clays ofrecei t of this notice. No response is considered the same -as � c. ._ p 3 al„F{'.�tif)ii� ft You l`:;i`.'t' Dc:`.:r2 rFotiiiECi .iiy vzrtliiL.7 mail. understand tI at uoi;cs, pijin s, tit poles or any otlser ina.rille strLi;:iUre must be set back a ininlmum of fifteen feet ___.'_`_ i do not wish to waive the setback requirement. _..__ ___. I dG ',fish to waive the setback requirement, Adjacent Riparian Property Ovner- if�fifitifri ,y � -1 -,.,_Sd.,z=:j't..%---A...�--� Prilit Naiiie \, i r '1 r`'►_ 411.d �`' SPECIALTY CONTRACTORS 117 GIBBS RD NEW BERN, NC 28560 Y DATE WACHOvia Wachovia Bank, N.A. wachovia.com L1 G'6� C FOR II.00 10 4 LI1' i:0 5 3000 2 191: 20000 4 7 6 L 7 3 1 S"o 1041 66-21/530 BRANCH 77619 oo C'J' F.curaY ❑Feaiur.e � �leisan Adjacent Riparian Property Owner's Notification by Certified Mail - Return Receipt Requested Adjacent Riparian Property Owner: Section Number: �'--= Lot Number: 13 zhtyc? Name: %/I/_i44/v dd_ C , Gnu t-, �.., Address: Telephone Number: , SZ 2-- -D k -(q 3 E-mail Address: I�G�(Yl nC %� �f fr✓� I hereby certify that I own the property adjacent to: Section Number: ,A Lot Number: � Q� Owners Name/_22 Address: Telephone Number: E-mail Address: Eel The individual applying for this permit has described to me the scope of work as shown on the attached copy of the "Description an Drawing of Proposed Work" form. I have no objections to the proposed work. If you have objections to the work being proposed, please write the Division of Coastal Management. 400 Commerce Ave., Morehead City, NC 28557, or call 252-808-2808 within ten (10) days of receipt of this notice. No response is considered the same as "no objection" if you have been notified by certified mail. 1 understand that docks, pilings, tie poles or any other marine structure must be set back a minimum of fifteen feet (15'-0") from my riparian line unless waived by me. 1 do not wish to waive the setback requirement. I do wish to waive the setback requirement. Adjacent Riparian Propeer�ty- Owner: Signature�Yt t-L�lil.ti►1. Q Print Name ` 310 YeZ�,�-I�oµ NCDENR North Carolina De partment of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue, Govemor James H. Gregson, Director Dee Freeman, Secretary Day � Name of Property Owner Applying for Permit: I Mailing Address: I certify that I have authorized (agent' L act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) at (my property located at) This certification is valid thru (date) ' "/,ST" /'',1 cl�/o Property Owner Signature 400 Commerce Avenue, Morehead City, North Carolina 28557 /%') to NC Division of Coastal Mgt. Habitat lmpa '� C.-- Applicant: Anthony Corrao Date: 7/6/10 Permit #: 54687C Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount Open Water Dredge 13 Fill ❑ Both ❑ Other O 40 40 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-$08-2808 :: 1-888 4RCQA5` _ ac NCDENR ��1 �r,r r r 1,. 1^i: vrlf i�itn� Jt-�J C11 J1+enr o Envir'onmert ar'd, € :C:li.;i Di,lisirn '�oastai ,Vianagemenl 32ver!y =av�s ?ai :u : James H. 'regson r: Governor DIr2 �tCr -ecr�iarli BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re- established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would remove understory vegetation is allowed. Pre -project site conditions: 5. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your �jgpb o ature you agree to be held responsible for meeting all of the above listed conditions and verify that all inform 1 is com,61eteland accurate. Agent ,§r Applicant Printed ent'gr Applicant Signatu Z,_ - �. 11 Permit Off' r' Signature _� Issue Da e GENERAL PERMIT #: 5 q A / C Washington Office 943 Washington Square Mall Washington, NC 27889 Phone 252-946-6481 Morehead City Office 400 Commerce Avenue Morehead City, NC 28557 Phone 252-808-2808 One NorthCarohna Version 5, 09/2009 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper