Loading...
HomeMy WebLinkAbout53369_BURKE, MIKE_20090318D- CAMA / F-1 DREDGE & FILL 9�f kyo r. GENERAL PERMIT New' E]"dification ElComplete Reissue [-]Partial Reissue As authorized by the State of North Carolina, Department of Environment and Natural ,sources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Applicant NaTe,, 4LI L'Y-'� t Address Cityjr'!fState ZIP Phone # Fax Authorized Agent PTS Affected El CW El EW El PTA [I ES El N/A AEC(s): L1 OEA Ll HHF El 1H El UBA Ll El PWS: El FC: ORW: yes / no PNA yes / no Crit.Hab. yes no Previous permit # Date previous permit issued Rules attached. Project Location: County StreetAddress/ State Road/ Lot #(s) Subdivision City ZIP Phone # AL& Jt River Basin Adj. Wtr. Body fnatlman Junkn Closest Maj. Wtr. Body Type of Project/ Activity (Scale: Pier (dock) length Plaorm(s)__ Fintfger pier(s) Groin length number Bulkhead/ Rip,rap length 'c' avg dista ne offsh wre—`Tn 9 max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other 7 -.e 111 I -A - I# Shoreline Length '00 SAV: not sure yes no Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: Note s/ Special Conditions --T 4—� XSee note on back regarding River Basin rules. r) Agent or Applicant Printed Name Signature Please read compliance statement on back of permit** l fir/ 7,1, Application Fee(s) Check # Local Expiration Date Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar- Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Mailing Address: 400 Commerce Ave 1638 Mail Service Center Morehead City, NC 28557 Raleigh, NC 27699-1638 252-808-2868/ 1-888ARCOAST Location: Fax: 252-247-3330 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax: 919-733-1495 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 MAR-12-2009 03:01P FROM:FOLEY&FOLEY 2526363127 TO:2473330 P.1 Foley & Foley Contractors, Inc. 1810 Old Airport Rd. New Bern, NC 28562 Phone: 252-229-6467 Fax: 252-636-3127 Send To: Form: Brad pan Foley Attention: Date: March 12, 2009 ROW Mlke Burka Fax Number Phone Number 636-25151229-6467 Total Pages, including cover sheet: 3 meats: Brad, This in the property stuff you looked at for me yesterday in New Bern. Both sides of Mr. Burke are owned by Mr. Skinner. Thank You Dan Sign Riparian Statement Certify Authorized Form MAR-12-2009 03:01P FROM:FOLEY&FOLEY 2526363127 TO:2473330 P.2 North Carolina Department of Environment Resources Division of Coastal Management Charles S. Jones, Director Mlehael F. Easley, Govemor Date March 12 2009 Applicant Name Mike Burke Mailing Address,_ 504 Harbor Dr New Bern. kLQ 28560 I certify that I have authorized (agent)_FoleYContractors, LLC to act on my behalf, for purpose of applying for and obtaining all CAMA Permits necessary to install of construct (activity) Bulkhead at (location} ame This certification is valid thru (date) A — 0 William G. Rose In, Secretary ,,Vej1ue, Morehead City, North Carolina 28557 1111df/,e, �52-247-3330/Tnternet: po CZS05I a 2'g�S MAR-12-2009 03:01P FROM:FOLEY&FOLEY . 2526363127 T0:2473330 P.3 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (Bulkhead/rip ran) I hereby certify that I own property adjacent to y M , L? ,A&k % is (Name of Property Owner) Property located (lot, block, 'road, on NEu &964 L'A3 N.C. ,_...�. (Water body) (Town and/or County) . He has described to me as shown below, the development he is proposing at the location, and, I have no objections to his pioposai. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPM (to be filled In by individual proposing development) vl4 ► VV W (Applicant Information) (Riparian Property Owner Information) 1 0 i2 A Ig i ��� d/ /1J ��J sor 2> City/stawzip Print or Type Name 919 - 9-1 k- %-) - s'2_— -? (- - --'Q / 7 Telephone Number Telephone Number 3w /a�o9' Z-/a -65 Date Date Foley & Foley Contractors, Inc 252-636-2515 252-636-3127 Fax FOLEY CONTRACTORS LLC 12-08 257 IRELAND RD 1 �� 66-30/5312 BAYBORO, NC 28515 DATE i � aQd � PTO THE AY L— , C �C•� ORDER OF �� _ � //v `mod DOLLARS �=k v/v h h ®First Citizens _ -- - Bankitizens o For u■00 L L08n■ i:0 S 3 L00 300':00 L L L 2L S S96011' ❑ For vertical shoreline stabilization projects (bulkhead) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward from the structure may be maintained as a stable lawn in order to provide for structural stability. This certificate condition is intended to apply only to projects adjacent to larger water bodies where the conditions may routinely produce severe overwash. o Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored, see the first condition of this authorization. ❑ When restoration is required Please submit a project map of your property indicating the area to be restored, and a restoration plan. The DWQ website (Helpful links), http://h2o.enr.state.nc.us/ncwetiands/RiparianBufferRules.htm may be helpful in the preparation of the restoration plan. This Buffer Authorization is not considered approved until the DWQ has received both this signed form AND the project map. Submit the requested information to: Division of Water Quality Attn: Surface Water/Buffer Program 943 Washington Square Mall Washington, NC 27889 By your signature below you agree to be held responsible for meeting ALL of the above listed conditions and verify that all information is complete and accurate. Only the property owner is responsible for the second condition. Please be aware, violations of the above -listed conditions are subject to civil penalty assessment of up to twenty-five thousand dollars ($25,000) per violation per day. =1 Applicant/Agent's Signature CAMA General Permit Number: North Carolina Division of Water Quality Internet: www.ncwaterquality.org 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper M Date ne NorthCarolina Natmallff William G. Ross Jr., Secretary (North Carolina Department of Environment and Natural Resources { Q", —I Coleen H. Sullins, Director Chuck Wakild, Deputy Director BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar - Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 0213.0233 & .0259. Activities covered by your Coastal Area Management Act (CAMA) permit are deemed to have a Buffer Authorization from the DWQ only if the project can meet ALL of the conditions listed below. If ALL the avoidance and minimization guidelines described below cannot be met, a separate buffer authorization request must be submitted using a Pre -Construction Notification (PCN) application to DWQ at the address below. A PCN application may be obtained on the DWQ web site http://h2o.enr.state.nc.us/wetlands.htm1. Questions regarding this process should be directed to wetland/buffer staff of the DWQ in the Washington Regional Office at 252-946-6481, or the 401 Oversight Unit in the Raleigh Central Office at 919-733-6893. A written authorization from DWQ MUST be received prior to any construction activities in the riparian buffer, including land clearing. Failure to secure a Buffer Authorization prior to construction &/or land clearing shall subject the property owner & the party (contractor) performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per violation. ❑ Minimize removal of woody vegetation in Zone 1 to what MUST be removed for the installation of the shoreline stabilization project. Zone 1 begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward. Unnecessary clearing is a violation of the riparian buffer rules and may result in a civil penalty assessment of up to $25,000 per day per violation. ❑ The property owner is responsible for site restoration of woody vegetation. Pre -project site conditions MUST be re-established. A site that was wooded prior to this shoreline stabilization project MUST be restored with native hardwood trees at a stem density of 320 trees per acre. Hardwood restoration must be completed by the first subsequent planting season (November 1 through March 30). ❑ Disturbance in Zone 2 of the riparian buffer, which begins at the landward edge of Zone 1 and extends 20 feet is restricted to uses listed under 15A NCAC 2B .0233(4)(b) & (6), and 15A NCAC 2B.0259(4)(b) & (6). Clearing and grading of Zone 2 is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused flow of storm water runoff through Zone 1. North Carolina pivision of Water Quality Internet: www.ncwaterquality.org One 943 Washington Square Mall Phone: 252-946-6481 NorthCarohna Washington, NC 27889 FAX 252-946-9215 vVatura!!y An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper