HomeMy WebLinkAbout57003_BREWER, BRENT_20101206" �►ZiO�/Di��
�❑ CAMA / ❑ DREDGE & FILL
-.f PERMIT lV V GENERAL R M I T Previous permit #
❑New ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
Rules attached.
Applicant Name
Address I -
City State ZIP
Phone # ( ) Fax # ()
Authorized Agent
❑ Cw
❑ EW ❑ PTA
Affected
ElOEA
ElHHF ElIH
AEC(s):
❑ PWS:
❑ FC:
ORW:
yes / no
PNA yes
❑ ES ❑ PTS
❑ UBA ❑ N/A
Crit.Hab. yes / no
Project Location: County
Street Address/ State Road/ Lot #(s)
Subdivision
l'
City.::.P �cr ��. ZIP u 5
Phone # River Basin
Adj. Wtr. Body ate^ t �i ~ (hat /man /unkn)
Closest Maj. Wtr. Body'
■■■■
■■■■■■■N
■■■■■.■■■■■■■■■■■ail■
ME
ME
■■■
■■
�
t^I
■■101
■�■W
■■■■■■■■■■aMMEn■
■til■■■■1■■■f1■■■■■■■■■■■■■■■■■■■■■■
NE■■
EM
,�l■■■mil■■■■:!■■■■■■■■■■■■■■■■■■■r��■
■■■■■�:
�l■■■ala■■■!
a■■■■■■■■���e■■■■■■■■■
■■■■■■Il■■■■!■■■1■■■■■■■■■■■■■■■■■■■■■■
■■■■■■Mil■■■■■■■!i!1■■■■■■■■■■■■■■■■■■■■■■
M.
.... _ - - I■ �■I■�■■1�1i■■lllll�lr�■■.11�■..:=,_�!��■C+I■■■■■■■■■■
Agent or Applicant Printed Name
Signature ** Please read compliance statement on back of permit **
Permit Officer's Signature
�j6/12
Issuing Date Expiration Date
Application Fee(s) Check # Local Planning Jurisdiction Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowners).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar- Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
Morehead Citv Headauarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ I-888-4RCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue James H. Gregson Dee Freeman
Governor Director Secretary
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259.
The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of
W:ter Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies
with the aforementioned regulations, and made a "no practical alternatives" determination per those
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer
Authorization as long as the project is constructed in a manner that continues to meet all of the conditions
listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party
(contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per
violation.
7. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 dagrees) unless otherwise approved by DCM.
'The alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of
pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules
to the maximum extent practicable.
s. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way.
This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the conditions listed above and
verify that all information provided is complete and accurate.
Age® `ppli Printed Name Permit Offid's Signature
nt or Applicanf'�$ignature
CAMA GENERAL PERMIT #: 1� %OQ S C-
Washington Office
Morehead City Office
943 Washington Square Mall
400 Commerce Avenue
Washington, NC 27889
Morehead City, NC 28557
Phone 252-946-6481
Phone 252-808-2808
Ito
Issue Date
An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper
Version 5, 0912009
NC®ENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue Jnmes H. Gregson Dee Freeman
Governor Director Secretary
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 026.0233 & .0259.
The Division of Coastal Management (DGM), through a Memorandum of Understanding with the Division of
Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies
with the aforementioned regulations, and made a "no practical alternatives" determination per those
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer
Authorization as long as the project is constructed in a manner that continues to meet all of the conditions
listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party
(contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per
violation.
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM.
The alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of
pervious materials like op3n-slatted wood or composite, mulch, or grass to meet the intent of the rules
to the maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way.
This drawing will be used to aid in compliance and monitoring efforts.
By your signature below y,-)u agree to be held responsible for meeting all of the conditions listed above and
verify that all information provided is complete and accurate.
c
Agentplican ri ed Name Permit Offi is Signature
Agent o Applica Signature
CAMA GENERAL PERMIT ##:
Washington Office
943 Washington Square Mall
Washington, NC 27889
Phone 252-946-6481
S�1ao3C
Morehead City Office
400 Commerce Avenue
Morehead City, NC 28557
Phone 252-808-2808
iz4ll0
Issue Date
An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper
Version 5, 0912009
NC Division of Coastal Mgt. Habitat Impact Computer SPIT -
Applicant: Brent Brewer
Date: 12/6/10
Permit #: 57003C
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount
Open Water
Dredge 13 Fill ❑ Both ❑ Other El
1446
1446
Dredge ❑ Fill 0 Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised:02/03/10
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
r (FOR A PIER/MOORING PILINGSIBOATLIFT/BOATHOUSE)
I hereby certify that I own property adjacent to
(Name of Property Owner)
property located ate"��
(Lot, Block, Road a c.) /
on /17f C.Cf��� , in9e���`G�C'�/ ����/ N.C.
(Waterbody) (Town and/or County)
He has described to me, as shown below, the development he is proposing at that locaticn,
and, I have no objections to his proposal. I understand that a pier/mooring pilings/boatlift/boathouse
must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless
waived by me. "Ve,
I do not wish to waive the setback requirement. NOV 19 2010
I do wish to waive that setback requirement. , M0ht®0drffYJDCKt-
---------------------------------------------------------------------------------------------------------------
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
l.r--- - ----------------------------
(Applicant Information)
Mailing Address
City/State/Zip
Telephone Ntunber
/(
Date AW-1
T�
--------------------------------------------------------
(Rip rian Property Owner Information)
Signature
-D4,o1 e,4yL
Print or Type Name
'= z-633-�_� 9f
Telephone Number
Date
CERTIFIED MAIL • RETURN RECEIPT REQUESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NPTIFICATIO AIVER FORM
Name of Individual applying for Permit:-J��iIT 7��'z,
Address of Prop
(Lot or Street #, Street or Road, City & County)
I hereby certify that I own property adjacent to the above referenced property. The individual
applying for this permit has described to me as shown on the attached drawing the development
they are proposing. A description or drawing, with dimensions, should be provided with this letter.
y I have no objections to this proposal.
If you have objections to what is being proposed, please write the Division of Coastal
Management, 400 Commerce Avenue, Morehead City, NC, 28557 orcall (252) 808-2808 within
10 days of receipt of this notice. No response is considered the same as no objection if you
have been notified by Certified Mail.
WAIVER SECTION w
w
NOV 19 2010
I understand that a pier, dock, mooring pilings, breakwater, boathouse, boatlift or sandbags must
be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If
you wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
X I do not wish to waive the 15' setback requirement.
(Applicant Information)
Mailing Address
City/State/Zip
Telephone Number
/` A` i /l
Date
(Riparian Property Owner Information)
Signature
,C 14;1Ca12 �a'rr�s Gl�L�DG
Print or Type Name
Telephone Number
Date
i
6 /
r
It 3�
50'RiparianBuHe
NWL
50' Neuse Riparlan Buffer --
75' AEC -- =— —
404 Wetlands
Coastal Marsh
SE RIV
r7J j7
�r
80' AIWW Setback
NOTE:
128.SS' MNEM FEET OF S1 OBELJNB %4' SO. R. • 614.16 SO. FT, ALLOWED
Note: This Is Not An Engineered Drawing
For Environmental Permitting Only
TMS-P M b 4ED ON gIXiIN.1L
OSA4ANOS — SORJ6Y
INFO—n. FSON:
McKlm & Creed
-•--- FGLSNwE R/JffATNxI
LMGw 6 Gawa Pxnd
NAGEMENT G0.0NP — APdkxnC
Enoironmenrul Canwlranr,
POM Del¢ Box 2522 T]":
In,V'. North C..R. 28402 GQIERAL PESNIT &TE PIAN
�
N
°o
D
GYv
tilAO NA
,+zor 620T-023
Y• FWs
GSF 2•r2
DOCK PROPOSAL
LOCATION: 149 WATERWAY DRIVE
ADAMS CREEK, NC
OWNER: P. BRENT & LISA V. BREWER
A14��
0
1 9
No
19 2010
@wedDem
A"
1
%%,' lxemft N"'
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
• (FOR A PIER/MOORING PILINGSIBOATLIFT/BOATHOUSE)
NOV L ��`i�G�
� � wj I�eby certify that I own property adjacent to s
W0f60CdCffypCM (Name of Property Owner)
ro ert located atG r .2 S�i�� . z';�"T�%/Gi //�
p P Y _ �%� •
(Lot, Block, Road e c.)
on /,l j C.�I-L-,� , i n 9�E���C',� C!�/��/C N.C.
(Waterbody) (Town and/or County)
He has described to me, as shown below, the development he is proposing at that location,
and, I have no objections to his proposal. I understand that a pier/mooring pilings�boatlift/boathouse
must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless
waived by me. A
I do not wish to waive the setback requirement.
I do wish to waive that setback requirement. C�
---------------------------------------------------------------------------------------------------
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
pir itqeve ootttettt
-1------------------------------
(Applicant Information))
Mailin Address
City/State/Zip
Clr.5ih Ty
�J
01
----------------------------------------------------------------------------------
(Riparian Proper, cr Infor on)
Signature
G l'e,
Print or Type Name
Telephone Number
Date
TeleD t ne Number
Date
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue, Governor James H. Gregson, Director Dee Freeman, Secretary
Date
Applicant Name
Mailing Address
,%'
I certify that I have authorized (agent) �� to act on my
behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to
install or construct (activity)C�
at (location)
This certifi
Signature
Oxr&a-c-f �Pvry
�*V'c C4�
��1�� � Nov 2010
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalm'anagement.net
An Equal Opportunity \ Affirmalive Action Employer — 50% Recycled \ 10% Post Consumer Paper
14
20 1
m
`jq jjao
�t
BLTBAB LLC o9-10
221 TICINO CT.
NEW BERN, NC 28562-8989
I
k--C�7
$
Bank of America
ACH RfT 053000196
':053000196,:
23?0211,159391I1101a
1110,11"Cl-,
'I"
1018
66-19/530 NC
3100
f
I
FA-
Z-14
4
.f
NO
CERTIFIED MAIL • RETURN RECEIPT REQUESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OW
Name of Individual applying for Permit:
Address of Property:
4we<�- 'W' S-i?2' =
OTIFIC ION/VVAIVER FORM
7-y
(Lot or Street #, Street or Road, City & County)
I hereby certify that I own property adjacent to the above referenced property. The individual
applying for this permit has described to me as shown on the attached drawing the development
they are proposing. A description or drawing, with dimensions, should be provided with this letter.
1. I have no objections to this proposal.
If you have objections to what is being proposed, please write the Division of Coastal
Management, 400 Commerce Avenue, Morehead City, NC, 28557 orcall (252) 808-2808 within
10 days of receipt of this notice. No response is considered the same as no objection if you
have been notified by Certified Mail.
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, boatlift or sandbags must
be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If
you wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Applicant Information)
Mailing Addreas
Cit /state/Zip
Telephone Number
Date
r Information)
Print or Type Name
�—W- �7S
Telephone Number
Date
0
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(FOR A PIER/VIOORING PILINGSIBOATLIFTIBOATHOUS )
?ECEIVEI),
I hereby certify that I own property adjacent to s
(Name of Property Owner) °"' "dCIIY0UU
property located at
(Lot, Block, Road, etc.
on �/�� in .N/��%G/� GIN LG , N.C.
(Waterbody) (Town and/or County)
He has described to me, as shown below, the development he is proposing at that location,
and, I have no objections to his proposal. I understand that a pier/mooring pilings/boatlift/boathouse
must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless
waived by me.
I do not wish to waive the setback requirement.
I do wish to waive that setback requirement.
-------------------------------------------------------------------------------------------------------------------
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To be filled in by individual proposing development)
10,
(Applicant Information)
Mailing Addr s
City/State/Zip
L,2�z��yi
Telephone Number
ate
------------------------------------------------------------------------
(Riparian Property Owner Information)
oo
Signature
Print or Type Name
'7 n 1
Telephone Number
Date
er it o.: er itType:
57003c General
149 Waterway Dr.
Isp ate: RepsNa e:
2/3/2011 Davenport
Dock
Dock complete.
Violation District:
- MHCDO
Printed On: Thursday, February 03, 2011
Brewer, Brent
InspType:
Monitoring
Township:
Harlow
RecordIQ:5981
County Name:
Craven