Loading...
HomeMy WebLinkAbout57003_BREWER, BRENT_20101206" �►ZiO�/Di�� �❑ CAMA / ❑ DREDGE & FILL -.f PERMIT lV V GENERAL R M I T Previous permit # ❑New ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Rules attached. Applicant Name Address I - City State ZIP Phone # ( ) Fax # () Authorized Agent ❑ Cw ❑ EW ❑ PTA Affected ElOEA ElHHF ElIH AEC(s): ❑ PWS: ❑ FC: ORW: yes / no PNA yes ❑ ES ❑ PTS ❑ UBA ❑ N/A Crit.Hab. yes / no Project Location: County Street Address/ State Road/ Lot #(s) Subdivision l' City.::.P �cr ��. ZIP u 5 Phone # River Basin Adj. Wtr. Body ate^ t �i ~ (hat /man /unkn) Closest Maj. Wtr. Body' ■■■■ ■■■■■■■N ■■■■■.■■■■■■■■■■■ail■ ME ME ■■■ ■■ � t^I ■■101 ■�■W ■■■■■■■■■■aMMEn■ ■til■■■■1■■■f1■■■■■■■■■■■■■■■■■■■■■■ NE■■ EM ,�l■■■mil■■■■:!■■■■■■■■■■■■■■■■■■■r��■ ■■■■■�: �l■■■ala■■■! a■■■■■■■■���e■■■■■■■■■ ■■■■■■Il■■■■!■■■1■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■Mil■■■■■■■!i!1■■■■■■■■■■■■■■■■■■■■■■ M. .... _ - - I■ �■I■�■■1�1i■■lllll�lr�■■.11�■..:=,_�!��■C+I■■■■■■■■■■ Agent or Applicant Printed Name Signature ** Please read compliance statement on back of permit ** Permit Officer's Signature �j6/12 Issuing Date Expiration Date Application Fee(s) Check # Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowners). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar- Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead Citv Headauarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ I-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue James H. Gregson Dee Freeman Governor Director Secretary BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of W:ter Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 7. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 dagrees) unless otherwise approved by DCM. 'The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. s. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify that all information provided is complete and accurate. Age® `ppli Printed Name Permit Offid's Signature nt or Applicanf'�$ignature CAMA GENERAL PERMIT #: 1� %OQ S C- Washington Office Morehead City Office 943 Washington Square Mall 400 Commerce Avenue Washington, NC 27889 Morehead City, NC 28557 Phone 252-946-6481 Phone 252-808-2808 Ito Issue Date An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper Version 5, 0912009 NC®ENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue Jnmes H. Gregson Dee Freeman Governor Director Secretary BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 026.0233 & .0259. The Division of Coastal Management (DGM), through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like op3n-slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. By your signature below y,-)u agree to be held responsible for meeting all of the conditions listed above and verify that all information provided is complete and accurate. c Agentplican ri ed Name Permit Offi is Signature Agent o Applica Signature CAMA GENERAL PERMIT ##: Washington Office 943 Washington Square Mall Washington, NC 27889 Phone 252-946-6481 S�1ao3C Morehead City Office 400 Commerce Avenue Morehead City, NC 28557 Phone 252-808-2808 iz4ll0 Issue Date An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper Version 5, 0912009 NC Division of Coastal Mgt. Habitat Impact Computer SPIT - Applicant: Brent Brewer Date: 12/6/10 Permit #: 57003C Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount Open Water Dredge 13 Fill ❑ Both ❑ Other El 1446 1446 Dredge ❑ Fill 0 Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised:02/03/10 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT r (FOR A PIER/MOORING PILINGSIBOATLIFT/BOATHOUSE) I hereby certify that I own property adjacent to (Name of Property Owner) property located ate"�� (Lot, Block, Road a c.) / on /17f C.Cf��� , in9e���`G�C'�/ ����/ N.C. (Waterbody) (Town and/or County) He has described to me, as shown below, the development he is proposing at that locaticn, and, I have no objections to his proposal. I understand that a pier/mooring pilings/boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. "Ve, I do not wish to waive the setback requirement. NOV 19 2010 I do wish to waive that setback requirement. , M0ht®0drffYJDCKt- --------------------------------------------------------------------------------------------------------------- DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: l.r--- - ---------------------------- (Applicant Information) Mailing Address City/State/Zip Telephone Ntunber /( Date AW-1 T� -------------------------------------------------------- (Rip rian Property Owner Information) Signature -D4,o1 e,4yL Print or Type Name '= z-633-�_� 9f Telephone Number Date CERTIFIED MAIL • RETURN RECEIPT REQUESTED DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NPTIFICATIO AIVER FORM Name of Individual applying for Permit:-J��iIT 7��'z, Address of Prop (Lot or Street #, Street or Road, City & County) I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me as shown on the attached drawing the development they are proposing. A description or drawing, with dimensions, should be provided with this letter. y I have no objections to this proposal. If you have objections to what is being proposed, please write the Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC, 28557 orcall (252) 808-2808 within 10 days of receipt of this notice. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION w w NOV 19 2010 I understand that a pier, dock, mooring pilings, breakwater, boathouse, boatlift or sandbags must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. X I do not wish to waive the 15' setback requirement. (Applicant Information) Mailing Address City/State/Zip Telephone Number /` A` i /l Date (Riparian Property Owner Information) Signature ,C 14;1Ca12 �a'rr�s Gl�L�DG Print or Type Name Telephone Number Date i 6 / r It 3� 50'RiparianBuHe NWL 50' Neuse Riparlan Buffer -- 75' AEC -- =— — 404 Wetlands Coastal Marsh SE RIV r7J j7 �r 80' AIWW Setback NOTE: 128.SS' MNEM FEET OF S1 OBELJNB %4' SO. R. • 614.16 SO. FT, ALLOWED Note: This Is Not An Engineered Drawing For Environmental Permitting Only TMS-P M b 4ED ON gIXiIN.1L OSA4ANOS — SORJ6Y INFO—n. FSON: McKlm & Creed -•--- FGLSNwE R/JffATNxI LMGw 6 Gawa Pxnd NAGEMENT G0.0NP — APdkxnC Enoironmenrul Canwlranr, POM Del¢ Box 2522 T]": In,V'. North C..R. 28402 GQIERAL PESNIT &TE PIAN � N °o D GYv tilAO NA ,+zor 620T-023 Y• FWs GSF 2•r2 DOCK PROPOSAL LOCATION: 149 WATERWAY DRIVE ADAMS CREEK, NC OWNER: P. BRENT & LISA V. BREWER A14�� 0 1 9 No 19 2010 @wedDem A" 1 %%,' lxemft N"' ADJACENT RIPARIAN PROPERTY OWNER STATEMENT • (FOR A PIER/MOORING PILINGSIBOATLIFT/BOATHOUSE) NOV L ��`i�G� � � wj I�eby certify that I own property adjacent to s W0f60CdCffypCM (Name of Property Owner) ro ert located atG r .2 S�i�� . z';�"T�%/Gi //� p P Y _ �%� • (Lot, Block, Road e c.) on /,l j C.�I-L-,� , i n 9�E���C',� C!�/��/C N.C. (Waterbody) (Town and/or County) He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings�boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. A I do not wish to waive the setback requirement. I do wish to waive that setback requirement. C� --------------------------------------------------------------------------------------------------- DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: pir itqeve ootttettt -1------------------------------ (Applicant Information)) Mailin Address City/State/Zip Clr.5ih Ty �J 01 ---------------------------------------------------------------------------------- (Riparian Proper, cr Infor on) Signature G l'e, Print or Type Name Telephone Number Date TeleD t ne Number Date NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue, Governor James H. Gregson, Director Dee Freeman, Secretary Date Applicant Name Mailing Address ,%' I certify that I have authorized (agent) �� to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity)C� at (location) This certifi Signature Oxr&a-c-f �Pvry �*V'c C4� ��1�� � Nov 2010 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalm'anagement.net An Equal Opportunity \ Affirmalive Action Employer — 50% Recycled \ 10% Post Consumer Paper 14 20 1 m `jq jjao �t BLTBAB LLC o9-10 221 TICINO CT. NEW BERN, NC 28562-8989 I k--C�7 $ Bank of America ACH RfT 053000196 ':053000196,: 23?0211,159391I1101a 1110,11"Cl-, 'I" 1018 66-19/530 NC 3100 f I FA- Z-14 4 .f NO CERTIFIED MAIL • RETURN RECEIPT REQUESTED DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OW Name of Individual applying for Permit: Address of Property: 4we<�- 'W' S-i?2' = OTIFIC ION/VVAIVER FORM 7-y (Lot or Street #, Street or Road, City & County) I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me as shown on the attached drawing the development they are proposing. A description or drawing, with dimensions, should be provided with this letter. 1. I have no objections to this proposal. If you have objections to what is being proposed, please write the Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC, 28557 orcall (252) 808-2808 within 10 days of receipt of this notice. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, boatlift or sandbags must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Applicant Information) Mailing Addreas Cit /state/Zip Telephone Number Date r Information) Print or Type Name �—W- �7S Telephone Number Date 0 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A PIER/VIOORING PILINGSIBOATLIFTIBOATHOUS ) ?ECEIVEI), I hereby certify that I own property adjacent to s (Name of Property Owner) °"' "dCIIY0UU property located at (Lot, Block, Road, etc. on �/�� in .N/��%G/� GIN LG , N.C. (Waterbody) (Town and/or County) He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings/boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. I do not wish to waive the setback requirement. I do wish to waive that setback requirement. ------------------------------------------------------------------------------------------------------------------- DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (To be filled in by individual proposing development) 10, (Applicant Information) Mailing Addr s City/State/Zip L,2�z��yi Telephone Number ate ------------------------------------------------------------------------ (Riparian Property Owner Information) oo Signature Print or Type Name '7 n 1 Telephone Number Date er it o.: er itType: 57003c General 149 Waterway Dr. Isp ate: RepsNa e: 2/3/2011 Davenport Dock Dock complete. Violation District: - MHCDO Printed On: Thursday, February 03, 2011 Brewer, Brent InspType: Monitoring Township: Harlow RecordIQ:5981 County Name: Craven