Loading...
HomeMy WebLinkAbout100322C - Davis Motloop signature verification: CAMA (__� DREDGE & FILL N9 100322 A 13( � E N E RA L PERMIT Previous permit -`�---- Date previous permit issued ew ❑Modification ❑Complete Reissue ❑Partial Reissue As authorized b he Slta�teiof-No Caro ,Department of Environmental Quality and the astal Resources Commission in an area of environmental concern pursuant to: 15A NCAC /;- 1 t� ` �_.,_.. F]Rules attached. General Permit Rules available at the following link:www•deq.nc,Yoy/CAMAngles Applicant Authorized Agent Ad Project t Project Location(County): City[;_. State ZIP Street Address/state Lot#(s) Phone# ) _ _? o`er` Email Subdivis n City ZIP Affected nCW ❑EW PTA ES U PTS Adj.Wtr.Body..-.... (nat/manjunk) AEC(s): OEA IHA UW �SPIMA PWS Closest Mal.Wtr.Body JZ4A94— — ORW:yes/ PNA:yes �e Type of Project/Activity / (Scale: j, Shoreline length_ Access Length Pier(dock)length .----. f Fixed Platform(s) ��-•���� lJ 1 w��✓✓ Floating Platform s).•---. Finger pier(s) Total Platform area'�"ti h/p '✓ r Bulk a Riprap length Avg distance offshore d J Breakwater/Sill '------- Max distance/length Basin,channel Cubic yards Boat ram "' Boathouse/Boatliftt r Beach B Id zi 1 g �� 1 Other SAV observed: yes Moratorium: n/a yes Site Photos: yes n Riparian Waiver Attached: yes no A building permit/zo ing p rmit may be equire b Permit nditions : TARJPAM/NEUSE/BUFFER(circle one) Co � �__ See note on back regarding River Basin rules _..__....._........ ..._................................_......_...............__ _ _..._....._...... See additional notes/conditions on back 1 A ARE OF STATLITES CRC ItU4ES AND CON US THAT APPLY TO THIS PROJECT AND REVIEi#EJD CO NCE ENT. Plea Initial) donoopveNfied _ Permit0 c ' P D am M EST ZZEH-TOEM-0UUC-RFM8 _ Rna ure 11a reacl compliance statement on back of per m't • Si nature lie, Application Fee(s) h ck M/ ey Order Iss ing at Expiration Date `°"`14, CAMA ❑ DREDGE & FILL N9 100322 A YOD 6 Previous permit E N E RAL PERMIT -- y Date previous permit issued ew ❑Modification ❑Complete Reissue ❑Partial Reissue As authorized b he state No h(C�aroo'' a,Department of Environmental Quality and the C astal Resources Commission in an area of environmental concern pursuant to: 15A NCAC� r ` c 1� ►► / ❑Rules attached. General Permit Rules available at the following link:www.dgg.nc.gov/CAMArules Applicant a Authorized Agent Add r Project Location(County): City State ZIP Street Addr ss/S to /Lott#(s) 4 in Phone# ) ��� Email Subdivis n09 City ZIP ZAW') Affected ❑CW ❑EW ❑PTA ES ❑PTS Adj.Wtr.Body (nat/man/unk) AEC(s): OEA ❑IHA ❑UUW� SPIMA ❑PWS Closest Maj.Wtr.Body ORW:yes/ PNA:yes/n0 1 Type of Project/Activity �L/ (Scale:X �►r Shoreline Length Access Length Pier(dock)length Fixed Platform(s) Floating Platform s►�� Finger pier(s) Total Platform area------*, / I dVRiprap length Avg distance offshore JIle Breakwater/Sill Max distance/length Basin,channel Cubic yards Boat ramp Boathouse/Boatlift Beach BuIldoziag Other SAV observed: yes Moratorium: n/a yes Site Photos: yes n Riparian Waiver Attached: yes no oAll A A building permit/zoning permit may,be equire by: Permit Conditions ❑TAR/PAM/NEUSE/BUFFER(circle one) ❑ See note on back regarding River Basin rules ❑ See additional notes/conditions on back I ANJAWARE OF STATtJTES,CRC FUIIES AND CONqnVNS THAT APPLY TO THIS PROJECT AND REVIE CO NCE ENT. Plea Initial) Alert 97—AlJpFica PRINTED Name Permit O 'c P D am Sign ture**PI read compliance statement on back of per m�t * Si nature �./ Application Feels) th ck#/ ney Order Issuing Satl Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: F� Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax:252-247-3330 252-946-6481 (Serves:Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S.Griffin St.Ste.300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie,Camden,Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ��catsru ,'' C, D ❑CAMA El DREDGE & FILL N .Q 100322 A B GENERAL PERMIT Previous permit Date previous permit issued ❑New [:]Modification [-]Complete Reissue ❑Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the C astal Resources Commission in an area of environmental concern pursuant to: 1 SA NCAC } , ❑Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name A Authorized Agent �r Address Project Location(County): I L� City �t �A State ZIP Street Address/$ to Road/Lot#(s) Phone# Email Subdivisjgn City 11 ZIP Affected ❑CW ❑EW PTA ES ❑PTS Adj.Wtr.Body (nat/man/unk) AEC(s): ❑OEA ❑IHA E1 U�W� SPIMA ❑PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yesA�b ' J Type of Project/Activity (Scale:/ Shoreline Length Access Length l Pier(dock)length Fixed Platform(s) Floating Platform(s) Finger pier(s) Total Platform area f Groin.length/k —^ Bulkhead/Riprap length t Avg distance offshore Breakwater/Sill ''/ Max distance/length Basin,channel Cubic yards {.i r�y Boat ramp 11 Boathouse/Boatlift Beach W g Other �_ll SAV observed: yes Moratorium: n/a yes o Site Photos: yes no Riparian Waiver Attached: yes no,. A building permit/zoning permit may be,require by: 1. l.' 'L L/ Permit Conditions - ❑TAR/PAM/NEUSE/BUFFER(circle one) i j ❑ See note on back regarding River Basin rules J El See additional notes/conditions on back 1 AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. Please Initial) 7 Agent or App ica PRINTED Name - Permit Officer's P TED NamE/'�' Sign ture**Please read compliance statement on back of perm't** Si nature c � � � Application Fee(s) Check#/ ney order Issuing Dat4 Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: 1-1 Tar- Pamlico River Basin Buffer Rules F-1 Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves:Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S.Griffin St.Ste.300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie,Camden,Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ❑CAMA ❑ DREDGE & FILL N9 100322 A B , c D PreviGENERAL PERMIT Date r permit Date previous permit issued ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: 15A NCAC ❑Rules attached. Q General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#(_) Email Subdivision City ZIP Affected ❑cW ❑EW ❑PTA ES ❑P7S Adj.Wtr.Body (Hallman/unk) AEC(s): ❑OEA ❑IHA ❑UW LJ SPIMA ❑PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/+fib Type of Project/Activity (Scale: — )/ Shoreline Length Access Length - -1 Pier(dock)length FixedPlatform(s) �.. . .-,...__...._.-E. .._.... . ............... G......... ....;. ... T-i Floating Platform(s) Finger pier(s) .... .......... L......... s Total Platform area Groin length/# I00' a Bulkhead/Riprap length ........... - k._..- - .._. 0, - - Avg distance offshore �i t Breakwater/Sill J Max distance/length Basin,channel Cubic yards i_�__ Boat ramp Boathouse/Boatlift Beach Bulldozing TV~r I Other ` SAV observed: yes no Moratorium: n/a yes no Site Photos: yes no __..�. �.__ .._... - ._ _-- — _ _ . -_. __...._. _..,..__ f.__.. ._._-__..— - __ _ Riparian Waiver Attached: yes no./ A building permit/zoning permit may be required by: Permit Conditions ❑TAR/PAM/NEUSE/BUFFER(circle one) ❑ See note on back regarding River Basin rules ❑ See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature"Please read compliance statement on back of permit" Si nature / J 'I Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: F-1 Tar- Pamlico River Basin Buffer Rules F-1 Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax:252-247-3330 252-946-6481 (Serves:Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S.Griffin St.Ste.300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie,Camden,Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: Address of Property: 641 r o �U`f'( U Mailing Address of Owner: 'S /} Owner's email: U212 wn is P o e#: 2 77— / ,5�a',2, Agent's Name: Agent Phone#: Agent's Email: ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing with dimensions, must be provided with this letter. i I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be mr iled tc-A00 Cornmmerca A'da.,MO aiiao'v City, NC 28557.DCM representatives can also be contacted at(252) 808-2808. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign the appropriate blank below.) I DO wish to waive some/all of the 15' setb k i r of Adjacent Riparian Property Owner -O R- I do not wish to waive the 15' setback requirement (initial the blank) Signature of Adjacent Riparian Property Owner: Typed/Printed name ofARPO: lad o Mailing Address of ARPO: 0 6L All� ARPO's emailJa'1 � !'ak ARPO's Phone#: Date: Jht *waiver is valid for.uo to.ppelyQ t�pm ARPO's Signature* �h-((�CI�rCC VV ��`` Revised July 2021 �c O C t 3 0 2024 DCM-MHD CITY TIPS FOR ADJACENT RIPARIAN OWNER NOTIFICATION &WAIVER FORMS CAMA Regulations require notice of proposed development to the Adjacent Riparian Property Owners(15A NCAC 710204(b)(5)). Proof of actual notice (a sign-off by the owner on this form) or certified mail return receipts (showing delivery of notice) are needed. The purpose of this notice is to make adjacent riparian property owners aware of the proposed development so that they have an opportunity to provide comments (or potentially object to) the proposed development, and to give DCM an opportunity to consider these comments/objections before a permit decision is made. "Permission" of adjacent property owners is not necessarily required for DCM to issue a permit; however, permission must be obtained for certain types of proposed developments if they fall within a 15'setback area along the riparian access area of the adjacent property, as determined solely by DCM. It is in the applicant's best interest to provide comprehensive and accurate notice so that any concerns or objections can be resolved early in the permit review process. In addition, if the adjacent riparian property owner appeals the permit decision, insufficient notice could be a basis for granting such an appeal. Who is an Adjacent Riparian Property Owner? What is Adjacent? (Note: DCM reads this broadly to ensure comment by potentially impacted neighbors) • A property that shares a boundary line with the site of proposed development; AND • A property that fronts a natural or manmade waterbody that is connected to coastal waters and can support some form of navigation, even a kayak or canoe, including a common canal system or a manmade basin. • Easement holders? Yes, if the easement could be impacted by the proposed development. • Streets/Roads? Only if the street/road could be impacted by the proposed development. This might include street-ends which might be used for parking and beach access. • Holders of recognized submerged lands claims/shellfish franchises. What is Riparian? Do the boundaries of the adjacent property legally intersect with the water at mean high tide? If there is a question about whether an adjacent property is considered "riparian," please reach out to DCM Staff - especially on the oceanfront beach where there may be undeveloped parcels on the beach or in the water. WholWhat is a Property Owner? For private individuals (or families), send notice to the address listed on the tax card. If the property is owned by an Inc. or LLC, please send notice to the person listed as the registered agent on the NC Secretary of State's Corporations Look Up site: https://www.sosnc.gov/search/index/corp. For Condominiums or neighborhoods with an owners' association (HOA/POA), send notice to the association (which is usually a corporation, for which you send notice to its registered agent). What is Notice, and how do I ensure it is received? • You can meet with your adjacent property owner, provide a description or drawing of the proposed development, and ask them to sign this form and return it to DCM; OR • You can hand-deliver this form and a description or drawing, and ask your neighbor to return it to DCM (consider providing them with a stamped envelope); OR • You can mail this form by USPS Certified Mail, return receipt requested (the Green Card). If you choose this option, you must provide either the signed & returned green card OR track the certified mail package number on USPS.GOV's online tracking systern, and provide the tracking print-out as proof of delivery to DCM If you have any questions about this process, please reach out to DCM Staff and DCM Legal Counsel and we will work to answer your questions. RECEIVED OCT 3 0 2024 Revised July 2021 DCM-MHD CITY 1 Tn 1 ov a n �Vlo -t o I c f i ►v.S I - r1TRJ N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner. 4— a S17 (� p Address of Property: �4� 6 �t Mailing Address of Owner:Owner's email:email: 16W fQOwn�r'ss P e#: Q�� 7 7- 99 Agent's Name: Agent Phone#: — Agent's Email: ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing, with dimensions must be provided with this letter. I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be mai!ed to 400 Commerce Ave., Morehead City, NC 28557. DCM representatives can also be contacted at(252) 808-2808. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign the appropriate blank below.) I DO wish to waive some/all of the 15' setback -OR- Signature� of Adjacent Riparian Property Owner I do not wish to waive the 15' setback requirement(initial the blank) Signature of Adjacent Riparian Property Owner: L Typed/Printed name ofARPO: 10Ln bl�A 6:1 Mailing Address of ARPO: L2 6";_W sj�wi h ,-(17 ARPO's email: ARPO's Phone#: Date: Z Z *waiver is valid for up to one year from ARPO's Signature* ECEIVED Revised July 2021 O C T 3 0 2024 DCM-MHD CITY TIPS FOR ADJACENT RIPARIAN OWNER NOTIFICATION &WAIVER FORMS CAMA Regulations require notice of proposed development to the Adjacent Riparian Property Owners(15A NCAC 7J.0204(b)(5)). Proof of actual notice (a sign-off by the owner on this form) or certified mail return receipts (showing delivery of notice) are needed. The purpose of this notice is to make adjacent riparian property owners aware of the proposed development so that they have an opportunity to provide comments (or potentially object to)the proposed development, and to give DCM an opportunity to consider these comments/objections before a permit decision is made. "Permission" of adjacent property owners is not necessarily required for DCM to issue a permit; however, permission must be obtained for certain types of proposed developments if they fall within a 15'setback area along the riparian access area of the adjacent property, as determined solely by DCM. It is in the applicant's best interest to provide comprehensive and accurate notice so that any concerns or objections can be resolved early in the permit review process. In addition, if the adjacent riparian property owner appeals the permit decision, insufficient notice could be a basis for granting such an appeal. Who is an Adjacent Riparian Property Owner? What is Adjacent? (Note: DCM reads this broadly to ensure comment by potentially impacted neighbors) • A property that shares a boundary line with the site of proposed development; AND • A property that fronts a natural or manmade waterbody that is connected to coastal waters and can support some form of navigation, even a kayak or canoe, including a common canal system or a manmade basin. • Easement holders? Yes, if the easement could be impacted by the proposed development. • Streets/Roads? Only if the street/road could be impacted by the proposed development. This might include street-ends which might be used for parking and beach access. • Holders of recognized submerged lands claims/shellfish franchises. What is Riparian? Do the boundaries of the adjacent property legally intersect with the water at mean high tide? If there is a question about whether an adjacent property is considered "riparian," please reach out to DCM Staff - especially on the oceanfront beach where there may be undeveloped parcels on the beach or in the water. WhoMhat is a Property Owner? For private individuals(or families), send notice to the address listed on the tax card. If the property is owned by an Inc. or LLC, please send notice to the person listed as the registered agent on the NC Secretary of State's Corporations Look Up site: https://www.sosnc.gov/search/index/corp. For Condominiums or neighborhoods with an owners' association (HOA/POA), send notice to the association (which is usually a corporation, for which you send notice to its registered agent). What is Notice, and how do I ensure it is received? • You can meet with your adjacent property owner, provide a description or drawing of the proposed development, and ask them to sign this form and return it to DCM; OR • You can hand-deliver this form and a description or drawing, and ask your neighbor to return it to DCM (consider providing them with a stamped envelope); OR • You can mail this form by USPS Certified Mail, return receipt requested (the Green Card). If you choose this option, you must provide either the signed & returned green card OR track the certified mail package number on USPS.GOV's online tracking system, and provide the tracking print-out as proof of delivery to DCM If you have any questions about this process, please reach out to DCM Staff and DCM Legal Counsel and we will work to answer your questions. RECEIVED OCT 3 0 2024 Revised July 2021 DCM-MHD CITY a Q 1