HomeMy WebLinkAbout101364C - Piner �a`°"Srk ❑CAMA ❑ DREDGE & FILL N° 101364 A B ' D
�o
Previous permit
Date previous permit issued
GENERAL PERMIT
❑New ❑Modification ❑Complete Reissue ❑Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
15A NCAC ❑Rules attached. ❑ General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent _ �' i n•
Address L J'a Project Location(County `
City 11 7 State C, ZIP 5 l6 Street Address/State Road/Lot#(s) O ✓t✓�
Phone#(iLf S 0 — 6 L g y
Email •)t 42a, G D Subdivision /
City iiC ZIP
Affected ❑CW ❑EW ❑PTA ❑ES ❑PTS Adj.Wtr.Body ( t/man/unk)
AEC(s): ❑OEA ❑IHA ❑UW ❑SPIMA ❑PWS Closest Maj.Wtr.Body
ORW:yes/nry PNA:yes/po)
Type of Project/Activity
(Scale:
Shoreline Length ,t {
Access Length i
Pier(dock)length
Fixed Platform(s)
Floating Platform(s)
f, .t .•1
t
Finger pier(s)
Total Platform area
Groin length/#
l khe�Riprap length r i f• is
Avg distance offshore ppp
Breakwater/Sill
Max distance/length _
Basin,channel
Cubic yards
Boat ramp —"
Boathouse/Boatlift j
Beach Bulldozing
Other
SAV observed: yes
Moratorium: n/a yes Wd
Site Photos: yes_ I'd
Riparian Waiver Attached: es no �� 1 - ri.;
A building permit/zoning permit may be required by: -t 'I l0A1t"
TAR/PAM JEUSE/BUFFER(circle one)
Permit Conditions liy lri k_ 1;:i, J 1
/ 1Vt, L , hi /�al{r�.:'+mil 'sS-� ,•"i 140� See note on back regarding River Basin rules
tinIt'vbw-i 07 /4yL. ,
- ❑ See additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) �
Agent or Applicant PRINTED Name ' Permit Officer's PRINTED Name
Signature*:.Pleas ead compliance statement on back of permit** Signature
o y 9� i -5 L 3 I C /3p/�2 1 G 3/G I�?
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
1-1 Tar- Pamlico River Basin Buffer Rules F-1 Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin.These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves:Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S.Griffin St.Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie,Camden,Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
CO"r",&❑CAMA ❑ DREDGE & FILL N9 101364 A B Q' D
a Previous permit
GENERAL PERMIT Date previous permit issued
❑New ❑Modification ❑Complete Reissue ❑Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
15A NCAC ❑Rules attached. ❑ General Permit Rules available at the following link:www.dgq.nc.Yov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County): 1
City State ZIP Street Address/State Road/Lot#(s)
w
Phone#
Email Subdivision
City ZIP
Affected ❑CW ❑EW ❑PTA ❑ES ❑PTS Adj.Wtr.Body / (nat/man/unk)
AEC(s): ❑OEA ❑IHA ❑UW ❑SPIMA ❑PWS Closest Maj.Wtr.Body Ji ✓�
ORW:yes/nq PNA:yes/no,
Type of Project/Activity
(Scale: / S)
Shoreline Length
Access Length
Pier(dock)length
Fixed Platform(s) }}
Floating Platform(s)
I i
Finger pier(s)
Total Platform area j
I
Groin length/#
Bulkheadsi iprap length
Avg distance offshore
Breakwater/Sill /✓ ✓4
Max distance/length
Basin,channel -
Cubic yards
Boat ramp
Boathouse/Boatlift j
Beach Bulldozing
Other
1
SAV observed: yes (rid y �"
Moratorium: n/a yes nd
Site Photos: yes no I
Riparian Waiver Attached: yes no .2
A building permit/zoning permit may be required by: f
! ❑ TAR/PAM/NEUSE/BUFFER(circle one)
Permit Conditions
- - ❑ See note on back regarding River Basin rules
❑ See additional notes/conditions.on back
i
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature'!Ateas�,read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-411COAST Fax: 252-247-3330 252-946-6481
(Serves:Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S.Griffin St.Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie,Camden,Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
ROY COOPER
Governor
MARY PENNY KELLEY •�•
Secretary
TANCRED MILLER NORTH CAROLINA
Director Environmental Quality
BUFFER AUTHORIZATION CERTIFICATE FOR SHOREI.JNE STABILIZATION
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico&
Neuse River Riparian buffer per Division of Water Resources(DWR)regulations 15A NCAC 0213.0233&.0259.The
Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water
Resources(DWR)has reviewed your project proposal and has determined that the project as proposed complies with
the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA)permit have received Buffer Authorization
provided the project Is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor)performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward
of either normal water line(NWL)or normal high-water line(NHWL)and extends 30 feet landward)
shall be minimized to what must be impacted for the sound installation of the shoreline stabilization
project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules.
2. Clearing&Grading;Clearing and grading of Zone 2(begins at the landward edge of Zone 1 and
extends 20 feet landward) is allowed provided that it Is re-vegetated immediately and zone 1 is not
compromised,which includes maintaining diffused (non-channelized)flow of storm water runoff
through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they
must be satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave
overwash is expected to be severe,the first ten (10)feet landward (unless specifically authorized
otherwise by DCM)from the structure may be maintained as a stable lawn in order to provide for
structural stability.
5. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as
possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch
and/or erosion matting.This ground cover is a temporary measure used to address erosion until site
restoration can be accomplished.
6. Site Restoration:At minimum, pre-project site conditions must be re-established.A site that was
wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem
density of 260 stems per acre. Non wooded sites may be re-vegetated with woody vegetation.
Restoration must be completed by the first subsequent planting season (November 1 through-March
30)after completion of the bulkhead.
• Pre-project site conditions: Escaroed shoreline
7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the location of the shoreline stabilization structure and any associated clearing,
grading,and construction corridors.This drawing will be used to aid in compliance and monitoring
efforts.
By your signature below you agree to be held responsible for meeting all of the conditions listed above and
verify that all information provided is complete and accurate.
51 �e/7
Agent or Applicant Printed Name Permit Officer's Signature
Q 3 0 oay
Agent or icant Signature Issue bate
CAMA GENERAL PERMIT#: 101364
DE QQ L' North Carolina Department of Environmental Quality I Division of Coastal Management
_ Morehead City Office 1 400 Commerce Avenue I Morehead City,North Carolina 28557
oti.wr 6+�r+ /'� 252.515.5400
Mahoney, Richard
From: Larry Brown <larryabrown0102@gmail.com>
Sent: Monday, October 28, 2024 1:05 PM
To: Mahoney, Richard
Subject: [External] Re: Objections for John Piner's Property at 305 Garbacon Drive in Beaufort
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
rich
the bulkhead would divert the natural flow of water around my property.This may cause flooding and or
erosion on my property.
additionally the bulkhead would ruin the natural look of the shoreline
On Mon, Oct 28, 2024 at 12:18 PM Mahoney, Richard <Richard.Mahoney@deq.nc.gov>wrote:
Hi Larry,
On your riparian notification form you indicate that you have objections for John Piner's Property at 305
Garbacon Drive in Beaufort. I need written objections so if you could inform me via email what your
objections are for the bulkhead that they are proposing I would greatly appreciate it.
R y ,
Thanks
Richard Mahoney
Field Representative
Division of Coastal Mai "
400 Commerce Avenu(
Mobile: 252-240-9497
Richard.Mahoney@de
www.deg.nc.gov
Find a Field Rep (arcgis.__...,
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
2
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIV VED
CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND D 1 RY
(Top portion to be completed by owner or their agent) OCT 15 Z024
Name of Property Owner: JOHN PINER r)r _'J11-ID CITY
Address of Property: 305 GARBACON DR BEAUFORT NC 28516
Mailing Address of Owner: SAME
Owner's email: RPINER39@GMAIL.COM Owner's Phone#: 619-890-6194
Agent's Name: Stephen Perry Agent Phone#: 252-883-9685
Agent's Email: sperry@dynamiceast.net
1 .
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property.The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. A
description or drawing, with dimensions must be provided with this letter.
DO NOT have objections to this proposal. I DO have objections to this proposal.
2• If you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 400 Commerce Ave.,Morehead City, NC 28557.DCM representatives can also be contacted
at(252) 808-2808. No response is considered the same as no objection if you have been notified by
Certified Mail.
WAIVER SECTION
I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or
groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign
the appropriate blank below.)
I DO wish to waive some/all of the 15' setback
Signature of Adjacent Riparian Property Owner
-OR-
I do not wish to waive the 15' setback requirement(initial a blank)
3.
Signature of Adjacent Riparian Property Owner ��, �
Typed/Printed name of ARPO: LAWRENCE BROWN
Mailing Address of ARPO: 83 COVE RD. OYSTER BAY NY 11771
ARPO s email:,,U"AAAw�Q( a2 69-PA'A04's Phone#: 152E 7i�0
Date: *waiver is valid for up to one year from ARPO's Signature`
Revised July 2021
Y
Docusign Envelope ID:FEB8AF22-0935-434A-BF06-97D251F29670
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: JOHN PINER
Mailing Address: 305 GARBACON DR BEAUFORT NC 28516
Phone Number: 619-890-6194
Email Address: RPINER39@GMAIL.COM
I certify that I have authorized Stephen Perry / Dynamic East Construction
Agent/Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development:
NEW VINYL SEAWALL
at my property located at 305 GARBACON DR BEAUFORT NC 28516
in Carteret County.
/ furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
F`9ip„M by:
11-flL RECEIVED
Signature
John R Piner OCT 1 1 2024
Print or Type Name
Owner DCM-MHD CITY
Title
10/1/2024
Date
This certification is valid through I I
----q UNITEDSTATES
ftilf,ib-�MLS&WCE,, Click-N-Ship®
-sus cv,, 9405 SOX,q93p"/,: -,:,15 02 0098 50(xCV2 8594
S9.86
US POSTAGE
iNeskrwFR E,- U.S,POSTAGE PAID
P 0950r2024 Maoel flom 2F5SA 98673217'A'2624?
PRIORITY MAILO
STEPHEN PERRY Expectel cewery nx. 1-
309 CRAYFISH CT
SWANSBORO NC 28584-0136 0003
PATRICIA FOLEY
108 OCEAN DR
EMERALD ISLE NC 2859"941
USPS TRACKING #
111111111111 11 11
9405 5036 9930 0715 0255 02
Electronic Rate Approved#038555749
z
O z RECEIVED
OCT 1 1 2024
DCM-MHD CITY
BPS AL ERVIcE Click-N-Ship®
s9.6s
US POSTAGE
W,4�FA E, U.S.POSTAGE PAID
04V-12024 Maher!hom 28564 486732175424867
PRIORITY MAIL®
11EPHEN PERRY Expected De€,e,y Date:10/03,24
J9 CRAYFISH CT
WANSBORO NC 28584-0136 0003
C010
w
LAWRENCE BROWN
r 83 COVE RD
OYSTER BAY NY 1 1 771-241 7
USPS TRACKING #
9405 5036 9930 0715 0255 19
Electronic Rate Approved #038555749
x
E
E
x RECEIVED
v O C T 1 1 2024
DCM-MHD CITY
a„
411
r.
s
it
,-
,�:'-2«,' .., 7,
_� � .,.,,,-„ sue,_ ,..w. .-. �.,, 4.,.
$'
shi
LA
RICK
! •
. 305 GARBACON DR.
i ' •
CON DR.
PATRiCIA
303 t •
1
` rc REVISIONS
A
MM/DD/YY REMARKS O
SEAWALL CONCEPT 1 -- --/--
3 --/--/-- ...
RICK PINER-305 GARBACON DR a __/__/__ •.• Q�
Styron, Heather M.
From: Mahoney, Richard
Sent: Thursday, October 10, 2024 1:56 PM
To: Styron, Heather M.; Guthrie, Kara L
Subject: Fw: [External] John Piner- 305 Garbacon Dr - CAMA App
Attachments: CAMA App.pdf
Get Outtook for iOS
From: Stephen Perry<sperry@dynamiceast.net>
Sent: Thursday, October 10, 2024 9:23:57 AM
To: Mahoney, Richard <Richard.Mahoney@deq.nc.gov>
Subject: [External]John Piner- 305 Garbacon Dr-CAMA App
rCAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Good morning,
Please see the attached request. The riparians delivered 10/7 and 10/8.
Stephen Perry
Dynamic East Construction
Cell: 252-883-9685
Office: 252-773-4116
RECEIVED
O C T 1 1 2024
CONSTRUCTION
!aaJi(i ynra u.RFref ar
DCM-MHD CITY
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official
1
V
ROY COOPER
Governor (.•.�1,
MARY PENNY KELLEY
Secretary
TANCRED MILLER NORTH CAAROLINA
Dgmaor Environmental Quality
Lawrence Brown 10/30/2024
83 Cove Road
Oyster Bay, NY 11771-2417
Dear Mr. Brown:
This letter is in response to your adjacent riparian property owners statement received by DCM
on 10/15/2024 regarding your concerns about the proposal by John Piner c/o Dynamic East to
construct a 125' bulkhead with two 16' wing walls at 305 Garbacon Drive in Beaufort, Carteret
County. The proposed project has been determined to comply with the Rules of the Coastal
Resources Commission (07H A 100), and as such, a permit has been issued to authorize the
development. I have enclosed a copy of the permit, as well as the relevant statutes.
If you wish to contest our decision to issue this permit,you may file a request for a Third-
Party Hearing. The request for a hearing will be considered by the Chair of the Coastal
Resources Commission. The hearing request must be filed with the Director, Division of
Coastal Management, in writing and must be received within twenty (20) days after the
disputed permit decision is made. I have enclosed the applicable forms and instructions
that must be filed prior to that deadline. Please contact me at (252) 515-5400, if you have
any questions, or if I can provide any additional information.
Sincerely,
I-Leather nit. st�row
Heather Styron
District Manager
North Carolina Department of Environmental Quality I Division of Coastal Management
e�— ,—DE Morehead City Office 400 Commerce Avenue I Morehead aty,.North Carolina 28557