Loading...
HomeMy WebLinkAbout101364C - Piner �a`°"Srk ❑CAMA ❑ DREDGE & FILL N° 101364 A B ' D �o Previous permit Date previous permit issued GENERAL PERMIT ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: 15A NCAC ❑Rules attached. ❑ General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent _ �' i n• Address L J'a Project Location(County ` City 11 7 State C, ZIP 5 l6 Street Address/State Road/Lot#(s) O ✓t✓� Phone#(iLf S 0 — 6 L g y Email •)t 42a, G D Subdivision / City iiC ZIP Affected ❑CW ❑EW ❑PTA ❑ES ❑PTS Adj.Wtr.Body ( t/man/unk) AEC(s): ❑OEA ❑IHA ❑UW ❑SPIMA ❑PWS Closest Maj.Wtr.Body ORW:yes/nry PNA:yes/po) Type of Project/Activity (Scale: Shoreline Length ,t { Access Length i Pier(dock)length Fixed Platform(s) Floating Platform(s) f, .t .•1 t Finger pier(s) Total Platform area Groin length/# l khe�Riprap length r i f• is Avg distance offshore ppp Breakwater/Sill Max distance/length _ Basin,channel Cubic yards Boat ramp —" Boathouse/Boatlift j Beach Bulldozing Other SAV observed: yes Moratorium: n/a yes Wd Site Photos: yes_ I'd Riparian Waiver Attached: es no �� 1 - ri.; A building permit/zoning permit may be required by: -t 'I l0A1t" TAR/PAM JEUSE/BUFFER(circle one) Permit Conditions liy lri k_ 1;:i, J 1 / 1Vt, L , hi /�al{r�.:'+mil 'sS-� ,•"i 140� See note on back regarding River Basin rules tinIt'vbw-i 07 /4yL. , - ❑ See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) � Agent or Applicant PRINTED Name ' Permit Officer's PRINTED Name Signature*:.Pleas ead compliance statement on back of permit** Signature o y 9� i -5 L 3 I C /3p/�2 1 G 3/G I�? Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: 1-1 Tar- Pamlico River Basin Buffer Rules F-1 Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin.These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves:Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S.Griffin St.Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie,Camden,Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 CO"r",&❑CAMA ❑ DREDGE & FILL N9 101364 A B Q' D a Previous permit GENERAL PERMIT Date previous permit issued ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: 15A NCAC ❑Rules attached. ❑ General Permit Rules available at the following link:www.dgq.nc.Yov/CAMArules Applicant Name Authorized Agent Address Project Location(County): 1 City State ZIP Street Address/State Road/Lot#(s) w Phone# Email Subdivision City ZIP Affected ❑CW ❑EW ❑PTA ❑ES ❑PTS Adj.Wtr.Body / (nat/man/unk) AEC(s): ❑OEA ❑IHA ❑UW ❑SPIMA ❑PWS Closest Maj.Wtr.Body Ji ✓� ORW:yes/nq PNA:yes/no, Type of Project/Activity (Scale: / S) Shoreline Length Access Length Pier(dock)length Fixed Platform(s) }} Floating Platform(s) I i Finger pier(s) Total Platform area j I Groin length/# Bulkheadsi iprap length Avg distance offshore Breakwater/Sill /✓ ✓4 Max distance/length Basin,channel - Cubic yards Boat ramp Boathouse/Boatlift j Beach Bulldozing Other 1 SAV observed: yes (rid y �" Moratorium: n/a yes nd Site Photos: yes no I Riparian Waiver Attached: yes no .2 A building permit/zoning permit may be required by: f ! ❑ TAR/PAM/NEUSE/BUFFER(circle one) Permit Conditions - - ❑ See note on back regarding River Basin rules ❑ See additional notes/conditions.on back i I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature'!Ateas�,read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-411COAST Fax: 252-247-3330 252-946-6481 (Serves:Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S.Griffin St.Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie,Camden,Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ROY COOPER Governor MARY PENNY KELLEY •�• Secretary TANCRED MILLER NORTH CAROLINA Director Environmental Quality BUFFER AUTHORIZATION CERTIFICATE FOR SHOREI.JNE STABILIZATION A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico& Neuse River Riparian buffer per Division of Water Resources(DWR)regulations 15A NCAC 0213.0233&.0259.The Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water Resources(DWR)has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA)permit have received Buffer Authorization provided the project Is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party(contractor)performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either normal water line(NWL)or normal high-water line(NHWL)and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing&Grading;Clearing and grading of Zone 2(begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it Is re-vegetated immediately and zone 1 is not compromised,which includes maintaining diffused (non-channelized)flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is expected to be severe,the first ten (10)feet landward (unless specifically authorized otherwise by DCM)from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 6. Site Restoration:At minimum, pre-project site conditions must be re-established.A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre. Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through-March 30)after completion of the bulkhead. • Pre-project site conditions: Escaroed shoreline 7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading,and construction corridors.This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify that all information provided is complete and accurate. 51 �e/7 Agent or Applicant Printed Name Permit Officer's Signature Q 3 0 oay Agent or icant Signature Issue bate CAMA GENERAL PERMIT#: 101364 DE QQ L' North Carolina Department of Environmental Quality I Division of Coastal Management _ Morehead City Office 1 400 Commerce Avenue I Morehead City,North Carolina 28557 oti.wr 6+�r+ /'� 252.515.5400 Mahoney, Richard From: Larry Brown <larryabrown0102@gmail.com> Sent: Monday, October 28, 2024 1:05 PM To: Mahoney, Richard Subject: [External] Re: Objections for John Piner's Property at 305 Garbacon Drive in Beaufort CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. rich the bulkhead would divert the natural flow of water around my property.This may cause flooding and or erosion on my property. additionally the bulkhead would ruin the natural look of the shoreline On Mon, Oct 28, 2024 at 12:18 PM Mahoney, Richard <Richard.Mahoney@deq.nc.gov>wrote: Hi Larry, On your riparian notification form you indicate that you have objections for John Piner's Property at 305 Garbacon Drive in Beaufort. I need written objections so if you could inform me via email what your objections are for the bulkhead that they are proposing I would greatly appreciate it. R y , Thanks Richard Mahoney Field Representative Division of Coastal Mai " 400 Commerce Avenu( Mobile: 252-240-9497 Richard.Mahoney@de www.deg.nc.gov Find a Field Rep (arcgis.__..., Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 2 N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIV VED CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND D 1 RY (Top portion to be completed by owner or their agent) OCT 15 Z024 Name of Property Owner: JOHN PINER r)r _'J11-ID CITY Address of Property: 305 GARBACON DR BEAUFORT NC 28516 Mailing Address of Owner: SAME Owner's email: RPINER39@GMAIL.COM Owner's Phone#: 619-890-6194 Agent's Name: Stephen Perry Agent Phone#: 252-883-9685 Agent's Email: sperry@dynamiceast.net 1 . ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing, with dimensions must be provided with this letter. DO NOT have objections to this proposal. I DO have objections to this proposal. 2• If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 400 Commerce Ave.,Morehead City, NC 28557.DCM representatives can also be contacted at(252) 808-2808. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign the appropriate blank below.) I DO wish to waive some/all of the 15' setback Signature of Adjacent Riparian Property Owner -OR- I do not wish to waive the 15' setback requirement(initial a blank) 3. Signature of Adjacent Riparian Property Owner ��, � Typed/Printed name of ARPO: LAWRENCE BROWN Mailing Address of ARPO: 83 COVE RD. OYSTER BAY NY 11771 ARPO s email:,,U"AAAw�Q( a2 69-PA'A04's Phone#: 152E 7i�0 Date: *waiver is valid for up to one year from ARPO's Signature` Revised July 2021 Y Docusign Envelope ID:FEB8AF22-0935-434A-BF06-97D251F29670 AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: JOHN PINER Mailing Address: 305 GARBACON DR BEAUFORT NC 28516 Phone Number: 619-890-6194 Email Address: RPINER39@GMAIL.COM I certify that I have authorized Stephen Perry / Dynamic East Construction Agent/Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: NEW VINYL SEAWALL at my property located at 305 GARBACON DR BEAUFORT NC 28516 in Carteret County. / furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: F`9ip„M by: 11-flL RECEIVED Signature John R Piner OCT 1 1 2024 Print or Type Name Owner DCM-MHD CITY Title 10/1/2024 Date This certification is valid through I I ----q UNITEDSTATES ftilf,ib-�MLS&WCE,, Click-N-Ship® -sus cv,, 9405 SOX,q93p"/,: -,:,15 02 0098 50(xCV2 8594 S9.86 US POSTAGE iNeskrwFR E,- U.S,POSTAGE PAID P 0950r2024 Maoel flom 2F5SA 98673217'A'2624? PRIORITY MAILO STEPHEN PERRY Expectel cewery nx. 1- 309 CRAYFISH CT SWANSBORO NC 28584-0136 0003 PATRICIA FOLEY 108 OCEAN DR EMERALD ISLE NC 2859"941 USPS TRACKING # 111111111111 11 11 9405 5036 9930 0715 0255 02 Electronic Rate Approved#038555749 z O z RECEIVED OCT 1 1 2024 DCM-MHD CITY BPS AL ERVIcE Click-N-Ship® s9.6s US POSTAGE W,4�FA E, U.S.POSTAGE PAID 04V-12024 Maher!hom 28564 486732175424867 PRIORITY MAIL® 11EPHEN PERRY Expected De€,e,y Date:10/03,24 J9 CRAYFISH CT WANSBORO NC 28584-0136 0003 C010 w LAWRENCE BROWN r 83 COVE RD OYSTER BAY NY 1 1 771-241 7 USPS TRACKING # 9405 5036 9930 0715 0255 19 Electronic Rate Approved #038555749 x E E x RECEIVED v O C T 1 1 2024 DCM-MHD CITY a„ 411 r. s it ,- ,�:'-2«,' .., 7, _� � .,.,,,-„ sue,_ ,..w. .-. �.,, 4.,. $' shi LA RICK ! • . 305 GARBACON DR. i ' • CON DR. PATRiCIA 303 t • 1 ` rc REVISIONS A MM/DD/YY REMARKS O SEAWALL CONCEPT 1 -- --/-- 3 --/--/-- ... RICK PINER-305 GARBACON DR a __/__/__ •.• Q� Styron, Heather M. From: Mahoney, Richard Sent: Thursday, October 10, 2024 1:56 PM To: Styron, Heather M.; Guthrie, Kara L Subject: Fw: [External] John Piner- 305 Garbacon Dr - CAMA App Attachments: CAMA App.pdf Get Outtook for iOS From: Stephen Perry<sperry@dynamiceast.net> Sent: Thursday, October 10, 2024 9:23:57 AM To: Mahoney, Richard <Richard.Mahoney@deq.nc.gov> Subject: [External]John Piner- 305 Garbacon Dr-CAMA App rCAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning, Please see the attached request. The riparians delivered 10/7 and 10/8. Stephen Perry Dynamic East Construction Cell: 252-883-9685 Office: 252-773-4116 RECEIVED O C T 1 1 2024 CONSTRUCTION !aaJi(i ynra u.RFref ar DCM-MHD CITY Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official 1 V ROY COOPER Governor (.•.�1, MARY PENNY KELLEY Secretary TANCRED MILLER NORTH CAAROLINA Dgmaor Environmental Quality Lawrence Brown 10/30/2024 83 Cove Road Oyster Bay, NY 11771-2417 Dear Mr. Brown: This letter is in response to your adjacent riparian property owners statement received by DCM on 10/15/2024 regarding your concerns about the proposal by John Piner c/o Dynamic East to construct a 125' bulkhead with two 16' wing walls at 305 Garbacon Drive in Beaufort, Carteret County. The proposed project has been determined to comply with the Rules of the Coastal Resources Commission (07H A 100), and as such, a permit has been issued to authorize the development. I have enclosed a copy of the permit, as well as the relevant statutes. If you wish to contest our decision to issue this permit,you may file a request for a Third- Party Hearing. The request for a hearing will be considered by the Chair of the Coastal Resources Commission. The hearing request must be filed with the Director, Division of Coastal Management, in writing and must be received within twenty (20) days after the disputed permit decision is made. I have enclosed the applicable forms and instructions that must be filed prior to that deadline. Please contact me at (252) 515-5400, if you have any questions, or if I can provide any additional information. Sincerely, I-Leather nit. st�row Heather Styron District Manager North Carolina Department of Environmental Quality I Division of Coastal Management e�— ,—DE Morehead City Office 400 Commerce Avenue I Morehead aty,.North Carolina 28557