Loading...
HomeMy WebLinkAbout14-02 MM 21' Plans9 8 7 6 5 4 3 BA 2 1 EDC HGF DATE: DATE: DRAWN: Surveyed Surveyed by: SCALE: SHEET OF SHEETS DRAWING NO. WEEKS MARINE NO. 9 8 7 6 JI MLK 5 4 3 ON P 2 1 1 OF 1 N/A 2021.12.14 1"=700' WMI Job #: 13210061 13210061 304 Gaille Dr Covington, LA 70433-9125 DREDGING - MARINE CONSTRUCTION - MARINE TRANSPORTATION (985) 875-2500 Subline #5: Min Line Length: = 5510' Max Line Length: = 7,940' Subline #4: Min Line Length: = 5510' Max Line Length: = 7960' Subline #3: Min Line Length: = 5510' Max Line Length: = 8010' Subline #2: 3x720's & 3x800's Min Line Length: = 5030' Max Line Length: = 7580' Subline #1: 3x720's & 3x800's Min Line Length: = 5030' Max Line Length: = 8030' 9 8 7 6 5 4 3 BA 2 1 EDC HGF DATE: DATE: DRAWN: Surveyed Surveyed by: SCALE: SHEET OF SHEETS DRAWING NO. WEEKS MARINE NO. 9 8 7 6 JI MLK 5 4 3 ON P 2 1 1 OF 1 N/A 2021.12.15 1"=700' WMI Job #: 13210061 13210061 304 Gaille Dr Covington, LA 70433-9125 DREDGING - MARINE CONSTRUCTION - MARINE TRANSPORTATION (985) 875-2500 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 01 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 01 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 COVER SHEETNOTES: HOLDEN BEACH RENOURISHMENT HOLDEN BEACH, NORTH CAROLINA SHEET INDEX: 1.COVER SHEET 2.LOCATION MAP 3.BEACH FILL SITE PLAN OVERVIEW 4.BEACH FILL - SITE PLAN STA. 30+00 TO 40+00 5.BEACH FILL - SITE PLAN STA. 50+00 TO 60+00 6.BEACH FILL - SITE PLAN STA. 70+00 TO 80+00 7.BEACH FILL - SITE PLAN STA. 90+00 TO 100+00 8.BEACH FILL - SITE PLAN STA. 110+00 TO 120+00 9.BEACH FILL - SITE PLAN STA. 130+00 TO 140+00 10.BEACH FILL - SITE PLAN STA. 150+00 TO 160+00 11.BEACH FILL - SITE PLAN STA. 170+00 TO 180+00 12.BEACH FILL - SITE PLAN STA. 190+00 TO 200+00 13.BEACH FILL - SITE PLAN STA. 210+00 TO 220+00 14.BEACH FILL - SITE PLAN STA. 230+00 TO 240+00 15.BEACH FILL - SITE PLAN STA. 250+00 TO 260+00 16.BEACH FILL - SITE PLAN STA. 270+00 TO 280+00 17.PROPOSED BEACH FILL PROFILES - STA.: 30+00 TO 80+00 18.PROPOSED BEACH FILL PROFILES - STA.: 90+00 TO 140+00 19.PROPOSED BEACH FILL PROFILES - STA.: 150+00 TO 200+00 20.17.PROPOSED BEACH FILL PROFILES - STA.: 210+00 TO 260+00 21.17.PROPOSED BEACH FILL PROFILES - STA.: 270+00 TO 300+00 22.BORROW AREA OVERVIEW 23.BORROW AREA 1 OVERVIEW 24.BORROW AREA 1 SITE PLAN 25.BORROW AREA 1 PROFILES 26.BORROW AREA 2 OVERVIEW 27.BORROW AREA 2 SITE PLAN 28.BORROW AREA 2 PROFILES NORTH CAROLINA BRUNSWICK COUNTY HOLDEN BEACH PROJECT LOCATION: OCEAN BOULEVARD HOLDEN BEACH NORTH CAROLINA 50+00 70+00 90+00 110+00 130+00 150+00170+00 190+00 210+00 250+00 230+00 270+00 290+00 310+00 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 02 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 02 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 LOCATION MAPNOTES: 1.SURVEY PERFORMED BY TI COASTAL, DATED APRIL 2020 AUGMENTED WITH AUGUST 2020 POST-ISAIAS DATA WHERE AVAILABLE. 2.ELEVATIONS ARE BASED ON NGVD29, FT. BEACH FILL TEMPLATE HIGHWAY 17 STONE CHIMNEY RD. OLD FERRY CONNECTION SW SABBATH HOME RD. SWNC-130 EAST NC-130 EAST NC-130 EAST RED BUG RD NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 03 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 03 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 BEACH FILL SITE PLAN OVERVIEW PERMITTED TEMPLATE: 217.5 ACRES 23,970 LINEAR FEET ATLANTIC OCEAN S T A . 3 0 0 + 0 0 S T A . 2 5 0 + 0 0 S T A . 2 0 0 + 0 0 S T A . 1 5 0 + 0 0 S T A . 1 0 0 + 0 0 ST A . 5 0 + 0 0 ST A . 4 0 + 0 0 S T A . 2 8 0 + 0 0 23,970 LINEAR FEE T EXISTING BEACH ACCESS/ STAGING AREAEXISTING BEACH ACCESS/ STAGING AREA EXISTING STAGING AREA EXISTING BEACH ACCESS/ STAGING AREA HOLDEN BEACH NOTES: 1.SURVEY PERFORMED BY TI COASTAL, DATED APRIL 2020 AUGMENTED WITH AUGUST 2020 POST-ISAIAS DATA WHERE AVAILABLE. 2.ELEVATIONS ARE BASED ON NGVD29, FT. 17.412.49.810.5 8.0 7.4 7.1 7.1 7.2 7.57.4 6.0 4.0 2.0 1.2 0.5 -0.7 -1.4 -2.3 -3.0 -3.5 -3.9 -4.4 -5.0 -3.5 -14.3 -13.9 -13.5 -12.6 -12.1 -11.7 -11.3 -10.8 -9.5 -8.8 -8.4 -8.1 -7.5 -6.6 -5.7 -4.2 -13.1 -10.2 OCEAN BLVD E MHW MLWMLW MHW SVL -10 0 0 0 -4 -4 -2 -22 2 4 4 6 6 8 8 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 04 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 04 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 BEACH FILL - SITE PLAN STA. 30+00 TO 40+00 ATLANTIC OCEAN STA. 30+00STA. 40+00 TOE OF FILL SEAWARD EDGE OF BERM (+7' NGVD) SECONDARY BERM (+10' NGVD) NOTES: 1.SURVEY BY TI COASTA, DATED 4/20 & 8/20 (POST ISAIAS). 2.ELEVATIONS ARE BASED ON NGVD29, FT. 3.SVL-STATIC VEGETATION LINE, MHW-MEAN HIGH WATER, MLW-MEAN LOW WATER. 4.AERIAL TAKEN IN AUGUST 2021 BY APOLLO MAPPING 5.NO EXISTING ESTABLISHED DUNE VEGETATION WILL BE COVERED DURING THIS PROJECT. 6.PLANTING AREA INDEPENDENT OF FILL BUT MAY OVERLAP WITH FILL. 7.SECONDARY BERM HEIGHT TO MATCH LANDWARD BERM ELEVATION. LEGEND BERM BERM SLOPE SECONDARY BERM PLANTING AREA Adjacent Owner: HOLDEN JOHN M & DAVID L Mailing Address: 111 DUNESCAPE DRIVE HOLDEN BEACH, NC 28462 AV E N U E B DU N S C A P E D R . -10.2 POST ISAIAS SURVEY POINTS (AUGUST 2020) LWFIX NOURISHMENT (USACE PROJECT) LWFIX TOP OF BERM MHW MLW 50+00 11.1 15.3 10.310.8 9.8 9.6 11.0 9.4 7.5 6.1 4.9 10.2 10.1 9.7 9.6 10.2 9.7 9.8 9.1 8.7 3.7 2.4 1.6 1.0 0.4 -0.3 -0.7 -1.3 -2.3 -3.1 -3.8 -4.1 -4.0 -3.2 6.3 4.3 2.7 1.9 1.5 0.6 -0.4 -1.5 -2.5 -2.8 -3.3 -3.6 -3.6 -2.6 -3.1 -3.6 -4.3 -10.6 -10.3 -10.0 -9.8 -9.8 -9.8 -9.5 -9.2 -9.0 -8.6 -8.1 -7.4 -6.6 -5.3 -4.6 -12.1 -12.1 -12.1 -12.0 -12.0 -11.9 -11.7 -11.6 -11.6 -11.6 -11.5 -11.4 -11.1 -10.5 -9.8 -8.9 -7.8 -6.7 -5.3-4.9 -4.3 -4.0 -10.6 -4.1 -11.9 OCEAN BLVD E OCEAN BLV D E FE R R Y R D . H O L D E N S T . MLW MLW MHW MHW SVL SVL -10 - 1 0 -10 -10 -10 -10 0 0 0 0 0 -12 -12 -12 -4 -4 -4 -4 -4 -2 -2 -2 -2 -2 2 2 2 2 2 4 4 4 4 4 6 6 6 6 6 68 8 8 8 8 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 05 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 05 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 BEACH FILL - SITE PLAN STA. 30+00 TO 50+00 ATLANTIC OCEAN STA. 50+00 STA. 60+00 TOE OF FILL SEAWARD EDGE OF BERM (+7' NGVD) SECONDARY BERM (+10' NGVD) PLANTINGS TO FOLLOW POST ISAIAS/EXISTING VEGETATION LEGEND BERM BERM SLOPE SECONDARY BERM PLANTING AREA SECONDARY BERM (+10' NGVD) PLANTING AREA NOTES: 1.SURVEY BY TI COASTA, DATED 4/20 & 8/20 (POST ISAIAS). 2.ELEVATIONS ARE BASED ON NGVD29, FT. 3.SVL-STATIC VEGETATION LINE, MHW-MEAN HIGH WATER, MLW-MEAN LOW WATER. 4.AERIAL TAKEN IN AUGUST 2021 BY APOLLO MAPPING 5.NO EXISTING ESTABLISHED DUNE VEGETATION WILL BE COVERED DURING THIS PROJECT. 6.PLANTING AREA INDEPENDENT OF FILL BUT MAY OVERLAP WITH FILL. 7.SECONDARY BERM HEIGHT TO MATCH LANDWARD BERM ELEVATION. MHW MLW 70+00 11.8 15.6 11.1 11.3 9.7 10.2 10.2 11.010.2 10.0 9.58.9 5.5 3.4 2.0 1.4 0.5 -0.3 -1.0 -1.2 -1.3 -2.0 -3.1 -9.6 -9.3 -9.1 -9.0 -8.9 -8.8 -8.5 -8.0 -11.7 -10.4 -10.1 -9.8 -9.6 -9.3 -8.1 -7.0 -5.5 -4.2 -3.6 -3.2 -2.7 -11.1 -10.8 -9.5 OCEAN BLV D E OCEAN BLVD E CO L E S T . J O R D A N B L V D . Q U I N T O N S T . HA L S T E A D S T . MHW MLW MLWMHW SVL -10 -10 -10 -10 -10 -10 0 0 0 0 0 -12 -12 -12 -12 -12 -4 -4 -4 -4 -4 -2 -2 -2 -2 -2 2 2 2 2 2 4 4 4 4 4 6 6 6 6 68 8 8 8 8 -2 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 06 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 06 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 BEACH FILL - SITE PLAN STA. 70+00 TO 80+00 ATLANTIC OCEAN STA. 70+00 STA. 80+00 TOE OF FILL SEAWARD EDGE OF BERM (+7' NGVD) SECONDARY BERM (+10' NGVD) EXISTING BEACH ACCESS AND STAGING AREA LEGEND BERM BERM SLOPE SECONDARY BERM PLANTING AREA PLANTING AREA -10.2 POST ISAIAS SURVEY POINTS (AUGUST 2020) NOTES: 1.SURVEY BY TI COASTA, DATED 4/20 & 8/20 (POST ISAIAS). 2.ELEVATIONS ARE BASED ON NGVD29, FT. 3.SVL-STATIC VEGETATION LINE, MHW-MEAN HIGH WATER, MLW-MEAN LOW WATER. 4.AERIAL TAKEN IN AUGUST 2021 BY APOLLO MAPPING 5.NO EXISTING ESTABLISHED DUNE VEGETATION WILL BE COVERED DURING THIS PROJECT. 6.PLANTING AREA INDEPENDENT OF FILL BUT MAY OVERLAP WITH FILL. 7.SECONDARY BERM HEIGHT TO MATCH LANDWARD BERM ELEVATION. MHW MLW 14.5 8.6 14.215.5 11.5 9.510.7 9.6 9.1 9.7 10.0 10.1 9.6 6.2 4.2 2.6 1.6 1.0 0.4 0.0 0.0 -0.7 -1.3 -2.0 -2.6 -3.6 -4.9 -5.9-5.2-4.5-4.2 -12.7-12.4-12.1-11.9-11.6-11.4-11.2-10.9-10.7-10.4 -10.1 -9.7 -9.5-9.3 -9.3 -9.2 -9.2 -9.2 -9.2 -9.2 -9.1-8.7-8.6-8.6-8.4-8.4-8.2-8.0 -8.0-7.8-7.7-7.5-7.2 -14.2-14.0 -13.4 -10.3 -9.9 -9.6-9.4 -9.3 -9.3 -9.2 -9.2 -13.7 -13.0 OCEAN BLVD W OCEAN BLVD W S A I L O R S D R . R O T H S C H I L D S T . DA V I S S T . HW Y . 1 3 0 C O L E S T . MLW MLW MLW MHW MHW MHW SVL SVL SVL -10 -10 -10 -10 -10 0 0 0 0 0 -12 -12 -12 -4 -4 -4 -4 -4 -2 -2 -2 -2 -2 2 2 2 2 2 4 4 4 4 4 6 6 6 6 6 8 8 8 8 8 -2 -2 -2 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 07 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 07 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 BEACH FILL - SITE PLAN STA. 90+00 TO 100+00 ATLANTIC OCEAN STA. 90+00 STA. 100+00 TOE OF FILL SEAWARD EDGE OF BERM (+7' NGVD) SECONDARY BERM (+10' NGVD) LEGEND BERM BERM SLOPE SECONDARY BERM PLANTING AREA PLANTING AREA -10.2 POST ISAIAS SURVEY POINTS (AUGUST 2020) NOTES: 1.SURVEY BY TI COASTA, DATED 4/20 & 8/20 (POST ISAIAS). 2.ELEVATIONS ARE BASED ON NGVD29, FT. 3.SVL-STATIC VEGETATION LINE, MHW-MEAN HIGH WATER, MLW-MEAN LOW WATER. 4.AERIAL TAKEN IN AUGUST 2021 BY APOLLO MAPPING 5.NO EXISTING ESTABLISHED DUNE VEGETATION WILL BE COVERED DURING THIS PROJECT. 6.PLANTING AREA INDEPENDENT OF FILL BUT MAY OVERLAP WITH FILL. 7.SECONDARY BERM HEIGHT TO MATCH LANDWARD BERM ELEVATION. MHW MLW 11.4 13.8 10.913.6 9.9 9.39.99.28.3 9.7 10.1 10.29.6 9.511.8 10.610.7 12.3 11.1 10.4 9.4 8.7 8.8 8.6 8.8 6.7 4.4 2.8 1.5 0.4 0.4 0.6 0.2 -0.4 -1.3 -2.6 -3.7 -4.3 -5.2 5.8 3.7 2.1 0.8 0.2 0.7 0.4 -0.3 -1.0 -2.4 -3.5 -4.2 -5.0 -6.0-5.0-4.4-3.9-3.2 -11.8-11.4-11.2 -10.6 -10.2-10.0 -9.6-9.4-9.3-9.2 -9.2 -9.1 -9.1 -9.0 -9.0 -9.0 -9.0 -8.9 -8.9 -8.8 -8.8 -8.8 -8.8 -8.7 -8.7 -8.6 -8.3-8.3 -8.2-7.9-7.4-6.9 -9.4 -9.4-9.3 -9.0 -9.0 -8.9 -8.9 -8.8-8.7 -8.6 -8.6 -8.6 -8.5 -8.5 -8.5 -8.4-8.2-7.8-7.6-7.0-6.6-6.1-5.2-4.5-4.0-3.4 -13.9-13.6 -13.1-12.8-12.5-12.3-12.0-11.7-11.4-11.2-11.0-10.7-10.5-10.3-10.0-9.8-9.6 -10.9 -10.4 -9.8 -9.0 -8.9 -8.8 -8.8 -8.6 -13.4 OCEAN BLVD W OCEAN BLVD W OCEAN BLVD W B O Y D D R . R O G E R S T . MLW MHW MLW MHW MHW SVL SVL -10 -10 -10 -10 -10 0 0 0 0 0 -12 -12 -12 -12 -4 -4 -4 -4 -4 -2 -2 -2 -2 -2 2 2 2 2 2 4 4 4 4 4 6 6 6 6 688 8 8 8 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 08 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 08 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 BEACH FILL - SITE PLAN STA. 110+00 TO 120+00 ATLANTIC OCEAN STA. 110+00 STA. 120+00 TOE OF FILL SEAWARD EDGE OF BERM (+7' NGVD) SECONDARY BERM (+10' NGVD) LEGEND BERM BERM SLOPE SECONDARY BERM PLANTING AREA PLANTING AREA NOTES: 1.SURVEY BY TI COASTA, DATED 4/20 & 8/20 (POST ISAIAS). 2.ELEVATIONS ARE BASED ON NGVD29, FT. 3.SVL-STATIC VEGETATION LINE, MHW-MEAN HIGH WATER, MLW-MEAN LOW WATER. 4.AERIAL TAKEN IN AUGUST 2021 BY APOLLO MAPPING 5.NO EXISTING ESTABLISHED DUNE VEGETATION WILL BE COVERED DURING THIS PROJECT. 6.PLANTING AREA INDEPENDENT OF FILL BUT MAY OVERLAP WITH FILL. 7.SECONDARY BERM HEIGHT TO MATCH LANDWARD BERM ELEVATION. MHW MLW 12.4 8.0 9.113.9 11.211.6 9.7 9.69.17.6 8.7 9.2 9.8 10.1 10.0 6.0 4.1 1.6 0.6 1.0 0.5 -0.4 -1.5 -2.8 -3.8 -5.0 -9.6 -9.3-8.9 -8.8 -8.8 -8.8 -8.6 -8.6 -8.5 -8.4 -8.4 -8.4 -8.3-8.2-8.2 -8.2 -8.2 -8.0-7.3-4.8-3.9 -3.4-2.8 -9.4 -9.0 -8.9 -8.8 -8.7 -8.6 -8.6 -8.5 -8.4 OCEAN BLVD W OCEAN BLVD W OCEAN BLVD W N E P T U N E D R . MLW MHW MLW MHW MHW SVL SVL -10 -10 -10 -10 0 0 0 0 0 -12 -12 -4 -4 -4 -4 -4 -2 -2 -2 -2 -2 2 2 2 2 2 4 4 4 4 4 6 6 6 6 68 8 8 8 8 -2 - 2 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 09 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 09 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 BEACH FILL - SITE PLAN STA. 130+00 TO 140+00 ATLANTIC OCEAN STA. 130+00 STA. 140+00 TOE OF FILL SEAWARD EDGE OF BERM (+7' NGVD) LEGEND BERM BERM SLOPE SECONDARY BERM PLANTING AREA PLANTING AREA SECONDARY BERM (+10' NGVD) -10.2 POST ISAIAS SURVEY POINTS (AUGUST 2020) NOTES: 1.SURVEY BY TI COASTA, DATED 4/20 & 8/20 (POST ISAIAS). 2.ELEVATIONS ARE BASED ON NGVD29, FT. 3.SVL-STATIC VEGETATION LINE, MHW-MEAN HIGH WATER, MLW-MEAN LOW WATER. 4.AERIAL TAKEN IN AUGUST 2021 BY APOLLO MAPPING 5.NO EXISTING ESTABLISHED DUNE VEGETATION WILL BE COVERED DURING THIS PROJECT. 6.PLANTING AREA INDEPENDENT OF FILL BUT MAY OVERLAP WITH FILL. 7.SECONDARY BERM HEIGHT TO MATCH LANDWARD BERM ELEVATION. MHW MLW 15.511.7 11.611.4 10.2 10.0 10.57.7 8.0 8.7 9.2 9.57.3 4.5 2.9 0.6 0.1 0.7 0.4 -0.4 -1.1 -2.7 -3.6 -4.2 -5.6 -7.6-7.2-6.7 -5.2 -4.1 -12.3 -11.6-11.4-11.0-10.8-10.5-10.2-9.9-9.7 -9.4-9.2-9.0-8.8 -8.8 -8.8 -8.8 -8.7 -8.7 -8.6 -8.6 -8.6 -8.6 -8.5 -8.5 -8.4 -8.2-8.0 -6.1 -4.6 -12.6 -12.0 -8.5 -8.5-8.4 -8.0 OCEAN BLVD W OCEAN BLVD W OCEAN BLVD W SA N F O R D S T . RA L E I G H S T . FA Y E T T E V I L L E S T . LU M B E R T O N S T . HI G H P O I N T S T . MLW MLW MHW MHW SVL SVL -10 -10 -10 -10 0 0 0 0 0 -12 -12 -4 -4 -4 -4 -4 -2 -2 -2 -2 -2 2 2 2 2 2 4 4 4 4 4 6 6 6 6 68 8 8 8 8 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 10 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 10 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 BEACH FILL - SITE PLAN STA. 150+00 TO 160+00 ATLANTIC OCEAN STA. 150+00 STA. 160+00 TOE OF FILL SEAWARD EDGE OF BERM (+7' NGVD) SECONDARY BERM (+10' NGVD) LEGEND BERM BERM SLOPE SECONDARY BERM PLANTING AREA PLANTING AREA NOTES: 1.SURVEY BY TI COASTA, DATED 4/20 & 8/20 (POST ISAIAS). 2.ELEVATIONS ARE BASED ON NGVD29, FT. 3.SVL-STATIC VEGETATION LINE, MHW-MEAN HIGH WATER, MLW-MEAN LOW WATER. 4.AERIAL TAKEN IN AUGUST 2021 BY APOLLO MAPPING 5.NO EXISTING ESTABLISHED DUNE VEGETATION WILL BE COVERED DURING THIS PROJECT. 6.PLANTING AREA INDEPENDENT OF FILL BUT MAY OVERLAP WITH FILL. 7.SECONDARY BERM HEIGHT TO MATCH LANDWARD BERM ELEVATION. MHW MLW 15.411.8 10.3 10.1 10.2 8.9 9.7 9.8 10.2 10.1 10.2 14.1 11.7 10.210.0 9.5 8.4 8.9 9.9 10.2 10.5 10.0 4.3 2.7 1.2 0.2 -0.3 -0.8 -1.4 -1.8 -2.6 -3.1 -3.9 -5.2 4.6 2.5 1.1 0.2 -0.6 -1.4 -2.2 -2.2 -2.1 -2.7 -2.8 -5.2 -7.8 -7.4 -6.6-5.8-5.1-4.3-3.7-3.3-2.9-2.7-2.4-2.1 -9.5-9.1-8.8 -8.8 -8.6-8.6 -8.4 -8.4 -8.4 -8.1 -8.1 -8.1-8.0 -8.0 -7.8-7.8 -7.8 -8.2 -7.7 -6.8 -5.1 -4.2 -2.4 -12.1 -11.7-11.1 -10.9-10.6-10.3 -10.2 -10.1 -9.7-9.5-9.4-9.3 -9.2 -9.2 -9.1-9.1 -9.0 -9.0 -9.0-9.0-8.8 -8.5 -8.4 -8.4 -8.3 -8.8 -8.2 -8.5 -3.2 -7.9 -7.2 -8.2 -3.5 -2.8 -7.6 -7.1 -9.0 -8.6 -8.4 -6.0 -4.5 -2.4 -11.8 OCEAN BLVD W OCEAN BLVD W OCEAN BLVD W GR E E N S B O R O S T . CH A R L O T T E S T . DU R H A M S T . BU R L I N G T O N S T . W SA L I S B U R Y S T . SA N F O R D S T . MLW MHW MHW SVL SVL -10 -10 -10 0 0 0 0 0 -12 -4 -4 -4 -4 -4 -2 -2 -2 -2 -2 2 2 2 2 2 4 4 4 4 4 6 6 6 6 688 8 8 8 8 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 11 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 11 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 BEACH FILL - SITE PLAN STA. 170+00 TO 180+00 ATLANTIC OCEAN STA. 170+00 STA. 180+00 TOE OF FILL SEAWARD EDGE OF BERM (+7' NGVD) SECONDARY BERM (+10' NGVD) EXISTING BEACH ACCESS AND STAGING LEGEND BERM BERM SLOPE SECONDARY BERM PLANTING AREA EXISTING PIER PLANTING AREA NOTES: 1.SURVEY BY TI COASTA, DATED 4/20 & 8/20 (POST ISAIAS). 2.ELEVATIONS ARE BASED ON NGVD29, FT. 3.SVL-STATIC VEGETATION LINE, MHW-MEAN HIGH WATER, MLW-MEAN LOW WATER. 4.AERIAL TAKEN IN AUGUST 2021 BY APOLLO MAPPING 5.NO EXISTING ESTABLISHED DUNE VEGETATION WILL BE COVERED DURING THIS PROJECT. 6.PLANTING AREA INDEPENDENT OF FILL BUT MAY OVERLAP WITH FILL. 7.SECONDARY BERM HEIGHT TO MATCH LANDWARD BERM ELEVATION. MHW MLW 14.3 11.7 10.49.1 10.4 8.4 8.6 9.5 9.9 10.1 10.29.47.75.7 3.4 2.0 1.2 0.0 -0.4 -1.1 -1.5 -1.8 -1.9 -2.8 -3.9 -5.1 -2.9-2.7-2.4 -9.0 -9.0 -9.0-9.0 -8.9 -8.9 -8.8 -8.8 -8.8 -8.8 -8.8 -8.8 -8.7 -8.3 -8.1 -7.8 -6.8 -5.4 -4.1-3.5 -7.3 -2.0 -8.8 -8.7 -8.3 -8.1 -6.2 -4.6 -2.0 OCEAN BLVD W OCEAN BLVD WLI O N S PA W D R . SC O T C H B O N N E T D R . MHW MLW MLW MHW MHW SVL SVL SVL -10 -10 -10 0 0 0 0 0 10 10 10 10 10 1010 -12 -12 -6 -6 -6 -6 -6 -4 -4 -4 -4 -4 -2 -2 -2 -2 -2 2 2 2 2 2 4 4 4 4 4 6 6 6 6 6 8 8 8 8 8 8 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 12 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 12 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 BEACH FILL - SITE PLAN STA. 190+00 TO 200+00 ATLANTIC OCEAN STA. 190+00 STA. 200+00 TOE OF FILL SEAWARD EDGE OF BERM (+7' NGVD) SECONDARY BERM (+10' NGVD) LEGEND BERM BERM SLOPE SECONDARY BERM PLANTING AREA PLANTING AREA -10.2 POST ISAIAS SURVEY POINTS (AUGUST 2020) NOTES: 1.SURVEY BY TI COASTA, DATED 4/20 & 8/20 (POST ISAIAS). 2.ELEVATIONS ARE BASED ON NGVD29, FT. 3.SVL-STATIC VEGETATION LINE, MHW-MEAN HIGH WATER, MLW-MEAN LOW WATER. 4.AERIAL TAKEN IN AUGUST 2021 BY APOLLO MAPPING 5.NO EXISTING ESTABLISHED DUNE VEGETATION WILL BE COVERED DURING THIS PROJECT. 6.PLANTING AREA INDEPENDENT OF FILL BUT MAY OVERLAP WITH FILL. 7.SECONDARY BERM HEIGHT TO MATCH LANDWARD BERM ELEVATION. MHW MLW 14.1 8.4 11.513.813.211.9 10.6 10.3 10.3 9.98.08.3 10.1 10.2 9.77.55.2 3.0 1.4 0.2 -0.5 -0.8 -0.9 -1.3 -1.9 -3.2 -4.2 -5.6 -9.4-9.2-8.9 -8.9 -8.8 -8.7 -8.6-8.4-8.2-7.8-7.4-6.7-6.0-4.9-4.3-3.8-3.3 -3.0-2.3 -11.7 -11.1 -10.6-10.3-10.1-9.9-9.7-9.6 -9.5 -9.4 -9.4 -9.3 -9.3 -9.3 -9.2 -9.2-9.2 -9.1 -9.1 -9.1 -9.1 -9.0 -8.7-8.6 -12.0 -11.4 -10.9 -9.5 OCEAN BLVD W OCEAN BLVD W OCEAN BLVD W SA N D D O L L A R D R . ST A R F I S H D R . MLW MLW MHW SVL SVL 0 10 -8 -6 -4 -2 24 6 8 -10 -10 -10 0 0 0 0 10 10 10 10 10 -12 -12 -8 -8 -8 -8 -6 -6 -6 -6 -4 -4 -4 -4 -2 -2 -2 -2 2 2 2 2 4 4 4 4 6 6 6 6 8 8 8 8 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 13 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 13 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 BEACH FILL - SITE PLAN STA. 210+00 TO 220+00 ATLANTIC OCEAN STA. 210+00 STA. 220+00 TOE OF FILL SEAWARD EDGE OF BERM (+7' NGVD) LEGEND BERM BERM SLOPE SECONDARY BERM PLANTING AREA PLANTING AREA -10.2 POST ISAIAS SURVEY POINTS (AUGUST 2020) NOTES: 1.SURVEY BY TI COASTA, DATED 4/20 & 8/20 (POST ISAIAS). 2.ELEVATIONS ARE BASED ON NGVD29, FT. 3.SVL-STATIC VEGETATION LINE, MHW-MEAN HIGH WATER, MLW-MEAN LOW WATER. 4.AERIAL TAKEN IN AUGUST 2021 BY APOLLO MAPPING 5.NO EXISTING ESTABLISHED DUNE VEGETATION WILL BE COVERED DURING THIS PROJECT. 6.PLANTING AREA INDEPENDENT OF FILL BUT MAY OVERLAP WITH FILL. 7.SECONDARY BERM HEIGHT TO MATCH LANDWARD BERM ELEVATION. SECONDARY BERM (ELEV. VARIES) MHW MLW 14.8 10.1 15.1 11.4 11.3 9.9 9.9 11.19.1 8.5 8.6 8.8 8.4 13.3 13.1 13.6 10.3 9.7 9.79.6 10.2 10.0 9.5 5.1 3.0 1.7 0.9 0.2 -0.4 -1.0 -1.6 -2.8 -3.9 -5.0 5.3 3.2 1.9 1.1 0.2 -0.5 -1.3 -1.6 -1.7 -2.7 -3.9 -4.9 -8.7 -8.6 -8.5 -8.4 -8.4 -8.1-8.0-7.5-7.1-6.7-6.3-5.6-4.8-4.1-3.6-3.0 -2.6 -9.1 -9.0 -9.0-8.9 -8.9 -8.9 -8.8 -8.8 -8.8 -8.8 -8.7 -8.7 -8.7 -8.6 -8.5-8.4 -2.1 -7.0-6.0 -9.4-9.1 -9.0 -9.0-9.0 -8.9 -8.9 -8.8 -8.8 -8.8 -8.6 -8.6 -8.5 -8.5 -8.5 -8.4 -8.4 -8.4 -8.3 -8.3 -8.1 -8.0 -5.1-4.6-3.9 -8.9 -8.8 -11.1-10.9-10.6-10.3-10.0 -9.5 -8.8 -8.8 -8.7 -9.8 OCEAN BLVD W OCEAN BLVD W OCEAN BLVD W MLW MHW MLW MLWMHW SVL S V L -10 -10 -10 0 0 00 10 10 10 10 -12 - 8 -8 -8 -8 -8 -6 -6 -6-6 -4 -4 -4-4 -2 -2 -2 -2 2 2 2 2 4 4 4 4 6 6 6 6 8 88 8 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 14 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 14 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 BEACH FILL - SITE PLAN STA. 230+00 TO 240+00 ATLANTIC OCEAN STA. 230+00 STA. 240+00 TOE OF FILL SEAWARD EDGE OF BERM (+7' NGVD) EXISTING BEACH ACCESS AND STAGING AREA LEGEND BERM BERM SLOPE SECONDARY BERM PLANTING AREA PLANTING AREA NOTES: 1.SURVEY BY TI COASTA, DATED 4/20 & 8/20 (POST ISAIAS). 2.ELEVATIONS ARE BASED ON NGVD29, FT. 3.SVL-STATIC VEGETATION LINE, MHW-MEAN HIGH WATER, MLW-MEAN LOW WATER. 4.AERIAL TAKEN IN AUGUST 2021 BY APOLLO MAPPING 5.NO EXISTING ESTABLISHED DUNE VEGETATION WILL BE COVERED DURING THIS PROJECT. 6.PLANTING AREA INDEPENDENT OF FILL BUT MAY OVERLAP WITH FILL. 7.SECONDARY BERM HEIGHT TO MATCH LANDWARD BERM ELEVATION. SECONDARY BERM (ELEV. VARIES) MHW MLW NO FILL PLACED 12.5 15.6 9.1 11.4 11.9 11.3 10.1 8.4 8.7 9.1 9.3 9.27.5 4.3 2.4 1.1 0.4 -0.2 -0.6 -1.2 -2.0 -2.3 -2.6 -2.9 -4.2 -5.1 -8.9 -8.8 -9.1 -8.6 -8.9 -8.6-8.8 -8.6 -8.5 -8.5 -8.4 -8.4 -8.3 -8.2 -8.1 -8.1 -8.1 -7.9 -7.4-6.4-5.3-4.5-3.9-3.3-2.9-2.6-2.4 -8.7 -8.6 -8.6 -8.7-8.6 -8.5 OCEAN BLVD W OCEAN BLVD W OCEAN BLVD W MLW MLW MLW MHW MHW SVL SVL -8 -6 -4 -2 0 2 46 8 12 1210 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 15 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 15 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 BEACH FILL - SITE PLAN STA. 250+00 TO 260+00 ATLANTIC OCEAN STA. 250+00 STA. 260+00 TOE OF FILL SEAWARD EDGE OF BERM (+7' NGVD) LEGEND BERM BERM SLOPE SECONDARY BERM PLANTING AREA EXISTING BEACH ACCESS AND STAGING AREA -10.2 POST ISAIAS SURVEY POINTS (AUGUST 2020) NOTES: 1.SURVEY BY TI COASTA, DATED 4/20 & 8/20 (POST ISAIAS). 2.ELEVATIONS ARE BASED ON NGVD29, FT. 3.SVL-STATIC VEGETATION LINE, MHW-MEAN HIGH WATER, MLW-MEAN LOW WATER. 4.AERIAL TAKEN IN AUGUST 2021 BY APOLLO MAPPING 5.NO EXISTING ESTABLISHED DUNE VEGETATION WILL BE COVERED DURING THIS PROJECT. 6.PLANTING AREA INDEPENDENT OF FILL BUT MAY OVERLAP WITH FILL. 7.SECONDARY BERM HEIGHT TO MATCH LANDWARD BERM ELEVATION. SECONDARY BERM (ELEV. VARIES) MHW MLW NO FILL PLACED MINOR FILL PLACED 12.2 14.3 11.9 11.2 9.28.7 9.2 9.2 9.7 9.6 4.5 2.8 1.7 0.8 0.1 -0.5 -0.9 -1.4 -1.9 -2.3 -2.6 -7.8 -7.8 -6.9 -9.9 -9.5 -9.0 -8.7 -8.5 -8.5 -8.3 -8.3 -8.2 -8.2 -8.1 -8.0 -5.7 -4.2 -3.3 -8.6 -11.7 -10.9 -10.4 -8.5 OCEAN BLVD W OCEAN BLVD W SW O R D F I S H D R . MLW MLW MHW MHW -12 -10 -8 -6 -4 0-2 2 4 68 10 12 12 1210 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H B _ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g _ N G V D _ R E V 0 5 . d w g 16 5/ 1 6 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 16 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. AS-BUILT 16-MAY-2022 BEACH FILL - SITE PLAN STA. 270+00 TO 280+00 ATLANTIC OCEAN STA. 270+00 STA. 280+00 TOE OF FILL SEAWARD EDGE OF BERM (+7' NGVD) LEGEND BERM BERM SLOPE SECONDARY BERM PLANTING AREA Adjacent Owner: ALLEN MARK W ETUX SHELLEY H Mailing Address: 5207 CLIPPER COVE ROAD MIDLOTHIAN, VA 23112 -10.2 POST ISAIAS SURVEY POINTS (AUGUST 2020) NOTES: 1.SURVEY BY TI COASTA, DATED 4/20 & 8/20 (POST ISAIAS). 2.ELEVATIONS ARE BASED ON NGVD29, FT. 3.SVL-STATIC VEGETATION LINE, MHW-MEAN HIGH WATER, MLW-MEAN LOW WATER. 4.AERIAL TAKEN IN AUGUST 2021 BY APOLLO MAPPING 5.NO EXISTING ESTABLISHED DUNE VEGETATION WILL BE COVERED DURING THIS PROJECT. 6.PLANTING AREA INDEPENDENT OF FILL BUT MAY OVERLAP WITH FILL. 7.SECONDARY BERM HEIGHT TO MATCH LANDWARD BERM ELEVATION. SECONDARY BERM (ELEV. VARIES) MHW MLWNO FILL PLACED NO FILL THIS STATION 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 54.8' 11.4' 393.9' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 +10.0' PLANTING AREA 226.1' 44.6' 574.2' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 +10.0' PLANTING AREA 181.4' 28.9' 441.5' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 +10.0' PLANTING AREA 200.9' 30.0' 483.1' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 +10.0' PLANTING AREA 237.7' 50.0' 466.9' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 +10.0' PLANTING AREA NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H o l d e n _ M o n i t o r i n g _ p r o f i l e s _ R E V 0 1 . d w g 17 5/ 1 6 / 2 2 FOR PERMITTING PURPOSES ONLY "NOT FOR CONSTRUCTION" PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 17 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILT 16-MAY-2022 PROPOSED BEACH FILL PROFILES-STA.: 30+00 TO 80+00 STATION 30+00 STATION 40+00 STATION 60+00 STATION 80+00STATION 70+00 STATION 50+00 2020 MON. SURVEY 2020 MON. SURVEY 2020 MON. SURVEY 2020 MON. SURVEY POST ISAIAS POST ISAIAS SECONDARY BERM BEACH FILL TEMP.SECONDARY BERM SECONDARY BERM SECONDARY BERM SECONDARY BERM BEACH FILL TEMP. BEACH FILL TEMP. BEACH FILL TEMP. BEACH FILL TEMP. NOTES: 1.SURVEY PERFORMED BY TI COASTAL, DATED APRIL 2020 FOR ANNUAL MONITORING. 2.SURVEY PERFORMED BY EAST COAST ENGINEERING & SURVEYING, P.C. POST HURRICANE ISAIAS (AUGUST 15, 2020) EVERY 3RD STATION. 3.ELEVATIONS ARE BASED ON NGVD29, FT. AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. NOTE: MCKIM AND CREED PRE-CONSTRUCTION SURVEYS IN BLUE DATED JAN. - MAR. 2022. 194.4' 20.0' 482.6' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 +10.0' PLANTING AREA 211.4' 40.0' 483.8' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 +10.0' PLANTING AREA 148.7' 20.0' 497.1' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 PLANTING AREA 145.3' 20.0' 479.2' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 +10.0' PLANTING AREA 118.6' 20.0' 486.8' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 +10.0' PLANTING AREA 179.8' 60.9' 485.1' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 +10.0' PLANTING AREA NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H o l d e n _ M o n i t o r i n g _ p r o f i l e s _ R E V 0 1 . d w g 18 5/ 1 6 / 2 2 FOR PERMITTING PURPOSES ONLY "NOT FOR CONSTRUCTION" PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 18 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILT 16-MAY-2022 PROPOSED BEACH FILL PROFILES-STA.: 90+00 TO 140+00 STATION 90+00 STATION 100+00 STATION 120+00 STATION 140+00STATION 130+00 STATION 110+00 2020 MON. SURVEY POST ISAIAS SECONDARY BERM BEACH FILL TEMP. SECONDARY BERM SECONDARY BERM SECONDARY BERM SECONDARY BERM (+9.0') SECONDARY BERM 2020 MON. SURVEY 2020 MON. SURVEY 2020 MON. SURVEY POST ISAIAS BEACH FILL TEMP. BEACH FILL TEMP.BEACH FILL TEMP. BEACH FILL TEMP. BEACH FILL TEMP. NOTES: 1.SURVEY PERFORMED BY TI COASTAL, DATED APRIL 2020 FOR ANNUAL MONITORING. 2.SURVEY PERFORMED BY EAST COAST ENGINEERING & SURVEYING, P.C. POST HURRICANE ISAIAS (AUGUST 15, 2020) EVERY 3RD STATION. 3.ELEVATIONS ARE BASED ON NGVD29, FT. AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. NOTE: MCKIM AND CREED PRE-CONSTRUCTION SURVEYS IN BLUE DATED JAN. - MAR. 2022. 108.2' 30.0' 486.7' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 +10.0' PLANTING AREA 178.2' 66.4' 501.1' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 +10.0' PLANTING AREA 119.0' 30.0' 501.0' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 +10.0' PLANTING AREA 143.2' 30.0' 522.1' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 +10.0' PLANTING AREA 110.3' 475.1' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 PLANTING AREA +10.0' 30.0' 158.9' 53.8' 462.9' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 +10.0' PLANTING AREA NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H o l d e n _ M o n i t o r i n g _ p r o f i l e s _ R E V 0 1 . d w g 19 5/ 1 6 / 2 2 FOR PERMITTING PURPOSES ONLY "NOT FOR CONSTRUCTION" PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 19 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILT 16-MAY-2022 PROPOSED BEACH FILL PROFILES-STA.: 150+00 TO 200+00 STATION 150+00 STATION 160+00 STATION 180+00 STATION 200+00STATION 190+00 STATION 170+00 2020 MON. SURVEY POST ISAIAS SECONDARY BERM BEACH FILL TEMP. BEACH FILL TEMP. BEACH FILL TEMP.BEACH FILL TEMP. BEACH FILL TEMP. BEACH FILL TEMP. 2020 MON. SURVEY 2020 MON. SURVEY 2020 MON. SURVEY POST ISAIAS SECONDARY BERM SECONDARY BERM SECONDARY BERM SECONDARY BERM NOTES: 1.SURVEY PERFORMED BY TI COASTAL, DATED APRIL 2020 FOR ANNUAL MONITORING. 2.SURVEY PERFORMED BY EAST COAST ENGINEERING & SURVEYING, P.C. POST HURRICANE ISAIAS (AUGUST 15, 2020) EVERY 3RD STATION. 3.ELEVATIONS ARE BASED ON NGVD29, FT. AS-BUILTS AS-BUILTS NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. NOTE: MCKIM AND CREED PRE-CONSTRUCTION SURVEYS IN BLUE DATED JAN. - MAR. 2022. 91.4' 452.1' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 PLANTING AREA 30.0' 158.8' 458.0' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 PLANTING AREA 33.9' 95.5' 446.0' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 PLANTING AREA 30.0' 83.8' 442.0' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 PLANTING AREA 30.0' 61.1' 421.5' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 PLANTING AREA 30.0' 112.4' 418.1' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 PLANTING AREA 36.2' NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H o l d e n _ M o n i t o r i n g _ p r o f i l e s _ R E V 0 1 . d w g 20 5/ 1 6 / 2 2 FOR PERMITTING PURPOSES ONLY "NOT FOR CONSTRUCTION" PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 20 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILT 16-MAY-2022 PROPOSED BEACH FILL PROFILES-STA.: 210+00 TO 260+00 STATION 210+00 STATION 220+00 STATION 240+00 STATION 260+00STATION 250+00 STATION 230+00 2020 MON. SURVEY POST ISAIAS BEACH FILL TEMP. POST ISAIAS BEACH FILL TEMP. BEACH FILL TEMP.BEACH FILL TEMP. BEACH FILL TEMP. BEACH FILL TEMP. 2020 MON. SURVEY 2020 MON. SURVEY 2020 MON. SURVEY NOTES: 1.SURVEY PERFORMED BY TI COASTAL, DATED APRIL 2020 FOR ANNUAL MONITORING. 2.SURVEY PERFORMED BY EAST COAST ENGINEERING & SURVEYING, P.C. POST HURRICANE ISAIAS (AUGUST 15, 2020) EVERY 3RD STATION. 3.ELEVATIONS ARE BASED ON NGVD29, FT. SECONDARY BERM SECONDARY BERM SECONDARY BERM SECONDARY BERM SECONDARY BERM SECONDARY BERM AS-BUILTS AS-BUILTS NO FILL PLACED NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. NOTE: MCKIM AND CREED PRE-CONSTRUCTION SURVEYS IN BLUE DATED JAN. - MAR. 2022. NO FILL PLACED MINOR FILL PLACED 74.9' 422.7' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 30.0' 46.5' 328.3' +7.0' 1V:15H 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 NO FILL THIS STATION 0 1000 -10 0 10 20 EL E V . ( F T - N G V D ) 200 400 600 800 DISTANCE (FT) MHW: +2.9 MLW: -1.9 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ H o l d e n _ M o n i t o r i n g _ p r o f i l e s _ R E V 0 1 . d w g 21 5/ 1 6 / 2 2 FOR PERMITTING PURPOSES ONLY "NOT FOR CONSTRUCTION" PROPOSED BEACH FILL PROFILES-STA.: 270+00 TO 300+00 STATION 270+00 STATION 280+00 STATION 290+00 2020 MON. SURVEY POST ISAIAS BEACH FILL TEMP.BEACH FILL TEMP. PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32 48 16.52 N LONGITUDE:79 45 32.00 W November 18, 2020 SHEET 21 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILT 16-MAY-2022 NOTES: 1.SURVEY PERFORMED BY TI COASTAL, DATED APRIL 2020 FOR ANNUAL MONITORING. 2.SURVEY PERFORMED BY EAST COAST ENGINEERING & SURVEYING, P.C. POST HURRICANE ISAIAS (AUGUST 15, 2020) EVERY 3RD STATION. 3.ELEVATIONS ARE BASED ON NGVD29, FT. SECONDARY BERM AS-BUILTS AS-BUILTS NO FILL PLACEDNO FILL PLACED NOTE: MCKIM AND CREED AS-BUILT SURVEYS IN RED DATED FEB. - APR. 2022. NOTE: MCKIM AND CREED PRE-CONSTRUCTION SURVEYS IN BLUE DATED JAN. - MAR. 2022. AS-BUILT VOLUMES 6.94.9 16.7 24.0 4.9 4.9 12.8 24.9 6.9 28.9 28.9 30.8 30.8 27.9 26.9 26.9 30.8 25.9 22.0 26.9 23.0 3.0 2.0 28.9 27.9 31.8 32.8 30.8 23.0 1.0 27.927.927.9 22.0 25.9 22.0 21.0 26.9 22.0 22.0 21.0 21.0 1.0 6.99.8 27.9 6.9 27.9 9.8 30.8 21.0 30.8 31.8 30.8 28.9 28.9 32.8 30.8 28.9 30.8 30.8 31.8 32.8 42.0 42.0 40.7 40.7 39.7 36.7 39.7 34.8 33.8 34.8 36.7 38.7 37.7 37.7 37.7 37.7 35.8 36.7 31.8 31.8 32.8 40.7 38.7 39.7 40.7 40.7 38.7 43.0 39.7 42.0 37.7 33.8 31.8 32.8 34.8 30.8 36.7 33.8 33.8 37.7 32.8 34.8 30.8 34.8 33.8 37.7 38.7 36.7 31.8 36.7 34.8 39.7 40.7 36.7 42.0 33.8 38.7 36.7 32.8 33.8 31.8 32.8 33.8 34.8 35.8 35.8 37.7 36.7 37.7 39.7 13.8 30.8 25.9 28.9 23.0 24.0 39.7 42.0 38.7 40.7 34.8 32.8 32.8 39.736.7 42.0 40.7 37.7 40.7 38.7 37.7 34.8 33.8 32.8 30.8 28.9 31.8 32.8 35.8 36.7 37.7 38.7 36.7 30.8 31.8 31.8 35.8 33.8 32.8 32.8 30.8 38.7 19.7 28.9 19.7 25.9 25.9 31.8 32.8 0.3 33.8 36.7 36.7 37.7 36.7 39.7 39.7 42.0 42.0 37.7 40.7 36.7 34.8 34.8 NO T E : T H E S E D R A W I N G S A N D D E S I G N S A R E S T R I C T L Y C O N F I D E N T I A L A N D P R O T E C T E D B Y I N T E R N A T I O N A L C O P Y R I G H T L A W . D E T A I L S M U S T N O T B E D I S C L O S E D , R E P R O D U C E D O R C O M M U N I C A T E D T O A 3 r d P A R T Y I N AN Y F O R M O R M A N N E R W I T H O U T T H E P R I O R W R I T T E N A P P R O V A L O F A P P L I E D T E C H N O L O G Y & M A N A G E M E N T . O: \ P r o j e c t s \ 0 8 - 1 6 8 7 H o l d e n B e a c h - S t o n e C h i m n e y R o a d \ D W G \ 2 0 2 0 _ N o u r i s h m e n t _ P e r m i t t i n g \ x r e f \ _ B A _ C R R . d w g 22 5/ 1 1 / 2 2 PROJECT:Holden Beach Renourishment WATERBODY:Atlantic Ocean COUNTY:Brunswick STATE:North Carolina LATITUDE:32°48'16.52"N LONGITUDE:79°45'32.00"W November 18, 2020 SHEET 22 Applicant: Town of Holden Beach Applicant Street: 110 Rothschild Street Applicant City, State: Holden Beach, NC AS-BUILT 16-MAY-2022 BORROW AREA OVERVIEW ATLANTIC OCEAN BORROW AREA 1 NOTES: 1.CONTOURS AND 3 MILE NAUTICAL LINE BASED ON GIS DATA AVAILABLE ON NOAA'S ENC WEBSITE. 2.ELEVATIONS OUTSIDE OF BORROW AREA BASED ON NOAA ENC WEBSITE AND REFERENCE MLW BEACH FILL TEMPLATE BORROW AREA 2 ~2 MILES ~5 MILES BORROW AREA 1: (PREVIOUSLY DREDGED FOR 2017 NOURISHMENT) HOLDEN BEACH OAK ISLAND 3 NAUTICAL MILE OFFSHORE LINE -30 -30 -30 -20 -20 -20 -10 -10 -10 AS-BUILTS AS-BUILTS 304 Gaille Dr Covington, LA 70433-9125 DREDGING - MARINE CONSTRUCTION - MARINE TRANSPORTATION WM I # Dr e d g e SU R V E Y D A T E PR O J E C T N O . SH E E T DR A W N B Y : 1 (985) 875-2500 RN / B E WM I SA W - 2 0 1 2 - 0 0 2 8 6 20 2 2 . 0 2 . 1 6 13 2 1 0 0 6 1 Holden Beach Renourisment Holden Beach, NC 1"=200' 304 Gaille Dr Covington, LA 70433-9125 DREDGING - MARINE CONSTRUCTION - MARINE TRANSPORTATION WM I # Dr e d g e SU R V E Y D A T E PR O J E C T N O . SH E E T DR A W N B Y : 1 (985) 875-2500 RN / B E WM I SA W - 2 0 1 2 - 0 0 2 8 6 20 2 2 . 0 4 . 2 2 13 2 1 0 0 6 1 Holden Beach Renourisment Holden Beach, NC