HomeMy WebLinkAboutGP EX - Rodanthe Pier, LLC - 10-17-2024Sj
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environmental Quality and the Coastal ResourcesSommission In an area of
environmental concern pursuant to 15 NCAC Subchapter 2K L3or NCGS 113A-103 (5) (b) (5)_.
ApplicantNarne wt,cQ-n-i-k-. P�cnf r Phone Number __5 6,/Y_8S9a
City E/: s- Lx i l �I•(� State Nc_ Zip Z27 t:
m V 2si A�l��i�� r:
Projactl.ocat(on/LC,ounty,State Road, Water Body,etc.) 2f �
`A I- � , i-i <. 6,-------
The proposed project to be located and constructed as
described above Is hereby certified as exempt from the
CAMA permit requirements. This exemption to CAMA
permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local
authorization.+k r�a(`r c�u,.•1-y 0I11. poun }-
This certification of exemption from requiring a CAMA permit
Is valid for 120 days from the date of Issuance. Following
expiration, a re-examination of the projectand project site may
be necessary to continue this certification.
SCALE: /J T-,S
__
1 I 1 I 1 I I I I 1 I 1 I 1 1 1 I 1 1 1 1 I I
I 1 I 1 1 I I 1 I 1 1 I I 1 1 1 I I 1 I 1 I I
1 1 1 1 1 I I I 1 1 1 1 1 I 1 I I I I 1 1 I I
h __}__;__L__T_
1 1 1 1 I 1 I I 1 I I 1 I 1 I 1 1 1 1 I 1 I I I
I 1 1 1 I 1 I I 1 1 I I 1 I I 1 1 I I f I I 1
--F_•'T--T--T-_T--T_-Y__t__Y__r^_T_.'F-•i---T--T-^r^-T^-r--T-
I 1 I 1 I 1 1 I 1 1 I I 1 1 I 1 I 1 I I I I 1
--------.--. 1 1 1 1 1 1 1 1 1 I I I I I I
Any person who proceeds with a development without the con- XC s,�"j`�/,
sent of a CAMA official under mistaken assumption that the Applicant's s
development is exempted, will be in violation of the CAMA If there
is a subsequent determination that a permit was required for the
development. �A A01flai
The applicant certifies by signing this exemption that the / o /r ,
applicant will abide by the conditions of this exemption. Issuing date
1
1 1 I I 1 1
--r-r--r--r- r-^rx
I 1
1 I I I I I 11
1 I I 1 I I 1
I 1 1 1 I 1 it
1 1 I 1 1 1 1
I 1 I I I 1 1
signature
2419
Expiration Dale
CERTIFICATION OF EXEMPTION
Applicant Name
Address i 0 (�
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environmental Quality and the Coastal ResourcsGommission in an area of
environmental concern pursuant to 15 NCAC Subchapter 71<o a3or NCGS 113A-103 (5) (b) (5)_
Phone Number2S2-��9-859�
City State N� v Zip 22F b�
Project Location County, StateRoad,WaterBody,etc.) �� BSI Rf�� •{s` mr��<c�R }�e�
yj; /L! 2F car �av
rM1.
The proposed project to be located and constructed as
described above is hereby certified as exempt from the
CAMA permit requirements. This exemption to CAMA
permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local
authorization.*pG(`e Couny ( 13 Pecr�
This certification of exemption from requiring a CAMA permit
is valid for 120 days from the date of issuance. Following
expiration, a re-examination of the project and project site may
be necessary to continue this certification.
AEC(S): 6 J4 SCALE: A) -T-S
--------------i-----i--�--�--i--�--i--�--i --i----i--i--i--i--�--i
1 I ' 1 I 1 1 1 1 1 I 1 1 1 I I I I 1 I I I I I I I 1 I
1 1 I I 1 I I 1 I 1 1 1 1 1 I 1 I I 1 I 1 I 1 I 1 I I
I I I I 1 1 I 1 1 I 1 1 I 1 1 I I I I 1 I 1 I 1 I I�I I
n r--r-- --r--+- r--r--+--t--*--r--+--*--r--*--r--r--r-ti---t--+--+--*--r--r--r--r--r--+
1 I 1 I 1 1 I 1 1 I 1 I I I 1 I I I I 1 I I I 1 1 1 I 1
I I 1 I 1 1 1 1 I 1 I I I 1 1 I I 1 I 1 I 1 I 1 1 I 1
r--r----r--r- r--r--r--r--r--r--t--*--r--r--r--r--r--1---t--r--r--r--r--r--r--r--r--�
I 1 1 I I 1 I I 1 I I I 1 I 1 I I 1 I 1 I 1 I I I I 1
I 1 I I
r--r----r--r----r--r--r--r--r--r--�--r--r--r--r-r-r--r--r--r-r-r--r--r--r--r -�
I 1 1 1 1 1 I I 1 I 1 1 I 1 1 I 1 I I I I 1 I I I I 1 I
1 I I 1 1 I 1 1 I I I 1 I 1 I 1 I I 1 I I I 1 I 1 r I
r--r----r--r---r--r--r--r--r--r---r--r--T--r--r--r-�---r--r--r--T--r--r--r- r-- --i
1 I 1 I I 1 1 1 1 I 1 I 1 I 1 I I I 1 1 1 I 1 1 1 1 1�% I
-I I 1 I 1 I 1 I
r--r-- r--r- r--r--r--r--r--r--r----r--r--r-I-Sr r----r--r- r--r--r--r--r- r--ram-i
I 1 K1 I I 1 I 1 I 1 I 1 L1 I
1 1 I 1 I I I I I I 1 I 1 1 I 1 I 1 1 I I I 1
1 1 1 I I I 1 1 I A I p I I I I I- 1 I I I I 1 I n 1
T--r--T -r-I---T----r--r--I--I--r--r--1
L
1 I 1 I I I
I III �I 1 UTA I I I I 1 I I I 1 I 1 I 1 I I I 1 I I I I I I
__L I`[A_ L rL_ L__1__L__1__L__L__1__L__1__L__1__L_J___1__1__1__1__L__1__L _L__ _J
�q
N 1 I 1 1 I 1 I 1 1 I I 1 I 1 I I 1 I I I 1 I 1 1 I
1 I 1
L__L AL __1_ __L__L__L__1 __L __1__1__L__1__L__1 L_J___1__1__1__1__L__1__L_ 1�
L__ J
I 1 �IxG I I 1 1 1 I I I I I I I�L I 1 1 I I 1 I 1 1 1
I 1 1�N I I 1 1 1 I 1 I I 1 1 1 VC I 1 I 1 I 1 I 1 I 1 1
L__L_ � `,L__L_ L__L__1__L__L__L__1__1__L__1♦y_L__1__ _J___1__1__1__1__L__1__L _L__L__J
I I 1 I I I I I I I I I IM I I I I I I I 1 I I I I
+-_4-_+-_L__+__i__4-
�q1 1 1 I I I 1 1 1 I I 1 I I 1 1 1 I I 1 I I I 1 I I I 1 I
Any person who proceeds with a development without the con-
sent of a CAMA official under mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that the
applicant will abide by the conditions of this exemption.
0
Applicant's signature
li
LLJTiitn__
A Official's signature
l ,zi L /2 Y !', 2-/. ? /2-s
Issuing dale Expiration Date
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environmental Quality and the Coastal Resources Commission in an area of
environmental concern pursuant to 15 NCAC Subchapter 7K or NCGS 113A-103 (5) (b) (5)
ApplicantName
City
Project Location (County, State Road, Water Body, etc.)
Type and Dimensions of Project
The proposed projectto be located and constructed as
described above is hereby certified as exempt from the
CAMA permit requirements. This exemption to CAMA
permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local
authorization.
Phone Number
State
Zip
This certification of exemption from requiring a CAMA permit
is valid for 120 days from the date of issuance. Following
expiration, a re-examination of the project and project site may
be necessary to continue this certification.
AEC(S): SCALE:
•-----------------�----- �----- -----------T--i---- -
I I I I I I I 1 I 1 I I I I I I I I I I I I I I I I I I I
I I 1 I I I I 1 I 1 I I I I I I 1 I I 1 I I I I I I I I I
I I I 1 i I 1 1 I 1 I I I I I I I 1 I 1 I I I I I I I I I
I I I I I I I I I 1 I I I I I I I i I I I I I I I I I I I
r--r--r--r--t--r--r--r--r--+--r--+--y--r--+--r--+--r-y---t--t--+--+--r--+--r--r--r--i
I I I 1 1 I 1 I I I I I I I I I I I I 1 I I I I I I I 1 I
I I I 1 I 1 1 I I I I I I I I I I I I 1 I I I I I I I 1 I
r--r--r--r--r--r--r--r--r--r--r--r--+--r--r--r--r--r--1---r--r--r-r-r--r--r--r--r--�
I I I I I 1 I I 1 I I I 1 I I 1 I I I I I I I I I I 1 1 I
r--r--r--r--r--r--r--r--r--r--r--r---1--r--r-r-r-r-r--r--r--r--r-r--r--r--r--r--7
I I I I I 1 I I I I I I I 1 I I I I I I 1 I I 1 I I 1 I I
r--r--r--r--r--r--r--r--r--r--r--r--�--r--�--r--r--r-�---r--r--r--r-r--r--r--r--r--i
I I I 1 I I I 1 I I I I
r--r-- r--r--r--r--r--r--r--r--r--�--r--�--r--r--r-�---r--r--r--r--r--r--r`r--r--i
r--r--r--r--r--r--r--r--r--r--r--r--i--r--r--r--r--r-�---r--r--r--r--r--r--r—r--r--t
I__I 1 II_-_1 I I 11
I r--r--r__I r-_r--r--r__1
L__L_.L__L_-1__L__L__L__L__1__L__1__T__L__1__L__1__L_J___1__1__1__1__L__1__L__L__L__1
11 _1 1 II I I I I I I I I I I 1 I I I 1 I I I I I I 1 1 I
I I 1 1 I I I I I I I I I I I I I I I I 1 I I I I I I I I
I I 1 1 1 I I 1 I 1 I I I I I I I I I 1 1 I I I I I I I I
i I 1 I I I I I I I I I I I I I I I I 1 I I I I 1 1 I I 1
i I 1 I I 1 I I I I I I I I I I I 1 1 I I I I I 1 1 I I i
I 1 1 I I I I I 1 I I I I I I I I 1 I 1 I I I I 1 I I I I
I i I I I 1 I I I I 1 I I I I I I 1 I 1 I I I I 1 I I I I
I I I 1 I I I I I I I I 1 I I 1 I I I I I I I I I I 1 I I
I I I I I I I I I I I I I I I I I I I I I I I I I I 1 1 I
I I 1 1 I 11 1 I I I 1 I 1 1 1 I I I I I I I I I I I 1 I
Any person who proceeds with a development without the con-
sent of a CAMA official under mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that the
applicant will abide by the conditions of this exemption.
Applicant's signature
CAMA Official's signature
Issuing date Expiration Date
!
|
§2«lu�m2
!§!|3!!!
}!
)
{ j
)
�s�
sa
§�22
,
}
;!!!
�
r
x1251 lLaroc o-, RaEarNe,4c—him
�
6cI LYtttbM HkLW — --y
zaz5]Ananuc or
W.n nn snw.INv_R01).c . t
d 0 d - xcnorm_m«xn_mn
• Posces {7 . o«a�og MV
a RyP , •4ror272700 '
6. kU
1pY4MY
.n tINaXWUf43dLCMIWa 3}O])9111191
S.Y tl11 b x015 Un PmM
R ♦ Svl«eLYe1MbS9(KeMns
� a
v ♦�o«e County A.. .. ---
r sore CouMywaroga- P.leu l.lnv
r ♦Sncm«.apP«cxL 11 � �� ym�a ]d[ -g PN , E f^:A �P.
R O sYGlllIgLOL«N) � L
• a swbngwLmaaLmx ,3 e l � S � - 'e• �. ,
op a
„i
T ✓
• L.vm ' l l J I ]
v vnmary 4etosau .�.._.. a 1.Y /
I � 4y«4olLuunfxO211 I' •"'9L1 _ft
R ♦ p X«ena«�aLmne • `� ♦ �� •
♦ ®wces a r .� a tiffs / i :' l
)D sum",
ary' r •
DATE:
10/13/2024
INVOICE #
CUSTOMER ID:
INVOICE
TO:
RECEIVED
OCT 16 2024
DCM-EC
Rodanthe Pier
24251 Atlantic Dr
Rodanthe , NC 27973
SALESPERSON JOB PAYMENT TERMS
Oscar Ward Sales Estimate Only
CITY DESCRIPTION
N/A Misc material: Fasteners, Metal, Etc....
N/A '.. Replace 6 pylons and repair any damaged structure found
Thank you for your business!
DUE DATE
10/13/2024
UNIT PRICE
LINE TOTAL
N/A
750.00
N/A
19250.00
Carver, Yvonne
From:
KD Jackson <kd.jackson@darenc.gov>
Sent:
Wednesday, October 16, 2024 2:31 PM
To:
Carver, Yvonne
Subject:
[External] Fwd: Piling work at Rodanthe Pier
Attachments:
Estimate for Rodanthe Pier 2024.docx
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
I got this the other day and I left a message on your phone but the piling replacement is in the water and
that's not my jurisdiction so I am emailing you this and you may want to contact Mr Plumbee because I
believe they guy coming this weekend to do the work.
Forwarded message
From: Rodanthe Pier <rodanthepierllc@gmaiL com>
Date: Mon, Oct 14, 2024 at 1:50 PM
Subject: Piling work at Rodanthe Pier
To: kd.jacksonCaldarenc.gov<kd.jackson(ddareno,gov>
Hi KD,
Thanks fortalking with me the other day. Attached is an estimate for the work we discussed.
Thanks, Terry
Rodanthe Pier LLC
www.rodanthepierllc.com
6— /11' A' J 6 4, •\ V I L l< A I t o&J r-1 c—E—'
�p4S8�3€�ig�@
x
TIMMONS GROUP...
NORT CAROLINA LICENSE NO C-1652 •' ` • w.«a �fF ^ w.
i CAMA PERMIT DRAWING FOR RODANTHE PIER, LLC 3 E g d $ 4
,,�
z