Loading...
HomeMy WebLinkAboutGP EX - Rodanthe Pier, LLC - 10-17-2024Sj CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environmental Quality and the Coastal ResourcesSommission In an area of environmental concern pursuant to 15 NCAC Subchapter 2K L3or NCGS 113A-103 (5) (b) (5)_. ApplicantNarne wt,cQ-n-i-k-. P�cnf r Phone Number __5 6,/Y_8S9a City E/: s- Lx i l �I•(� State Nc_ Zip Z27 t: m V 2si A�l��i�� r: Projactl.ocat(on/LC,ounty,State Road, Water Body,etc.) 2f � `A I- � , i-i <. 6,------- The proposed project to be located and constructed as described above Is hereby certified as exempt from the CAMA permit requirements. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal, or Local authorization.+k r�a(`r c�u,.•1-y 0I11. poun }- This certification of exemption from requiring a CAMA permit Is valid for 120 days from the date of Issuance. Following expiration, a re-examination of the projectand project site may be necessary to continue this certification. SCALE: /J T-,S __ 1 I 1 I 1 I I I I 1 I 1 I 1 1 1 I 1 1 1 1 I I I 1 I 1 1 I I 1 I 1 1 I I 1 1 1 I I 1 I 1 I I 1 1 1 1 1 I I I 1 1 1 1 1 I 1 I I I I 1 1 I I h __}__;__L__T_ 1 1 1 1 I 1 I I 1 I I 1 I 1 I 1 1 1 1 I 1 I I I I 1 1 1 I 1 I I 1 1 I I 1 I I 1 1 I I f I I 1 --F_•'T--T--T-_T--T_-Y__t__Y__r^_T_.'F-•i---T--T-^r^-T^-r--T- I 1 I 1 I 1 1 I 1 1 I I 1 1 I 1 I 1 I I I I 1 --------.--. 1 1 1 1 1 1 1 1 1 I I I I I I Any person who proceeds with a development without the con- XC s,�"j`�/, sent of a CAMA official under mistaken assumption that the Applicant's s development is exempted, will be in violation of the CAMA If there is a subsequent determination that a permit was required for the development. �A A01flai The applicant certifies by signing this exemption that the / o /r , applicant will abide by the conditions of this exemption. Issuing date 1 1 1 I I 1 1 --r-r--r--r- r-^rx I 1 1 I I I I I 11 1 I I 1 I I 1 I 1 1 1 I 1 it 1 1 I 1 1 1 1 I 1 I I I 1 1 signature 2419 Expiration Dale CERTIFICATION OF EXEMPTION Applicant Name Address i 0 (� FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environmental Quality and the Coastal ResourcsGommission in an area of environmental concern pursuant to 15 NCAC Subchapter 71<o a3or NCGS 113A-103 (5) (b) (5)_ Phone Number2S2-��9-859� City State N� v Zip 22F b� Project Location County, StateRoad,WaterBody,etc.) �� BSI Rf�� •{s` mr��<c�R }�e� yj; /L! 2F car �av rM1. The proposed project to be located and constructed as described above is hereby certified as exempt from the CAMA permit requirements. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal, or Local authorization.*pG(`e Couny ( 13 Pecr� This certification of exemption from requiring a CAMA permit is valid for 120 days from the date of issuance. Following expiration, a re-examination of the project and project site may be necessary to continue this certification. AEC(S): 6 J4 SCALE: A) -T-S --------------i-----i--�--�--i--�--i--�--i --i----i--i--i--i--�--i 1 I ' 1 I 1 1 1 1 1 I 1 1 1 I I I I 1 I I I I I I I 1 I 1 1 I I 1 I I 1 I 1 1 1 1 1 I 1 I I 1 I 1 I 1 I 1 I I I I I I 1 1 I 1 1 I 1 1 I 1 1 I I I I 1 I 1 I 1 I I�I I n r--r-- --r--+- r--r--+--t--*--r--+--*--r--*--r--r--r-ti---t--+--+--*--r--r--r--r--r--+ 1 I 1 I 1 1 I 1 1 I 1 I I I 1 I I I I 1 I I I 1 1 1 I 1 I I 1 I 1 1 1 1 I 1 I I I 1 1 I I 1 I 1 I 1 I 1 1 I 1 r--r----r--r- r--r--r--r--r--r--t--*--r--r--r--r--r--1---t--r--r--r--r--r--r--r--r--� I 1 1 I I 1 I I 1 I I I 1 I 1 I I 1 I 1 I 1 I I I I 1 I 1 I I r--r----r--r----r--r--r--r--r--r--�--r--r--r--r-r-r--r--r--r-r-r--r--r--r--r -� I 1 1 1 1 1 I I 1 I 1 1 I 1 1 I 1 I I I I 1 I I I I 1 I 1 I I 1 1 I 1 1 I I I 1 I 1 I 1 I I 1 I I I 1 I 1 r I r--r----r--r---r--r--r--r--r--r---r--r--T--r--r--r-�---r--r--r--T--r--r--r- r-- --i 1 I 1 I I 1 1 1 1 I 1 I 1 I 1 I I I 1 1 1 I 1 1 1 1 1�% I -I I 1 I 1 I 1 I r--r-- r--r- r--r--r--r--r--r--r----r--r--r-I-Sr r----r--r- r--r--r--r--r- r--ram-i I 1 K1 I I 1 I 1 I 1 I 1 L1 I 1 1 I 1 I I I I I I 1 I 1 1 I 1 I 1 1 I I I 1 1 1 1 I I I 1 1 I A I p I I I I I- 1 I I I I 1 I n 1 T--r--T -r-I---T----r--r--I--I--r--r--1 L 1 I 1 I I I I III �I 1 UTA I I I I 1 I I I 1 I 1 I 1 I I I 1 I I I I I I __L I`[A_ L rL_ L__1__L__1__L__L__1__L__1__L__1__L_J___1__1__1__1__L__1__L _L__ _J �q N 1 I 1 1 I 1 I 1 1 I I 1 I 1 I I 1 I I I 1 I 1 1 I 1 I 1 L__L AL __1_ __L__L__L__1 __L __1__1__L__1__L__1 L_J___1__1__1__1__L__1__L_ 1� L__ J I 1 �IxG I I 1 1 1 I I I I I I I�L I 1 1 I I 1 I 1 1 1 I 1 1�N I I 1 1 1 I 1 I I 1 1 1 VC I 1 I 1 I 1 I 1 I 1 1 L__L_ � `,L__L_ L__L__1__L__L__L__1__1__L__1♦y_L__1__ _J___1__1__1__1__L__1__L _L__L__J I I 1 I I I I I I I I I IM I I I I I I I 1 I I I I +-_4-_+-_L__+__i__4- �q1 1 1 I I I 1 1 1 I I 1 I I 1 1 1 I I 1 I I I 1 I I I 1 I Any person who proceeds with a development without the con- sent of a CAMA official under mistaken assumption that the development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the development. The applicant certifies by signing this exemption that the applicant will abide by the conditions of this exemption. 0 Applicant's signature li LLJTiitn__ A Official's signature l ,zi L /2 Y !', 2-/. ? /2-s Issuing dale Expiration Date CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K or NCGS 113A-103 (5) (b) (5) ApplicantName City Project Location (County, State Road, Water Body, etc.) Type and Dimensions of Project The proposed projectto be located and constructed as described above is hereby certified as exempt from the CAMA permit requirements. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal, or Local authorization. Phone Number State Zip This certification of exemption from requiring a CAMA permit is valid for 120 days from the date of issuance. Following expiration, a re-examination of the project and project site may be necessary to continue this certification. AEC(S): SCALE: •-----------------�----- �----- -----------T--i---- - I I I I I I I 1 I 1 I I I I I I I I I I I I I I I I I I I I I 1 I I I I 1 I 1 I I I I I I 1 I I 1 I I I I I I I I I I I I 1 i I 1 1 I 1 I I I I I I I 1 I 1 I I I I I I I I I I I I I I I I I I 1 I I I I I I I i I I I I I I I I I I I r--r--r--r--t--r--r--r--r--+--r--+--y--r--+--r--+--r-y---t--t--+--+--r--+--r--r--r--i I I I 1 1 I 1 I I I I I I I I I I I I 1 I I I I I I I 1 I I I I 1 I 1 1 I I I I I I I I I I I I 1 I I I I I I I 1 I r--r--r--r--r--r--r--r--r--r--r--r--+--r--r--r--r--r--1---r--r--r-r-r--r--r--r--r--� I I I I I 1 I I 1 I I I 1 I I 1 I I I I I I I I I I 1 1 I r--r--r--r--r--r--r--r--r--r--r--r---1--r--r-r-r-r-r--r--r--r--r-r--r--r--r--r--7 I I I I I 1 I I I I I I I 1 I I I I I I 1 I I 1 I I 1 I I r--r--r--r--r--r--r--r--r--r--r--r--�--r--�--r--r--r-�---r--r--r--r-r--r--r--r--r--i I I I 1 I I I 1 I I I I r--r-- r--r--r--r--r--r--r--r--r--�--r--�--r--r--r-�---r--r--r--r--r--r--r`r--r--i r--r--r--r--r--r--r--r--r--r--r--r--i--r--r--r--r--r-�---r--r--r--r--r--r--r—r--r--t I__I 1 II_-_1 I I 11 I r--r--r__I r-_r--r--r__1 L__L_.L__L_-1__L__L__L__L__1__L__1__T__L__1__L__1__L_J___1__1__1__1__L__1__L__L__L__1 11 _1 1 II I I I I I I I I I I 1 I I I 1 I I I I I I 1 1 I I I 1 1 I I I I I I I I I I I I I I I I 1 I I I I I I I I I I 1 1 1 I I 1 I 1 I I I I I I I I I 1 1 I I I I I I I I i I 1 I I I I I I I I I I I I I I I I 1 I I I I 1 1 I I 1 i I 1 I I 1 I I I I I I I I I I I 1 1 I I I I I 1 1 I I i I 1 1 I I I I I 1 I I I I I I I I 1 I 1 I I I I 1 I I I I I i I I I 1 I I I I 1 I I I I I I 1 I 1 I I I I 1 I I I I I I I 1 I I I I I I I I 1 I I 1 I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 1 I I I 1 1 I 11 1 I I I 1 I 1 1 1 I I I I I I I I I I I 1 I Any person who proceeds with a development without the con- sent of a CAMA official under mistaken assumption that the development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the development. The applicant certifies by signing this exemption that the applicant will abide by the conditions of this exemption. Applicant's signature CAMA Official's signature Issuing date Expiration Date ! | §2«lu�m2 !§!|3!!! }! ) { j ) �s� sa §�22 , } ;!!! � r x1251 lLaroc o-, RaEarNe,4c—him � 6cI LYtttbM HkLW — --y zaz5]Ananuc or W.n nn snw.INv_R01).c . t d 0 d - xcnorm_m«xn_mn • Posces {7 . o«a�og MV a RyP , •4ror272700 ' 6. kU 1pY4MY .n tINaXWUf43dLCMIWa 3}O])9111191 S.Y tl11 b x015 Un PmM R ♦ Svl«eLYe1MbS9(KeMns � a v ♦�o«e County A.. .. --- r sore CouMywaroga- P.leu l.lnv r ♦Sncm«.apP«cxL 11 � �� ym�a ]d[ -g PN , E f^:A �P. R O sYGlllIgLOL«N) � L • a swbngwLmaaLmx ,3 e l � S � - 'e• �. , op a „i T ✓ • L.vm ' l l J I ] v vnmary 4etosau .�.._.. a 1.Y / I � 4y«4olLuunfxO211 I' •"'9L1 _ft R ♦ p X«ena«�aLmne • `� ♦ �� • ♦ ®wces a r .� a tiffs / i :' l )D sum", ary' r • DATE: 10/13/2024 INVOICE # CUSTOMER ID: INVOICE TO: RECEIVED OCT 16 2024 DCM-EC Rodanthe Pier 24251 Atlantic Dr Rodanthe , NC 27973 SALESPERSON JOB PAYMENT TERMS Oscar Ward Sales Estimate Only CITY DESCRIPTION N/A Misc material: Fasteners, Metal, Etc.... N/A '.. Replace 6 pylons and repair any damaged structure found Thank you for your business! DUE DATE 10/13/2024 UNIT PRICE LINE TOTAL N/A 750.00 N/A 19250.00 Carver, Yvonne From: KD Jackson <kd.jackson@darenc.gov> Sent: Wednesday, October 16, 2024 2:31 PM To: Carver, Yvonne Subject: [External] Fwd: Piling work at Rodanthe Pier Attachments: Estimate for Rodanthe Pier 2024.docx CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. I got this the other day and I left a message on your phone but the piling replacement is in the water and that's not my jurisdiction so I am emailing you this and you may want to contact Mr Plumbee because I believe they guy coming this weekend to do the work. Forwarded message From: Rodanthe Pier <rodanthepierllc@gmaiL com> Date: Mon, Oct 14, 2024 at 1:50 PM Subject: Piling work at Rodanthe Pier To: kd.jacksonCaldarenc.gov<kd.jackson(ddareno,gov> Hi KD, Thanks fortalking with me the other day. Attached is an estimate for the work we discussed. Thanks, Terry Rodanthe Pier LLC www.rodanthepierllc.com 6— /11' A' J 6 4, •\ V I L l< A I t o&J r-1 c—E—' �p4S8�3€�ig�@ x TIMMONS GROUP... NORT CAROLINA LICENSE NO C-1652 •' ` • w.«a �fF ^ w. i CAMA PERMIT DRAWING FOR RODANTHE PIER, LLC 3 E g d $ 4 ,,� z