HomeMy WebLinkAbout140-10 Renewal 2023 Permit Class Permit Number
RENEWAL 140-10
STATE OF NORTH CAROLINA
Department of Environmental Quality
and C '
Coastal Resources Commission IR/W
,Permit 4%
for ;
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Town of Oak Island,4601 E. Oak Island Drive, Oak Island, NC 28465
Authorizing development in Brunswick County at the Atlantic Ocean and ocean beach, within the
limits of the Town of Oak Island , as requested in the permittee's application dated letter dated received by
DCM MP WIRO on 1/9/23.
This permit, issued on June 2,2023 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action;or may cause the permit to be null and void.
1 ) This Renewal shall be attached to the original of Permit No. 140-10, which was issued on 12/3/10, as
well as all subsegUent modifications and renewals, and copies of all documents shall be readily
available on site when a Division representative inspects the project for compliance.
NOTE: The permittee is advised that additional authorization through permit modification is required
prior to the initiation of each event.
2) All conditions and stipulations of the active permit remain in force under this renewal unless
specifically altered herein.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered ?veZBraxton C. Davis, Director
hereunder requires further Division approval.
Division of Coastal Management
All work must cease when the permit expires on
This permit and its conditions are hereby accepted.
January 28, 2028
In issuing this permit, the State of North Carolina agrees CL
that your project is consistent with the North Carolina Coastal
Management Program.
Si nature of Permittee
Town of Oak Island Permit No. 140-10
Page 2 of 2
Additional Conditions
3) In order to protect threatened and endangered species and to minimize adverse impacts to intertidal and
beach resources, no beach bulldozing activities shall occur from April 1 through November 15 of any
year without prior approval from the U.S. Army Corps of Engineers in consultation with the N.C.
Division of Coastal Management, the U.S. Fish and Wildlife Service and the N.C. Wildlife Resources
Commission.
NOTE: This modification and renewal does not eliminate the need to obtain any additional state, federal
or local permits, approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers assigned this project Action Id No. SAW-2010-00028.
NOTE: The N.C. Division of Water Resources assigned this project DWR Project No. 2010-0712.
NOTE: A permit renewal application processing fee of$100 was received by DCM for this project.
Permit Class Permit Number
RENEWAL 97-99
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Permit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
t Issued to NC Wildlife Resources Commission,512 N Salisbury St.,Raleigh,NC 27604
Authorizing development in Dare County at Pamlico Sound,Near Hatteras Inlet
as requested in the permittee's application dated letter dated
11/2/22.
This permit, issued on April 28,2023 , is subject to compliance with the application(where consistent
with the permit),all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal shall be attached to Permit No. 97-99, which was issued to the permittee on 10/8/99, as
well as all subsequent renewals, refinements, and modifications and copies of all documents shall be
readily available on site when a Division representative inspects the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
99-0157.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No.
1999-10687.
NOTE: A permit renewal application processing fee of$100 was received by DCM for this project.
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the Chair
other qualified persons within twenty (20) days of the issuing of the Coastal Resources Commission.
date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
For Braxton C. Davis, Director
Any maintenance work or project modification not covered Division of Coastal Management
hereunder requires further Division approval.
All work must cease when the permit expires on This permit and its conditions are hereby accepted.
8
December 31,2024 l
In issuing this permit, the State of North Carolina agrees /
that your project is consistent with the North Carolina Coastal !!l•..ttt///
Management Program. Signature of Permit