HomeMy WebLinkAbout92867C - LaRowe o1*O`°"Sr^1 ❑CAMA ❑ DREDGE & FILL N9 92867 A B C D
3
GENERAL PERMIT Previous permit
Date previous permit issued
[]New ❑Modification ❑Complete Reissue ❑Partial Reissue
As authorized by the State 4of Noorth,Carolina,Department of Environmental Quality and the;Coastal Resources Commission in an area of environmental concern pursuant to:
15A NCAC w~il 1 ' k�[�l ❑Rules attached. 4General
Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant NameAuthorized Agent
Address ^ Project Location(County): '
City Late ZIP v Street Addr ss/State Road/Lot#(s)
Phone# 1�
Email """ Subdi isi n
City �`" ZIP
L
Affected CW W EW PTA ❑ES ❑PTS Adj.Wtr.Body. (nat/man/unk)
AEC(s): OEA ❑IHA ❑UW ❑SPIMA ❑PWS Closest Mal.Wtr.Body 'I
ORW:yes/ PNA:yes/no
Type of Project/Activity
(Scale: )
Shoreline Length �, \
Access Length f�r zC'L24A tlge i
Pier(dock)length
Fixed Platforms) ' )
Floating Platform(s)
Finger pier(s)
Total Platform area
Groin length/# 11
Bulkhead/Riprap length
Avg distance offshore
Breakwater/Sill ^� l' ✓l
Max distance/length
Basin,channel
Cubic yards �
! �•.
Boat ramp 04
Boathouse at
Beach Bulldozing
r.
Other
r.
SAV observed: yes no
Moratorium: n/a yes no
Site Photos: n ,
Riparian Waiver Attached: s o '
A building permit/zohjrif terrhi4 may 62 req i1Z by: i
Permit Conditions — 1-1 frl6C
❑TAR/PAM/NEUSE/BUFFER(circle one)
' tQ 1 1. r ❑ See note on back regarding River Basin rules
CJ k Ir f r '
r / ❑ See additional notes/conditions on back
1 AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name (T� Permit Officer's PAIWTED Nam
Signature"*Please read compliance statement on back of permit" Signature
iG1 4 Oaf/)9/2q C, 1/12 /?5
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
F-1 Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie,Camden,Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
`OW4,&❑CAMA El DREDGE & FILL NO g�7 A B C D
3 Previous ermit
D
GENERAL PERMIT p
Date previous permit issued
❑New ❑Modification ❑Complete Reissue ❑Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I SA NCAC ❑Rules attached. [I General Permit Rules available at the following link:www.dgq.ncyov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#
Email Subdivision !
City ZIP
Affected y❑CW `D EW PTA ❑ES ❑PTS Adj.Wtr.Body y (nat/man/unk)
i
AEC(s): ❑OEA ❑IHA ❑UW ❑SPIMA ❑PWS Closest Maj.Wtr.Body I
j,
ORW:yes/no PNP:yes/no
Type of Project/Activity
(Scale: )
Shoreline Length ! t,- � { '4 •
Access Length
Pier(dock)length 1// �l�y-�YV1, `
Fixed Platform(s) yy ............. - r t j
!�I ...
Floating Platform(s) -
i
(
ier Finger s) { .. :........ i.._ -
g p
Total Platform area wmt
Groin length/#
' E i
Bulkhead/Riprap length --- }. - _.. _�.. ............ ._._
Avg distance offshore
Breakwater/Sill
Max distance/length
Basin,channel
Cubic yards i
Boat ramp i
Boathouse/Boatlift 1 ± '� 1 v
Beach Bulldozing
Other
SAV observed: yes no
Moratorium: n/a yes no
Site Photos: yes no, _ _....-.. ..........
Riparian Waiver Attached: yes
A building permit/zcWng�ermit may be re'gtlire8 by: i X J
❑TAR/PAM/NEUSE/BUFFER(circle one)
Permit Conditions
1 ' I 1 ��' i > %/ ! 1 ` ❑ See note on back regarding River Basin rules
❑ See additional notes/conditions on back
1 AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature"Please read compliance statement on back of permit" Signature
Application Feels) Check#/Money Order Issuing Expir lion Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
1-1 Tar - Pamlico River Basin Buffer Rules F1 Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret, Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie,Camden,Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: U&S� &1�.r( ra. lL,4-)U�c
Mailing Address: _ Old Lt'.11Ox" \ v
0L
Phone Number: r1 - -7 O " 9,--) -7 11+
Email Address: C
I certify that I have authorized v L7r W Jq1050r40q7Y
Agent/Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA},permits
necessary for the following proposed development: ATJ,<L � V.
at my property located at 1 " 4S
in ( )S\U'�j County.
I furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
1 Signature
�a Q g cc(-
Print or Type Nam
RECEIVED
Title
SEP 0 9 2024
Date
DCM-MHD CITY
This certification is valid through 8 13 I 1
l�
d Q
J�ll� OHIN-WOa
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Property Owner:
Address of Property:
Mailing Address of Owner:
Owner's email: Owner's Phone#:
Agent's Name: Agent Phone#:
Agent's Email:
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adiacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property.The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. A
description or drawing with dimensions must be provided with this letter.
I DO NOT have objections to this proposal. I DO have objections to this proposal.
If you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 400 Commerce Ave.,Morehead City,NC 28557.DCM representatives can also be contacted
at(252) 515-5400. No response is considered the same as no objection if you have been notified by
Certified Mail
WAIVER SECTION
I understand that any proposed pier, dock, mooring pilings, boat ramp,breakwater, boathouse, lift, or
groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (if you wish to waive the setback, you must sign
the appropriate blank below.)
I DO wish to waive some/all of the 15' setback
Signature of Adjacent Riparian Property Owner
-OR-
I do not wish to waive the 15' setback requirement(initial the blank)
Signature of Adjacent Riparian Property Owner:
Typed/Printed name of ARPO:
Mailing Address of ARPO:
ARPO's email: ARPO's Phone#:
Dater *waiver is valid for up to one year from ARPO's Signature"
Revised May 2021
N.C. DIVISION OF COASTAL MANAGEMENT RECEIVED
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIV 2024
(Top portion to be completed by owner or their agen-t
M-MHD CITY
Name of Property Owner: G�/ �� j�tb(C ( C, CA kow-elDC
Address of Property: 1�• I �dwl. y 15
1�19Mailing Address of Owner: U �n�x ��( � (}` w (z i NC QV'A `f
Owner's email: i ��/�r's Phone#: �e
(bJvne ,���=1 - � �
Agent's Name: Agent Phone#: IL
Agent's Email: (�I
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property. The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. A
description or drawing with dimensions must be provided with this letter.
I DO NOT have objections to this proposal. I DO have objections to this proposal.
If you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 127 Cardinal Drive Ext., Wilmington, NC 28405-3845. DCM representatives can also be
contacted at(910) 796-7215. No response is considered the same as no objection if you have been
notified by Certified Mail.
WAIVER SECTION
I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or
groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign
the appropriate blank below.)
I DO wish to waive some/all of the 15' setback
-OR-
Signature of Adjacent Riparian Property Owner
1 do not wish to waive the 15' setback requirement(initial the blank) �J T
Signature of Adjacent Riparian Property Owner:
Typed/Printed name of ARPO:
Mailing Address of ARPO: :,oe p}Cp p(j,r p
ARPO's email: bq,�o✓JaME)j�-JtC,,:�U,o,1ARPO's Phone#: (� ]&<�)I4 a 5,�
Date: `� 13� �i�a; *waiver is valid for up to one year from ARPO's Signature*
Revised July 2021
N.C. DIVISION OF COASTAL MANAGEMENT RECEIVED
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY ISEP 0 9 2024
(Top portion to be completed by owner or their agent)
��
DCM—MHD CITY
Name of Property Owner: ���d��o.�-�_((�L�_ (�� (il�.
Address of Property: 1 r.
Mailing Address of Owner: L>;k %kk
Owner's email:Cl la wst (11(Y1fit' wner's Phone#: _4� L _ a y
Agent's Name: N I Agent Phone#:
Agent's Email:
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property. The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. A
descri tion r drawing, with dimensions must be provided with this letter.
1S.1I DO NOT have objections to this proposal. I DO have objections to this proposal.
If you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 127 Cardinal Drive Ext., Wilmington, NC 28405-3845. DCM representatives can also be
contacted at(910) 796-7215. No response is considered the same as no objection if you have been
notified by Certified Mail.
WAIVER SECTION
I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or
groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign
the appropriate blank below.)
I DO wish to waive some/all of the 15' setback
Signature of Adjacent Riparian Property Owner
-OR-
I do not wish to waive the 15' setback requiremen itial the blank)
Signature of Adjacent Riparian Property Owner: C,
Typed/Printed name of ARPO:
Mailing Address of ARPO: d r Af 17k) �-^ � I oc,
ARPO's em il: I3X;
`J [J,,16LA*ePO's Phone#. 10
Date: O �� *waiver is valid for up to one year from ARPO's Signature*
Revised July 2021