Loading...
HomeMy WebLinkAboutWD - 92-05 2nd Oversized Plans1 Od I 2 N01133S SS080 Ala c� 5 7 0 0 10 11 NO TEE: 1 H G 19 19 0 C 0 0 0 12' 0" i —_ 7-1VA7/VA�V\//VA/OVA/ 6" 54'--0" SQUARE FUEL OIL S TORA GE TANK FOUNDA TION J7'-8" DIA. 4 " OIL IMPREGNA TED SAND �-- 6" 157 STONE 7 '< \�<-7 CONDENSA TF STRA GE - TANK FOUNDA TION 40' 8" DIA. 4 " OIL IMPREGNA TED SAND f6" of57 STONE \/ \ /��;\ �i\� \\ ,� \\ \\ \\ \\ \\ \\ \\ \Ni\\\/\, / //, \//. \� /. MAKE UP WA TER STORA GE TANK FOUNDA TION E/ 85'- 6 " MSL El 85'--6" MSL " MSL KLY i UA i C s �l�w i l.nC�...c� - .._.--3_•. ._. REV DATE DESIGNED CHECKED CIVIL ELEC I/ECH APPR'D REV , DATE DESIGNED CHECKED CIVIL ELEC MEC�APPR REV DATE DESIGNEDI CHECKED CIVL I ELEC WECH APPR'0 REV DATE DESIGNED CHECKED ! CNT` ELEC MECH I APPR'D REV DATE 1 DESIGNEDCHECKED I CIVIL 1 ELEC i WECH 1 APPR'D REV I DATE DESIGNED! CHECKED CIVIL i ELEC MECH AAPPR'D RELEASED FOR PERMITTING INFO ONLY PO -I - i - r - 1 - - ' - REV I DATE DESIGNED I CHECKED ClViL ELEC I ►+TECH APPR'D SEAL `,`a /10111��'''', . i i SEAL i ell 0 DRAWN: jok,,. DATE: - DESIGNED: DA'-: CHECKED: DAT-. E. M—, DATE': C. INSP. DAT_: -LJ -y M. INSP. DATE: la Cjl APPR. DATE: t PON+ER ENGWEERING CONSTRUCTION • OPERATIONS & MAINTENANCE BERTIE COGENERATION LBMD PARTNERSHIP BERTIE COGENERATION FACILITY LEWISTON, NORTH CAROLINA DRAWING TITLE PERMIT DRAWING CROSS SECTIONS MISC TANK FDN'S DRAWING NO. CROSS SECTION 3 REV PO SCALE: 3/4" = -i ' — O" 2 El 0 VO TFS.+ J I H G F �J C 12" X 6' SO. SLAB �h 1 19 2 48" d/c Esccpe Tube 108'-8" UNL OA DING HOPPER El 159'— 6 " MSL RECLAIM Ti P 110'--O" r V 8J3 0" MSL E1 84' 0" 14 T -L/ Jw. ( / //-/ CPUSI--R BUIL DING /-/ nil n " / i e-/ I �` ,tiKMI i Ctv^ i Fl FC REV , DATE I DESIGNED i CHECKED CIVL ELEC MECHTA:P� P�R D I REV DATrI DESIGNED 1 CHECKED CIVw ELEC MECH 'APPR'D REV DATr DESIGNED. CHECKED CIVI< ELEC MECH APPR'D I i REV DATE DESIGNED CHECKED I CIVIL ELEC MECH APPR D REV DATE DESIGNED 1 CHECKE- I CIVIL ELEC MECu ARPR'D REV DATE DESIGNED! CHECKE., CIVIL MECii I APPR'D RELEASED FOR PERMITTING ONLY PD- REV , DATE i DESIGNED CHCKE CPJ:_ APPR'D SEAL CNN` 1\ e0' fQ �•S G SEAL i = I ♦ ♦ i �I � ♦♦♦ F/fv `GF .♦ �i DRAVVIV: �� ...._. ,,,,,� �NN DAIL: - DESIGNED: J *AAA� Zo, DA'_: CHECKED: , xk-Qck-k.NK DATM: E. INSP. DA' C. INSP. M. INSP, APPP. DATE: �, L POWER ENGINEERING • CONSTRUCTION • OPERATIONS & MAINTENANCE BERTIE COGENERATION LIkmiiTD PARESFF BERTIE COGENERATION FACILITY LEWISTON, NORTH CAROUNA DRAWIN, T,'TLE PERMIT DRAWING CROSS SECTIONS COAL HANDLING SYSTEM D,A .,V"3 N0. REV CROSS SECTION 4 PO SCALE: 1 f .'Fn = '' - C' 3 4 5 6 7 8 9 I 10 11 I ............... . G F 1 Ld 5 N01133S SS080 n3a BACKFILL USING ORIGINAL MA AERIAL 0 I N CONDENSA TE RETURN ..3" DM INSULA TIOVV MA AERIAL TYPICAL SECTION THROUGH PIPELINE EXCA VA 77 N (Steam only) Use between point 3 & the Host Facilities (Points 4 & 4A). I i I � SECTION THROUGH INTAKE PIPE D Use between points 5 & 6. NTS TREE -LINE (TYF C EXISTING ROA 0 0 PLAN A T CROSSING SCALE- 1' = 20' 100 YR FLOOD EL. J7'+0" MSL 10 YR FLOOD EL. J4'+0" MSL NORMAL WA TER LEVEL EL. 12'+0" MSL CROSS SECTION THROUGH RIVER AT INTAKE/DISCHARGE SCALE.• 1 " = 20' BA CKFILL. USING ORIGINAL MA TFRIAL /i\\ I I I=_ I I I \ \\ =1 POWER CABLE / I I I III—lil 4'--0' TYPICAL SEC TION THROUGH PIPELINE EXCA VA 77ON (Intake & Discharge only) Use between points 2 & 5. T11R (SEE PLAN) CLEARING LIM17S' = 100' WORKING L AM= = 75' (NTV BACKFILL USING ORIGINAL MATERIAL III POWER i CABLE / II— /ice///,/�\// ,3 =0" `'PICAL SECTION THROUGH �IP�INE EXCA VA 77ON or Discharge only) -�� ooints 1 & 2 and 1A & 2. do 6, Discharge Only (without power cable). 14 ON I 14 -O' ,L 120" 6" BALLAST (MIN.) 2'-O UNLESS NOTED I (SEE PLAN) 6" SUBBALLAST 100.1 100.1 (PLANT & YARD AREA) 50.• 1 50.• 1 (OTHER AREAS) TYPICAL SECTION THROUGH RAIL NTS PROPOSED PIPE -LINES BUGSB K'S GUT CROSSING DETA ( I � I I 1 i I ,3 1 GRADE (SEE PLAN) `— r _ 1 - 48"0 QNP 25 -O ` (tyP) CONDENSATE RETURN LINE Access Road I o INTAKE & DISCHARGE LINES (BELOW) TYPICAL PLAN 57FAM LINE LOOP SECTION (Above Ground Portion) NTS CLEARIA WITS = 20' I TYPICAL SECTION THROUGH STEAM LINE ALIGNMENT (Abom Ground Portion) Use between points 2 & J 10 -O" IF DISTURBED, SLOPE TO BE RESTORED TO 2.-1, STABILIZED WTTH JUTE MESH, AND RESEEDED. �- ---'2- 1200PIP - —f 48"0 CMP SEC770N 21 T AL ONG ROAD SEC770N CUT A CROSS ROAD SCALE- J18' = 1 ' SCALE- J18" = I- - NO TES.- 1. Reference Drawing #4361-06-1600.00-0001 for location of points along pipelines. 2. All piping is 12" diometer unless noted otherwise. REV DATE DESIGNED CHECKED cr& ELEC MECH I APPR D [REV I DATE I DESIGNED I CHECKED? I CIVIL I ELEC I MECH I APPRT REV I DATE I DESIGNED CHECKED I CIVIL I ELEC I MECH t APPRb REV DATE DESIGNED I CHECKED I CIVIL I ELEC I ME CM -1 APPn REV I DATE IDESIGNED1 CHECKED 1 CIVIL ELEC I MECH APPR ADDED CONDENSATE RETURN LINE & INDICATED SCALES ADDED DITCH CROSSING DETAIL [P1 lb*-il I &4 REV 1 DATE IDESIGNED11 CHECKED 1 CIVIL ELrC I MECH I APPRI) RELEASED FOR PERMITTING INFO ONLY PO I - I - I - I - - I - 1REV DATE DESIGNED CHECKED CIVIL ELEC MECH !JD SEAL X�N CARp i SEAS i �12823 I •% 401 NEE -/ �o t6-Il DRAWN: J R MEDLIN DATE: - DESIGNED: J R MEDLIN DA TE: 8-21-91 CHECKED: J R MEDLIN DATE: 8-21-91 E. INSP. D E BROEILS DATE: 8-21-91 C. INSP. T B DAVIS DATE: 8-21-91 M. INSP. C B JONES DATE: 8-21-91 APPR, R L MEISENHEIMER DATE: 8-21-91 itill]11 11 O POWER ENGINEERING • CONSTRUCTION • OPERATIONS & MAINTENANCE BERTIE COGENERATION LIED PARTNERSHIP BERTIE COGENERATION FACILITY LEVASTON, NORTH CAROUNA DRAWING TITLE PERMIT DRAWING CROSS SECTIONS TYPICAL PIPELINE DETAILS & RIVER CROSS SECTION DRAWING NO. REV CROSS SECTION 5 P1 SCALE: 1 /2' = 1' — 0' UNLESS NOTED J a It 0 x 1 - L z I 3 1 4 5 Ld UNI — DNIUM lIWd3d AM 25 -O 1900"+ x N ___ ❑ -------— — — — — — — — — — — — — — ---- ELRCAL 1 INTAKE — — — INTAKE LINE _ _ _ _ _ _ -� SCREENSC---------------------------------------------------------------- DISCHARGE LINE TEMPORARY 1 �\ SHEET PILE 4i �\ FENCE (COFFERDAM) GRA VEL PARKING AREA 1 opWE 0 ' EXISTING SHORELINE ♦ \ �� ® NORMAL WA TER LEVEL ♦ \` PLAN kI I F ii PUMPS ELECTR. RM. I 3 i NORMAL WA TER LEVEL ­7 100 YEAR FL O (0' NWL) EL. 12+0 MSL EL J7+0 MIN. WA TER LEVEL " EL. 7+0 MSL EXIS771VG 6RAD__\, SHEET PILE --i EL26+Of MSL .3' E 0 C ��l II' I 30' DIA INTAKE PIPE —------------------------------- ----------------------------------------- -------- -. — — —. ----.--------.----------- (2) 12" SO X 10' L G PILES INTAKE SCREENS SO. PILE CAP 25' L G PILES 5 REO D TYP COLUMN FDA_ NTS ELEVA TIDW MAKE-UP WA TER INTAKE STRUCTURE SCALE.- 1 " = 20' EL. 20'+0 MSL 6 I 7 I 8 I 9 � 10 11 �— SIL T FENCE AND/OR STRAW BALES AS REO D FOR EROSION CONTROL (TYP) SEE T.4'. COLUMN FON. SEL OW Z* h 50'—O' I O -- r — �n7 _=- — Li �—' ELECTRICAL o �/ ❑ I ROOM N�I --------INTAKE CULVERT —J ------ -------------------------------------------------- —\ U I DISCHARGE LINE TEMPORARY SHEET PILE (COFFERDAM)LAJ L'i I Wo- `-- $ /00 a ♦ �� o110.` ♦ �\ EXISTING SHORELINE ® NORMAL WA TER LEVEL ♦ \ �� AL TERNA TF PLAN VIEW 100— YR WA TER FL 000 (E/. 37+0 MSL) (NOT SHOWN TO SCALE) TEMPORARY SHEET PILE AC7UAL PILE SHAPE AND CONFIGURA 77ON TO BE DE7FRMINED 10— YR WA TER FL 00D (El. J4+ 0 MSL) (NOT SHOWN TO SCALE) BY INSTALLER. SEE DETAIL BELOW FOR TYPICAL PILE SHAPE. SLOPE TO BE RECOMPACTED, RETURNED TO ORIGINAL GRADE AND SEEDED, IMMEDIA TEL Y FOLL 0KNG INS TALLA TION OF DISCHARGE LINE. SLOPE INTEGRITY TO BE MAINTAINED USING EXCEL SAR FIBRE MA T OVER DISTURBED AREAS ABOVE ELEVA TION 12'+0 MSL. — EXISTING SLOPE NORMAL WA ASR LEVEL (0+0 NK) = 12' MSL 0 A I ` PIPE SUPPOERT (2) 12" SO X 10' LG PILES PUMPS r1 r^Irr] DI! NORMAL WA TER (0' NWL) a.12+ MPV. WA 7FR EL. 7+0 M5 11yI^fIL JL11ILL/YJ AL TERNA TE ELEVA TIO/Y AL TERNA TF MAKE-UP WA TER INTAKE STRUCTURE SCALE- 1 " = 20' METALLIC PIPE PLASTIC PIPE DISCHARGE LINE 77N SEL OW '_ODD ISL TIPICAL SHEET PILE ARRANGEMENT P/ AN VIFW .SECTION THROUGH NTS NO TES: 1. Reference drawing 'Cross Section 5' for complete cross section of river. 2. Reference drawing 4361-06-1600.00—C?03 for Erosion Control general notes and references. 3. For additional information, See 'PERMi DRAWING—INT2°. REV I DA7_ I DESIGNED DIECKE I CIV1 E: EZ I MECH I APpR'D j MECH REV DATE I DESKIED I CHECKED j CM ELEC ( MECki I APPR o 1 REV I DATE I DESIGNEDI CHECKED I CWIL ELEC I MECH I APPR-1) 1 REVISED SCALE INDICATORS & REFERENCE TO GRAVEL FLi ADDED STAIRS P1 t1_s - -t) Gr.� •aQ�nn " REV DATE IDESIGNEDtdrECKED CW! ELEC I ME G'1 APPR'D RELEASED FOR PERMITTING ONLY PO I — I — i — I — — I — I — REV DATE IDES)GNEDI CHECKED 1 CM ELEC MECH I APPR'D SEAL ESS 1 SEAL i i 2823 DRAWN: J R MEDLIN f DA:t: — DESIGNED: J R MEDLIN D 8-21-91 CHECKED: J R MEDLIN Dr: 8-21-91 E. INSP. D E BROEILS DST: 8-21-91 C. INSP. T B DAMS Dr7. 8-21-91 M. INSP. C B JONES D4 8-21-91 APPR. R L MEISENHEDAER D.= 8-21-91 I I I OWER ENGINEERING • CONSMUCTKNJ • OPERAMNS & MAJNnNMCE BERTIE COGENERATION, LIMITED PARTNERSHIP LEWISTON COGENERATION FACILITY LEWISTON. NORTH CAROUNA DRAWING TITLE PROPOSAL SKETCH INTAKE AND DISCHARGE DRAWING NO. REV PERMIT DRAWING — INT1 P1 SCALE: 1' = 20' UNLESS NOTED 1 Od ZIM — ONIMVda IIWd3d A3d 3 El E A 7 0 10 11 NO TES.- 1. FOR ADDITIONAL INFORMATION, SEE 'PERMIT DRAWING-INT1•. J I H 9 F 111 0 U. ELEVA TION OF IN TAKE STPUC TUPE nC• /1r i�i� ni D A J A J SECTION A 9'rz' n' 180 X 4' SO PILE CAP AL TEPI'VA TE EELEVA TION OF INTAKE STPUCTUPE w r REV DA?F DE:1c,-Nc ttlEClff, REV DATE I DESIGNED CHECKED I CIVIL I ELEC IMECH APPR REV DATE I DESIGNED CHECKED I CIVIL ELEC MECH APPR REV DATE I DESIGNED I CHECKED CIVIL ELEC MECH APPR'D REV DATE I DESIGNED 1 CHECKED CIVIL ELEC MECH APPR D REV DATE I DESIGNED I CHECKED 1 CIVIL ELEC MECH APPR D �AP�P'D REV DATE I DESIGNED CHECKED I CIVIL ELEC MECH RELEASED FOR PERMITTING ONLY PQ I - I - - I - - - I - RFV I DATE 1 DESIGNED I CHECKED 1 CIVIL ELEC MECH I APPR D SEAL J��•�rOF ESSIQ,�'ti�y i' SEAL �2823 = s �i �< aFNG I NE.•f• C'7 '''O��� r DRAWN: , v- Iv,_,tin �, DATE: - DESIGNED: J (L jjJAZjA DATE: CHECKED: J� DATE: lo.16- 1 E. INSP. DATE: ye - 7-y C. INSP. �%,�-1�� _ DATE: b M. INSP. C DATE:/6- - r --2/ APPR. A/'Y14/ DATE:/O 7 el POWER ENGINEERING • CONSTRUCTION • OPERATIONS & MA114TENANCE BERTIE COGENERATION �D PARTNERSHIP BERTIE COGENERATION FACILITY LEWISTON, NORTH CAROUNA DRAWING TITLE PERMIT DRAWING INTAKE STRUCTURE SECTIONS & DETAILS DRAWING NO. REV PERMIT DRAWING — INT2 PO SCALE: 1 /4' = 1' Y 7 0 10 11 HI E D C 1 ld 2000-00*0091-90— L92t All EROSION CON TROL NO TES: 1. For erosion control Sections and Details, see Drawing No. 1600.00-0004, 2. Proposed use: Inaustria':, Cogeneration Facility. 3. Zoning: M2. 4. Vegetation in dit_—� flow lines shall be established utilizing excelsor fibre rnc_ 5. No critical erosicr problems are anticipated in developing this 186.27 acre site (approximately 35 acres disturbed). All site work shay be performed in occordonce with the North Carolina Ersion and Sediment Control Law and the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Prior to any ion: disturbing activity (inciuding dearing) silt fences, and sediment basins shall be installed at the locations rdicated on the drawings. 9. Divert runoff to oppropriote sediment basin as construction pros resses. 10. Erodabie areas c:sturbed during construction shall be either temporary,. or permanently grassed immediately after work in thc: area is complete or when construction is delayed for 3C or more working days. 11. All erosion contr devices and structures shall be in— spected and repcired or replaced as needed after each significant roinfm . Any additional measures required to contain sedimen-, on site shall be installed where needed and as approved by the Engineer. 12. Ditches and swa►es shall have check dams installed at intervals specifies in Specification Section 02270 to control runoff velocity. 13. All areas shall be permanently grossed within 30 days after completion of fine grading. 14. Contact the Ber-ue County Building Inspector for inspection or,c approval of erosion control measures. 15. Clearing limits moll extend 10' maximum beyond disturbed areas unless noted otherwise on this plan. 16. Temporary grossng shall be performed in a manner consistent with Specification Section 02930, 'Permanent Grossing", using 25#/acre seasonal small grain (millet, rye, or wheat), applies similar to Permanent Grassing. NN 84 / / :♦ 83 i / i P00 ATE 1 / i / / / / 85 84 / 84 / / / 4 83 / / / 8 / / / PGE 83 86 83 � SE PREP RAP 5P�" 84 � / ,100 C pI5° 0 4 84 85 ) r11 84 �- CLEARING LIMITS m 1 \ \ Bs 84 \ 85 LI. 2.9 86 L0 2.9 87 85 8 \ 86 8 �\ A \ \ M. 84 1�7 PS 84 85 _73 GAP �?, 82 83 1 �o 4 0 81 0 AD* IN BUf�Df'�cE'QvfcE' f �00ERo 85 DC o I�G SjN � SSE J` •• • G 6P 4 PS o ER ENS (BPS 0 r TB�1�01� \ ul,� C.P. 'r i tRAS'N 18in. \ I. 5.5 D / NEB 00? LL=76. D j i TANK PEE P 2 Pro CMP r 82 1 C. I 2 t 5 ...''�- D PS 81 USHE `� 78 7 O CR N D BDIL01 \ RRCOAL Sr�RAG 5ED SEWAGE off ` PROP POSAL AREA R p DIS fEWA TER \ yVA B.SIN \ A �. 79 s 30 00 CUP 80 c,a F` 80 i i GL79 GL GL GL GL �; n�nlnlG BOIL _ ap OOOOP 80�� 80 80 \ l • 80 , 8 LO.=77.0 24' C.P. 80 LL=77.,i 82 BO 80 I,- A 86 8\ 86 2410 CMP \ 86 8 85 M, CLEARING LIMIT � • 85 / 85 1 / . 15in. CMP I I 84� 4 ♦♦ I f I / i i 85 1 / ♦ 85 85 / 85 / 85 i / 12 "0 CMP (TYP. UNLESS NOTED) 84 LEGEND / ♦ RR go RIP RAP LINED CHANNEL P 0 PAVED CHANNEL / r5"m CMP GL GRASS LINED CHANNEL / D PERMANENT DIVERSION i -- PD PERIMETER DIVERSION DIKE — �-- SIL T FENCE ♦ PS PERMANENT SEEDING RR RIP RAP ♦ TEMPORARY CONSTRUCTION ENTR. 0 TFMPORAR Y SEDIMENT BASIN —;� FENCE _ _ PROPERTY LINE CUL tVERT PRE —CONSTRUCTION CONTOUR FINISHED CONTOUR /�. EXISTING TREE LINE CHECK DAM GENERAL NOTES: 1. Site topography taken from topographical mcc orate fw Duke energy C01POIT607 by Alan, ---Hines PC dated Ala ch 21, 1991 2 5erntions hosed a? Naha??/ Geodetic Verticv'Ootum of 1929. 3. the &OSILX Control Plop sho// be 1;77P1eme?71&= ccrrcrr W& with de0ni7g and grading. Clearing sjro/l not Fred the lints s�iawrt 4. All cu/rerts .shall be Qoss III RCP In occordo.e fifth $oern Section 02720, unless noted otherwise. aee Org (later) for schedule and detois: 5. Ccrrfair Infer► / = 1 foot 5. the o-est and toe of ail slopes sholl be roumx' to Remit easy operation of gross mowing or slopes SEAL r� ftQQ `Yl �, _ = SEAS = ti.� NO I NE �,.f" C) ,� /o-3i-91 T DRAWN: J. R. MEDLIN DA 8/21/91 DESIGNED: J. R. MEDLIN DA7: 8/21/91 CHECKED: J. R. MEDLIN DAT 8/21/91 E. INSP. D. E. BROEILS DA7: 8/21/91 C. INSP. T. B. DAVIS DAB 8/21/91 M. INSP. C. B. JONES DA`-: 8/21/91 APPR. R. L MISENHEIMER DA 8/21/91 i I 1 POWER ENGINEERING • CONSTRUCTION • OPERA -IONS Ac MANTD4ANCE BERTIE COGENERATION PARTNERSHIP BERTIE COGENERATION FACILITY LEWISTON, NORTH CAROUNA DRAWING TITLE PERMIT DRAWING GRADING, PAYING, DRAINAGE, AND EROSION CONTROL. DRAWING N0, REV 4361-06-1600.00-0003 P1 ji SCALE: 1" = 100' 1 I �d t000-0000091-90—Mt n�a i' n" mot' n• g I 6 7 I 8 I 9 I 10 I 1� NO TES: 11. Fa- Notes and Refe&Xn ' see dmwrng 160000-WO.. Hi GI FI E C 0 i SPILL WA Y CSEE' DETAIL. 'A) — EL. 75.25 NOTE.- CONSTRUCTION AND DETAILS SHALL CONFORM T NORTH CAROLINA EROSION & SEDIMENT CONTROL STANDARD & SPECIFICA 770N 6.61 ELEVA TION OF CHECK DAM SEDIMENT BASI/V #> DRAINAGE AREA = 35 AC PEAK RUNOFF, 010 = 118 CFS TOTAL VOLUME= 63, 000 FT3 SEDIMENT STORAGE VOLUME = 35, 000 f-.f CLEANOUT ELEV. 77. 0 DITCH BANK CLASS A ORB ,—EROSION CONTROL STONE BIBIIJIt:::IIJIL::JIt--iIt=:JIt�iL�i� SECTION THRU CHECK DAM STONE CHECK DAM POINT A POINT B I I I) I ' 'L ' = 7HE DISTANCE SUCH 7HA T POINTS A & B ARE OF EQUAL ELEVA 776K SPA CING BETWEEN CHECK DAMS 14 GA. WIRE FENCE W/ 6'x6" MESH (SEE NOTE' 3) — MIRAFI FZL TER FABRIC OR EQUAL 4 "x4 " PINE OR 1.-T-T�/f T. STEEL POSTS' (SEE N07E- 4) �ppa d9llill OUTLET EL 75 0 .:)CC itr L: V(/!LL / J�nuLLLL.n riv. ua.. •..a.- 36'0 CMP ANTI— VORTEX DEVIX �� h EL 79. 0 2110 CMP VERTICAL SPILL WA Y CLEANOUT EL 77.0 R fn £L. 75.25 a R B� �7_ 4'-0' SO. NOTES.• 1) ALL CO►RRUGA TED METAL PIPE SHALL BE 14 GA G_ 2) SEE SCHEDULE. 3) VFR77CAL SPILL WA Y SHALL BE PRE -FORA lED WITH 3/4'. HOLES SPACED 3" ON CENTER. 4) LOWER 2 FEET OF THE VFR77CAL SPILLWAY SHALL BE COVERED WITH COARSE AGGREGA 7F THAT WILL ALLOW COMPLETE DRAINAGE OF THE POOL DETAIL 'A " NOTE EN RA/YOE 9VALL BE AIAP17AINIP S7/O V Tl1AT 7RAO lrNG OF A/UO PUBLIC ROAD ,9VA[[ BE f35'Ej'fNIFD. � �� o• / / t we. 6' GRA VELED CONSTRUC TION EN TRANCE VAR 12'—O' DI SRSION DITCH (TO BE IN PLACE PRIOR TO DISTURBING SITE-) TREE-LDNE EXISTING GRADE" i PIPE OUTLET STABILIZA TION Do L W APRON STONE 12' 6' 7' CLASS 8 RIP —RAP 15" 8' 10' CLASS 8 RIP —RAP 18" 10' 12' CLASS B RIP —RAP 21 " 12' 14' CLASS 8 RIP —RAP 24" 14' 16, CLASS B RIP —RAP 27" 16' 18' CLASS B RIP —RAP 30" 18' 27' CLASS B RIP —RAP 36' 1 20' 23' CLASS 9 RIP —RAP 2'--O" VAR MIN. MIN. ROADWA Y 2 lYP HP (� 50.• 1 /r 50-1 1 - 3 3 2 =0" UNLESS NOTED (SEE PLAN) TYP. CROWNED ROAD SECTION FOR PA *VG SEE TYP DETAIL AND SPEC. SEC770N 02500 )"LAIV FIL TER FABRIC SECTION PTPF n1/T/ FT T FT A T AREA SL OPE VARIES' BERM DITCH (SEE PLAN) 1 1/2- SURFACE COURSE 2 1/2' BINDER COURSE--� YARD COMPACTED FILL, ROAD BED, OR RAIL BED 5 =0' PERIMETER & DI VERSION DITCH (TO BE �V PLACE 1 TO DISTURBING SITE) PLAN SECTION YARD SLOPE 2 1 PIPE OUTLET TO DEFINED CHANNEL EC TION WITH Y FOR PA VING SEE TYP DETAIL AND SPEC. SEC I70N 02500 4 "x8" 7RENCH W/ COMPACTED BACKFILL PA VING & BASE FOR ROADS & 0 NER AREAS NOTES' I I BASE' COURSE — NCSHC TYPE B=10' 1) REPLACE DAMAGED FABRIC PROMP7Z Y. I " BIT. CONCRETE BINDER COURSE — NCS-JC 2) REMOVE SEDIMENT WHEN IT REACHES 1/3 OF FENCE HEIGHT. 10" BASE COURSE TYPE H=2 1/2" 3) W7RE MESH SUPPORT FENCE MA Y BE ELAlINA TED WHEN BIT. CONCRETF SURFACE COURSE — NCS�/C EX7RA S7RENGTH FIL 7FR FABRIC AND CLOSER POST TYPE I--1=1 1/2' SPACING ARE USED. 4) POSTS' SHALL BE SPACED A MAXNUM OF 10 FEET APART. WHEN EXTRA 57RENGTH FABRIC IS U50 WITHOUT 7NE WIRE SUPPORT FENCE POST SPACING SHALL NOT �'CEED 6 FEET. t TYPICAL PAVING DETAIL FENo LM YARD SL OPE 1 —.A REV DAT DESIGNED Ch.- ELZ� NEC',, I WWO REV DAir. DESIGNED ::HED CML 1 ELEC K-CH AP?R'D REV GATE I DESIGNS i C-IEC!C^ CML ELEC KECH APW REV DATE DESIGNED I CHECK.�D i CML ELEC TECH I APPR'D f i I I REV DATE I DESIGNED 1 CHECK ' CML ELEC I KECH I APQR D i REV DATE I DESIGNED' :HMK:2 I ELEC KECH IAPPR'D RELEASED FOR PERMPM P1�- REV DATE DESIGNEC CHECK: CML ELEC KECH APPR'D RELEASED FOR PERMMNS PO . 8/21/91 JRM JRfri ! TBD DEH CBJ I RLM REV DATE DESIGNED NECKED CML ELEC MECH APPR'D SEAL \A CA; OF ESS: v 4- r Q� `� % SEAS i 12��� �nnni��fi``� DRAWN: J. R. MEDLA I DATE 8/21/91 DESIGNED: J. R. MEDL2 DATE: 8/21/91 CHECKED: J. R. MEDLIN DATE: 8/21/91 E. INSP. D. E. BROELS DATE: 8/21/91 C. INSP. T. B. DAVIS DATE: 8/21 /91 M. INSP. C. B. JONES DATE: 8/21/91 AFAR. R. L. MISEIt-ENER DATE: 8/21/91 POWER ENGp4EEFtW,• CONSTRUC X)k • OPERATIONS tMWENAIMM BERTIE C G GENERATION TWM r,:E.ir BERTIE COGENERATION FACILITY LEWISTON, NORTH CAROLINA DRAWING TITLE PERMIT: DRAWING ERO,3%I0N CONTROL. SECTIONS & DETAILS DRAWING NO. REV 4361-06-1600.00-0004 P1 ji SCALE: NONE