HomeMy WebLinkAbout8-18 Letter of Refinement 2024ROY COOPER
Gowrnor
ELIZABETH S. BISER
Secretary
TANCRED MILLER
Director
NORTH CAROLINA
Envlronrnentat Quality
August 15, 2024
Middle Island Property Owners Association, Inc.
c/o Alan Reyner
1837 W. Buchanan St.
Columbia, SC 29206
c/o Bruce Marek— Sent via email to mare4dPec.rr.com
Dear Mr. Reynor,
This is with reference to the request received by DCM on August 5, 2024 to refine State Permit No. 8-18,
which was issued to Middle Island POA, Inc. on January 12, 2018, including a 9 slip residential docking facility
at the end of Cape Creek Road, adjacent to the Cape Creek on Bald Head Island, Brunswick County. State
Permit No. 8-18 was modified on February 27, 2023, for two land bridge replacements with wetland impacts.
State Permit No. 8-18 is due to expire on February 27, 2028.
The action proposed in your request consists of elevating the permitted vinyl sheet piles adjacent to the
existing boat ramp, pouring the new concrete boat ramp in place and replacing 6 fixed dock piles. The
authorized sloped sheet pile groin associated with the boat ramp would be elevated and horizontal across
the top of the structure. According to the proposal, the concrete for the boat ramp would be poured in place
within a containment structure and would not come in contact with surface waters. In addition, six existing
pilings associated with the existing dock would be replaced. Attached with this request is DWG C1 showing
the proposed changes (dated as received by DCM 8/5/24).
Upon reviewing the information provided, the Division of Coastal Management, in coordination with the
Division of water Resources, has determined that the proposed action is consistent with existing State rules
and regulations and is in keeping with the original purpose and intent of the permit. This Letter of Refinement
authorizes the modification of State Permit No. 8-18 as described in your request dated received on August
5, 2024. Please note this refinement does not alleviate the need to obtain any other local, state or federal
permits.
Sinnc��Aereely,
— /� ` V"
Tara MacPherson
Wilmington District Manager
Cc: USACE
DWR
North Carolina Department of Environmental Quality I Division of Coastal Management
Wilmington Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
910.7%.7215
MacPherson, Tara
From:
marekyd@ec.rr.com
Sent:
Friday, August 2, 2024 6:06 PM
To:
MacPherson, Tara
Cc:
marekyd@ec.rr.com; 'Alan Reyner'
Subject:
[External] CAMA 8-18 Middle Island POA Boat Ramp Replacement Letter of Refinement
Request
Attachments:
CAMA 8-18 Middle Island POA Boat Ramp LOR Request- seal date 8-2-24 BMPE.pdf;
CAMA 8-18 Middle Island POA Boat Ramp LOR Dwg C1 seal date 8-2-24 BMPE.pdf
Follow Up Flag:
Follow up
Flag Status:
Flagged
CAUTION: External email.
Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Hi Tara,
Attached is a Letter of Refinement request for the Middle Island POA Boat Ramp Replacement Project. As we have
spoken on several occasions and per your March 2024 Site Visit, my request is to construct the boat ramp with a
horizontal top vinyl sheet pile sides, with a ptsyp wood cap, rather than the 1-24-19 Jeff Troutman sloped with
ramp sheet pile top. This is more in line with theexisting VBHI boat ramp construction. And now with the two aged
timber bridges to the marina replaced with land bridges, which will allow heavier trucks and construction
equipment, I am showin as an alternate method to the concrete plank ramp as 6" thick poured concrete.
As per building the land bridges, it worked well for some temporary 6x6 ptsyp piles to the outside of the outer
whalers, to keep the sheet pile in line until the cross structure 1" diameter hdgtie rods and backfill are in place.
I am showing my ramp with a 2.5:12 slope, which is what I measured as existing. Troutman had ramp slope at 16
degrees = 1.92:12. This allows me to show a shorter length than permitted ramp as 42' length rather than at 55'-3
1/z". Last year's preliminary estimates were $6000to $10,000 per foot of ramp length, so shortening up the ramp
has considerable savings. I may fine tune the ramp slope and the ramp[ length once we get quotes in hand, but I
would not go outside the permitted ramp footprint.
My drawing C1 is meant to be in conjunction with the Jeff Troutman 1-24-19 Major Permit Drawings, rather than
being a full replacement. All builders have slightly different ideas on ideal ramp construction based on any site
constraints, and I prefer to work within their methods to keep costs down.
We also askthatwe can replace in kind the existing 6 fixed dock piles, or to sister new piles to the outside of the
existing, while we have the machinery on site.
Barring any major hurricanes, we would like to start this fall after the permit moratorium is over and we are clear of
Labor Day and early September boating periods.
As always, we appreciate your kind assistance on this project.
Bruce
Bruce Marek, P.E.
Bruce Marek, P.E.
5489 Eastwind Rd Wilmington, NC 28403
marekvd@ec.rr.com 910-228.2484
August 2, 2024
Ms. Tara MacPherson
NCDENR Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, NC 28405
Re: Middle Island Property Owners Association (MIPOA) CAMA 8-18 Boat Ramp Letter of Refinement
Request
Dear Ms. MacPherson.
The Middle Island Homeowners Association, Inc., (MIHOA) has retained me as authorized agent to
apply for a Letter of Refinement to LAMA Major Permit 8-18 for the existing permitted replacement
Boat Ramp. The current permit expiration date is February 27, 2028. The permit approval was based
on drawings S0.0 Cover Page — Maps & Notes; SI.0 Demolition Plan; Sl.l New Work; & S2.0 Ramp
Sections. all seal date 1-24-19 by Jeff Troutman of Criser, Troutman & Tanner.
The 9 slip Cape Creek Marina floating dock replacement has been complete for several years. A
Major Mod was issued 2-27-23 for replacement of the 40+/- year old two timber bridges to the marina
with Vinyl Sheet Pile Land Bridges. The land bridges project likewise has been completed, which
allows for truck/heavy machinery access to the boat ramp for demolition and the construction of the
replacement boat ramp.
This letter of refinement request is for changes to the approved boat ramp Sections & Details on
Troutman sheet S2.0 with my sheet Cl seal date 8-2-24. Today's request maintains the 15'-2"
permitted ramp width outside to outside of vinyl sheet pile and the will be at or shorter than the
permitted 55'-3 ''/z" horizontal length of the ramp incline, i.e. "within the permitted footprint".
The proposed changes include maintaining the top of vinyl sheet pile as a horizontal at appx +6 ML W
(Troutman calls top of fixed dock deck as +7 ML W). This is a similar detail to the VBHI Bald Head
Creek Boat Ramp. The horizontal top will be capped by a ptsyp "flat", ideally 3x14 or 4x14 CCA 2.5
treated lumber (long lead time/expensive), or with 2x8 sloppy vee or 2x6 ptsyp deck boards.
As a clarification, as we did with the land bridges, we intend to set temporary 6x6 ptsyp piles outside
of the whaler that is outside of the vinyl sheet pile, to keep straight alignment of the sheet pile.
With the highway rated land bridges in place, we are able to bring in a concrete truck to "pour" a 6"
thick concrete ramp slab as a builder option. (Troutman's concrete panel method is still a valid bid
detail). Note that my poured concrete ramp detail calls for several timber piles within the ramp
footprint as slab support/tiedown. One of several methods for boat ramp construction.
Along with the top of vinyl sheet pile and ramp detail changes, while we have equipment, on site; .w.e,
request to remove & replace or to sister new fixed dock dock piles, quantity 6..;
Bruce Marek, P.E.
Cc: Alan Reyner, MIPOA
RECEIVED
AUG 0 5 2024
DCM WIL.MINGTON, NC
-� 1 0 i
MacPherson, Tara
From: marekyd@ec.rr.com
Sent: Monday, August 12, 2024 3:40 PM
To: MacPherson, Tara
Cc: 'Alan Reyner'
Subject: RE: [External] CAMA 8-18 Middle Island POA Boat Ramp Replacement Letter of
Refinement Request
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
The LOR drawing actually provides a watertight containment structure, asthe sides will be above high tide, and I
can keep the water end, what Troutman called a cut-off wall equally high so that we are not affected by the tide. I
have no problem keeping the top of the vinyl sheet pile at the top of the dock during construction, which is at least
6 fmsl. There is a benchmark that we used to construct the land bridges to road elevation +6 fmsl that I can
transfer over to the dock. Or I can go higher, but 6 fmsl is 13" higher than the Bald Head Island Marina cap, and we
haven't flooded over that in along time at a king tide /storm event.
I'll reach out to Michael.
Bruce
Bruce Marek, P.E.
From: MacPherson, Tara <tara.macpherson@deq.nc.gov>
Sent: Monday, August 12, 2024 2:51 PM
To: marekyd@ec.rr.com
Cc: 'Alan Reyner' <alanreyner@gmail.com>
Subject: RE: [External] LAMA 8-18 Middle Island POA Boat Ramp Replacement Letter of Refinement Request
Hi Bruce,
Permit Condition No. 14 on the original permit (attached) indicates that the boat ramp shall either be
poured at an upland location and pushed into place once hardened or poured entirely within a water-
tight containment structure. We will need to send something to DWR to review to ensure that live
concrete would not contact State waters if you are requesting to change the methodology. The new
DWR contact in our office is Michael Meilinger Michael. Meilinger(ildeg.nc.gov
Thanks,
Tara
Tara MacPherson
Wilmington Region District Manager
North Carolina Division of Coastal Management
MacPherson, Tara
From: Meilinger, Michael J
Sent: Monday, August 12, 2024 4:31 PM
To: MacPherson, Tara; Luck, Cameron A
Subject: RE: [External] CAMA 8-18 Middle Island POA Boat Ramp Replacement Letter of
Refinement Request
DWR is good with the methodology described for pouring the boat ramp in the containment structure and leaving
the wall at the water end high during construction, so nothing is affected by the tide. If water does touch live
concrete, it should not be discharged to surface waters, it should be pumped to uplands. If you have any
additional questions, please let me know.
Michael Meilinger
Environmental Specialist II
NC DEQ DWR Wilmington Regional Office
Office Phone: 910-796-7341
NORTH CAROL
DKQ�5��
OePertment of Fm4onmmtal Ouel�
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: MacPherson, Tara <tara.macpherson@deq.nc.gov>
Sent: Monday, August 12, 2024 3:43 PM
To: Luck, Cameron A <Cameron.Luck @deq. nc.gov>; Meilinger, Michael J <Michael.Meilinger@deq.nc.gov>
Subject: FW: [External] LAMA 8-18 Middle Island POA Boat Ramp Replacement Letter of Refinement Request
HI, Michael, Is the methodology described below going to fly with DWR for pouring a concrete boat
ramp in place on Cape Creek (end of cape creek rd.), Bald Head Island? The original permit and
conditions are attached (se No. 14). If so, Cam are you ok with this being part of the refinement
request or should it be a Minor mod?
Thank you.
Tara
Tara MacPherson
Wilmington Region District Manager
North Carolina Division of Coastal Management
Department of Environmental Quality
910 796-7266 office
tara. macpherson(a)deg. nc.gov
127 Cardinal Drive Ext
SG-425 PROFILE VIEW SG-425 ISOMETRIC VIEW x
_.F]FAYIF-WIFp [Y[FIY WLLFYF
EXISTING &REPLACEMENT BOAT RAMP TROUTMAN S2.0 PROFILE
_- LOCATION
SEE ALSO TROUTMAN p
SO.O, S 1.0, S 1.1, S2.0 $
SG-425 PLAN VIEW SG-425 SECTION VIEW SEAL DATE 1-24-19
Shore Guard SG-425 Vinyl Sheet Pile
or per Engineer Approval
(NTS)
concrete ramp slope
000/
LETTER OF REFINEMENT REOUEST: B-2-24
1. DEMOLITION OF EXISTING BOAT RAMP 8 SITE PREP PER TFXA D 1-N-19 SEAL DATE
DRAWINGS
2. PERMITTED RALIAP FOOTPRINT REMAINS THE SAME
3. 8• THICK SITE POURED' CONCRETE RAMP IS NOW A BUILDER OPTION SINCE THE COVINETION
OF THE TWO LAND BRIDGES.
4. TOP OF VINYL SHEET PILE RAMP SIDEWALLS TO BE HORIZONTAL, MATH TOP ELEVATKKNAPFX
M WW (APPX BOTTOM OF FIXED DOCK SIDE BA IO BOARD)
S. TEMPORARY SAS PTSYP PILED TO BE INSTALLED TO OUTER SIDE OF SRI PTSW WHALERS TO
OUTSIDE OF SHEET PRE FOR INITIAL ALIGINMEMAXNNSiRUCTKKN.
S. PTSW TOP CAP OF VINYL SHEET PILE BUILDER OPTION. 3X14 PTSYP SHOINN AS ONE OPTION.
T IF PODRED CONCRETE. BUILDER TO ADD SXS OR 8X8 PTSYP EMBED® PDSTL MATH I- -Ip
EMBED INTO CONCRETE. OR ROUND TIMBER PILES CCA 2S PER FN JNFFR 11L 1J0. R IN
S. POURED CONCRETE CAN BE FIBER REINFORCED OR WTH REDAR PER ENGINEER
DISCUSSION. IF gEBM.ONE MAT OF r5 EPoXYfRPBARSAT IB• EA WAY.
9. REPLACEFIXF.ODOCKDOCKRLESORSISTERNEWPILESTOEXISTINGVMILEHEAW
EOUPMQNT IS ON SITE. BUILDER TO DISCUSS WITH ENGINEER OPTIMI9N$ST SEOUEENCWG
FOR PILE WORK
ALL LUMBERTFIMSERIPILES TO BE MARINE TREATED PTSYP OR BETTER
ALL FASTENERS TO BE HIM OR BETTER (STAINLESS STEEL CONSIDERED EQUAL OR BETTER)
PLACE SILT FENCE AS DIRECTED BY THE BUILDING INSPECTOR ANDAO B NEER
MAREK PROFILE 8-2-24
15 '-2'f
Permitted Width
1 NO HOG tie I
rods Max 6' iI
O.C.
Thru 6x6 ptsyp III
M4K16 41 0.0 FMSL Whaler I I
II
//Z�
V..
r -- --
II
0' _ 5' 10' 15' u 20'
CAMA 8- 18
iLETTER OF REFINEMENT DWG C 1
EXISTING & REPLACEMENT BOAT 8 ""2""2
RAMP LOCATION RECEIVED
AUG 0 5 2024
DCM WILMINGTON,
BOAT RAMP LOCAfk
LPPX 1 MILE EAST OF OLD
rA CA f�mF F-v ILA A FIFu.
BRUCE MAREK, P.E.
5489 EASTWIND RD WILNINGTON
NORTH CAROLINA 28403
(OI n)11f 10A.A