Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
74-03 Johnson, Mack
t Permit Class Permit Number NEW 74-03 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission it for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Mack Johnson, 6252 Inlet Watch Drive, Southport, NC 28461 Authorizing development in Brunswick County at Cape Fear River, 6252 Inlet Watch Drive, Southport , as requested in the permittee's application dated MP-1 dated 10/4/02. MP- 2 dated 2/14/03 inc. attached workplan drawings (2), workplan dated Received 2/14/03, profile dated 5/6/03 This permit, issued on June 4, 200-3 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility Modification 1) This permit authorizes only the docks, piers, and other structures located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, may become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 2) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. f/ DgAda D. Moffitt, Director Any maintenance work or project modification not covered D1V1SlOri Of Coastal Management hereunder requires further Division approval. All work must cease when the permit expires on This permit and its conditions are hereby accepted. December 31, 2006 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee � 1 i Mack Johnson Permit#74-03 Page 2 of 3 ADDITIONAL CONDITIONS 3) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 4) The authorized structure and associated activity must not cause an unacceptable interference with navigation. 5) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 6) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 7) The permittee must install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors should be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 8) This permit authorizes a maximum of 4 boat slips. At no time shall more than 4 vessels be moored or docked at the facility. The restriction of the number of vessels shall apply to all marine vessel types, including but not limited to motorboats, sailing vessels and personal watercraft. NOTE: The permittee is cautioned that this permit does not authorize the placement of mooring pilings in association with the docking facility. Furthermore, boats utilizing the docking facility may be subject to frequent wavewash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the structure and the safety of moored boats. The permittee shall not hold the State of North Carolina or the United States liable for any damage to the structure or moored boats. General 9) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. Mack Johnson Permit#74-03 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 395-3900 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The permittee and/or his contractor is urged to meet with a representative of the Division prior to project initiation. NOTE: The N.C. Division of Water Quality has assigned the proposed project DWQ Project No. 030231. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under General Permit No. 197800056 (COE Action Id. No. 200300509) which was issued on 5/8/03. Affl4i;x! NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary June 4,2003 Mr.Mack Johnson 6252 Inlet Watch Drive Southport,NC 28461 Dear Mr.Johnson: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original(buff-colored form)is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1 or 113- 229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor,it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site'. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions,environmental safeguards, or problem areas,you may contact Department personnel at any time for assistance.By working in accordance with the permit,you will be helping to protect our vitally important coastal resources. Sincerely, Douglas V..Huggett w Major Permits and Consistency Manager Enclosure 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-22931 FAX:'919-733-14951 Internet: http://dcm2.enr.state.nc.us An Equal Opportunity 1 Affirmative Action Employer-50%Recycled 110%Post Consumer Paper t a DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Mack Johnson PROJECT: Floating Dock Addition 2. LOCATION OF PROJECT SITE: 6252 Inlet Watch Drive at The Landing, Southport Photo Index - 2000: 10-96 Grid Q-19 1995: 10 -94 Grid O,P-21 State Plane Coordinates - X:2 304 000 Y: 65 800 GPS P022419 A 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - February 24, 2003 Was Applicant Present - Agent Was Present 5. PROCESSING PROCEDURE: Application Received - cc: February 24, 2003 Office- Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - City of Southport Land Classification From LUP - Transition Residential (B) AEC(s) Involved: Public Trust, Estuarine Waters (C) Water Dependent: Yes (D) Intended Use: Private Boat Slips (E) Wastewater Treatment: Existing- City of Southport Municipal Planned -No Changes (F) Type of Structures: Existing - Single Family Home, Private Pier With 2 Boat Lifts Planned - Floating Dock With 2 Additional Boat Slips (G) Estimated Annual Rate of Erosion: N/A Source -N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Open Water 405 sf of shading by ramp & float (B)Non-Vegetated Wetlands (C) Other (D) Total Area Disturbed: 405 square feet (E) Primary Nursery Area : No (F) Water Classification: SC Open: No PROJECT SUMMARY: The applicant proposes to add an 8'by 40'floating dock to the waterward end of an existing pier on the Cape Fear River. Mack Johnson Page 2 -------------------------------------------------------------------------------------------------------------------------------- PROJECT DESCRIPTION: The applicant, Mr. Johnson, is the owner of a private home in The Landing Subdivision in Southport, Brunswick County. The Landing Subdivision is located off of East Moore Street, north of the downtown area and south of the Southport Ferry Terminal. Mr. Johnson has an existing home situated on a .61 acre lot at 6252 Inlet Watch Drive off of Peeble Shore Lane. The lot borders the Cape Fear River. The shoreline of the lot is 100' wide and natural with federal wetlands separating the high ground from the shoreline of the River. In September of 2001, Mr. Johnson obtained a CAMA General Permit (#28212-D) which authorized construction of a private pier with 2 uncovered boat lifts at the waterward end. The structure was subsequently built in accordance with the General Permit. However, due to the shallow near-shore water depths, Mr. Johnson is able to utilize the boat lifts only near high tide. He is herein requesting to add an 8' by 40' floating dock waterward of the existing boat lifts. The purported water depth at mean low water at the end of the proposed floating dock is 28". The floating dock could be used to moor the boats until the tide rose enough to get the vessels safely back into the existing lifts. The two existing uncovered boat lifts and the proposed 40'long floating dock would provide potential dockage for at least four boats with a possibility for up to six boats, depending upon the size of boats. The proposed overall length of the walkway/pier/dock structure is 306'. The length of the proposed structure would not exceed 1/4 width of the open water body, which is very wide in this location. The proposed structure would be approximately 25'to 30' longer than the adjacent pier. The additional boat slips (more than 2)has required that this project be reviewed through the CAMA Major Permit process. The area where the existing pier and boat lifts are located has been designated as public trust and estuarine waters by the Division of Coastal Management. The waters of the Cape Fear River in this area have been classified as SC by the Division of Water Quality. The waters are closed to shellfishing and are not Primary Nursery Areas. Water depths near the shoreline are shallow but get very deep near the shipping channel. ANTICIPATED IMPACTS: Impacts from this project will include the shading of approximately 405 square feet of estuarine and public trust waters where the proposed ramp and floating dock would be situated. The floating dock would add 320 square feet of dockage and 57' of length to the existing pier structure. The proposed dock will provide opportunity for more boat slips in the water. No high ground or wetlands should be impacted as a result of this project. There could be some temporary shallow bottom impacts and increased turbidity resulting during installation of the proposed float. There should be no impacts to navigation. Janet M. Russell/February 24, 2003 /Wilmington Recommendations for State Permit- MACK JOHNSON The Wilmington Office,Division of Coastal Management,recommends that the permit be issued with the following conditions: NOTE: A ramp and a 8'by 40' floating dock are being authorized by this permit. 1. A total of two (2)boat slips, temporary moorings or temporary tie-ups are being authorized along the proposed 40' floating dock. One slip is authorized on each side of the floating dock. 2. Dredging in any manner, including"kicking"with boat propellers, is not authorized. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 3. Floatation units under the floating dock shall be constructed of materials which will not become waterlogged or sink when punctured. 4. No sewage,whether treated or untreated, shall be discharged at any time from boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 5. The ramp and floating dock structure shall have a minimum setback distance of 15'between any parts of the structure and the adjacent property lines as extended perpendicular to the channel into the water at the points where they intersect the shoreline. 6. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 7. The authorized structures and associated activities must not cause an unacceptable interference with navigation. 8. This permit authorizes only the ramp and floating dock that are expressly and specifically set forth in the permit application. No other structures, whether floating or stationary, may become a part of this facility without permit modification. No non-water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 9. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard,through regulations or otherwise on authorized facilities. 10. This permit does not authorize the interference with any existing or proposed Federal project. The permittee will not be entitled to compensation for damage to the authorized structures or work, or injury which may be caused from existing or future operations undertaken by the United State in the public interest. 11. No coastal or federal wetlands are to be filled as a result of this project. 12. Permanent reflectors should be attached to the ends of the pier structures in order to make them more visible during hours of darkness or inclement weather. Note: An as-built survey may be required after construction to check for compliance. Form DCM-MP-1 .APPLICATION C TI OI\T (To be completed by all applicants) b. City, town, co unity of landmark- 1. APPLICANT c. Street address or secondary road number a. Landowner: — �°r} °2 -:EA l''U'q 'G t4 Name k- d. Is proposed work�ww in city limits or planning jurisdiction? _1,� _ Tes No Address /n SoZ —T l/W IIJ44CJ G� e. Name of body of water nearest project (e.g. rive , City__ ayTTs04 State �" creek, sound, bay) �,o�¢!� , , Zip Day Phone Fax 21,j 05--26 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT b. Authorized Agent: Name a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead,pier,and excav io and/ r filling activities. / / Address .9 c,< 7`6 City State Zip Day Phone b. Is the proposed activity maintenancp of an exi ing project, new work,J or both? 4 , 1/ Fax x ap�rq c. Will tbefor ublic,private or commercial // /� use? VAC c. Project name (if any) Gaa ;'4 00 d. Give a brief description of purpose, use,methods of construction and daily operations of proposed NOTE. Permit will be isnwd in name of tandmcnerft),andlor project. If more space is needed, please attach additional pages. project name. Q 4 Z. LOCATION OF PROPOSED PROJECT a. County to � 111 Revised 03/95 OF Form DCM-MP-1 m. DescribetxistiM wast water treatment facilities. 4. LAND AND WATER t � . CHARACTERISTICS a. Size of entire tract n.. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary b. Size of individual lot(s)/CO 474 4U,4` 2 wastewater, industrial/commercial effluent, "wash down" and residential discharges.) c. Approximate elevation of tract above or NWL ' I/ST ' A4 o yA• 24 ve— d. Soil type(s) and texture(s) of tract o. Describe existing drinking water supply source. e. Vegetation on tract y�Ar�K _11n el f. -made features now on tract �� � Xo •/ o 5. ADDITIONAL INFORMATION g. What is the CAMA Land Use Plan land In addition to the completed application form, the classification of the site? (Con=Ir Lhe local land use plan.) following items must be submitted: Conservation Transitional Developed Community � A copy of the deed (with state application only) or Rural Other other instrument under which the applicant claims title to the affected properties. If the applicant is not h. How is the act zon by o governrpent? 1,C claiming to be ffie owner of said property, then �,G// (� forward a copy of the deed or other instrument under which the owner claims title, plus written permission i. Is the prop sdprojconsistent with the applicable from the owner to carry out the project. zoning? Yes No (Anach zoning co lice amfi�e, lfzT��kl accurate, dated work plat (including plan view and cross-sectional drawings)drawn to scale,in black J. Has a professional archaeological assessment been ink on an 8 112" by 11" white paper. (Refer to done for the tract? IYes No Coastal Resources'Commission Rule 7J,0203 for a If yes, by whom? detailed description.) k. Is the project located in a National Registered Please note that original drawings are.preferred and Historic District or does it involve a National only high quality copies will be accepted. Blue-line Register listed o igible property? prints or other larger plats are acceptable only if an Yes _ No adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of 1. Are there wetlands on the.st;e? Yes _ No Engineers regarding that agency's use of larger ` drawings A site or location m is a art of lat Coastal (marsh)_�'Q.f%h'�r ":�; drawings.) map P P If yes, has a delineation-f;ien cono4o' p \Ie-5 requirements and it must be sufficiently detailed to (.Arad,dom„ ;o„, ikj �, guide agency personnel unfamiliar with the area to the 1 Revised 03/95 Form DCM-MP-1 t' site. Include highway or secondary road (SR) ,t numbers, landmarks, and the like. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND • A Stormwater Certification, if one is necessary. • A list of the names and complete addresses of the I understand that any permit issued in response to this adjacent waterfront (riparian) landowners and application will allow only the development described in signed return receipts as proof that such owners the application. The project will be subject to conditions have received a copy of the application and plats and restrictions contained iz the permit. by certified mail. Such landowners must be advised that they have 30 days in which to submit comments I certify that to the best of my knowledge, the proposed on the proposed project to the Division of Coastal activity complies with the State of North Carolina's Management. Upon signing this form, the applicant approved Coastal Management Program and will be further certifies that such notice has been provided. conducted in a manner consistent with such program. Name Li4 clJ,�' I certify that I am authorized to grant, and do in fact, Address gdn .-;Ak�- grant permission to representatives of state and federal Phone _�/D - �S;2-Z,00-6 , review agencies to enter on the aforementioned lands in �� f connection with evaluating information related to this Name 6 permit application and follow-up monitoring of the Address A.csproject. Phone V&V 1 further certify that the information provided in this Name Address application is truthful to the best of my knowledge. Phone • A list of previous state or federal permits issued for This is the_ day of aG'it", 19--aQ0 0 work on the project tract. Include permit numbers, Print Name c permittee, and issuing dates. _, /Q c�c� Signature Landowner or AwhoriZ gent • A check for$250 made payable to the Department of Please indicate attachments pertaining to your proposed Environment, Health, and Natural Resources project. (DEHNR) to cover the costs of processing the _ DCM I��p 2 Excavation and Fill Information application. _ DCM Ne-3 Upland Development • A signed AEC hazardr/DCM MP-4 Structures Information notice for projects in DCM MP-3 Bridges and Culverts oceanfront and inlet areas. DCM MP-6 Marina Development • A statement of compliance with the N.C. NOTE: Please sign and date each attachment in the Environmental Policy Act (N.C.G.S. 113A 1 to space provided at the bottom of each form. 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Revised 03/95 Form DCM-MP4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major e. Mooring buoys Permit, Form DCM-MP-1. Be sure to complete all (1) _ Commercial _Community —Private other sections of the Joint Application which relate to (2) Number this proposed project. (3) Description of buoy a. Dock(s) and/or Pier(s) (Color, inscription, size, anchor, etc.) (1) _ Commercial _Community_Private (2) Number / (3) Length _a_$Z EXf r'oo'Z S� (4) Width of water body (4) Width `,- �&J".Az' (5) Distance buoy(s) to be placed beyond (5) Finger Piers Yes _22 No shoreline (i) Number (i i) Length f. Mooring structure 62Dmooring pilings etc.) (iii) Width (1) _ Commercial _Community Private (6) Platform(s) " Yes Non (2) Number (i) Number / ,D'-0Id0_5 1 1�loR� (3) Length (ii) Length 1 � (4) Width ui Width (7) Number of slips proposed -t 'o�4as Other (Give complete description) an (8) Proximity of structure to adjacent ripar property lines &5/ (9) Width of water body _Ao.ee (10) W r depth at waterward end of pier at r NWL fE 7e A o�t�✓�f b. Boathouse (including covered lifts) (1) Commercial Private(2) Length J o k n se (3) Width Applicant or Project Name c. Groin (e.g. wood, shertpile, etc.) Sipature (1) Number (2) Length(s) Date d. Breakwater (e.g. wood, sheetpile, etc.) (1) Length (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MEW NWL or ; wetlands kit:i 1 7'= ' 201931 j i ` Mack Johnson Existing Pier 6252 Inlet Watch Drive Southport, NC "V4 r r' Mack Johnson Existing Pier 6252 Inlet Watch Drive Southport, NC ,f£` .'�'a .. w• m-'�`+wk.,t.K "'.3�$ ✓.�,,, a4 F4`aS agog b r e JN A ` f .. .. J '� ,, x., .ors f., �` �f•A• �• off, i 1Jt � min t �.,a � -t. : •.� 't r' , ar a r tj kt $ r rF. 4 4D' 5� . Sy 'f•' , 1c12 �'1 f�fii �itl - Y. _.r.Y AL J�� Mack Johnson Existing Pier 6252 Inlet Watch Drive Southport, NC 77, j y SV 1 Aa u z { � S'kG �'jj{{f ���' � � =`+•tea•- p4�'.tr M u N p` R t t,. ., _ .. '. ....., ... e.. ... k�.. We are asking to add a floating dock to our existing pier and boatlift. This is due to the miscalculations made when the existing pier and boatlift were constructed. We originally had a permit issued in 1999 for 300 feet of pier. We reapplied in August 2001 for a 200-foot pier. Both were approved. When our dock was constructed we thought that 150 feet would be adequate however upon using the lift we found out that we made a big mistake. Our large boat could not be put on the lift except within an hour of high tide. At low tide there is only 10"of water. Since there is no place to moor the boat at the end of the dock this made the lift unusable. After fishing offshore you cannot time your arrival and departure around the tide. To correct the situation we had 2 choices: 1. Extend the pier and boat lifts another 150 feet to get 48"of water at low tide. The boatlift itself takes up 20" on the bottom. 2. Extend a floating dock so that the boat could be moored temporarily waiting for the tide to rise so that the boat could be put back on the lift. We feel that option number 2 is the best option. We have asked for the minimum length to give us 28"of depth at low tide at the waters end. This is the minimum for the motors at the stern to have enough water to nudge the boat in and tie up until the tide raises enough to put the boat on the lift. A floating dock minimizes the length of dock required and is more aesthetically pleasing due to its low profile rather than 150 of additional pier. Thank you for your consideration. Mack Jo n i r ' 3 N Ll a �1X�5 1n'J p'e� 0 o CJ d a - F/ r ❑ Cfl Cil Q7 4cm:��� RECEIVED U.S. ARMY CORPS OF ENGINEERS MAY 0 q 2003 WILMINGTON DISTRICT DN.0FC0A6TALMAN G9AEW WOW Action Id. 0100—a oD5o4 County (' k GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property owner _ Matl t:�D kA(561n Address (a52 1&1d- r+ Telephone No. 016 ''__11 J, Size and Location of project(water body, road name/number, town, etc.)_ 6"Te- IyCa. >°l CL T&12i 1 A ►4�G� O rLy e �a-C� . At- At-Q, r p e— Et4 r Riy r Description of Activity d 9A S X �y z ( lo4- iNS W4 rL�.brd _ o-C a.Y*- 21C i!L r. Applicable Law: Section 404 (Clean Water Act, 33 U.S.C. 1344). (check all that apply) .Section 10 (River and Harbor Act of 1899). Authorization: 019H0 0S6 Regional General Permit Number. Nationwide Permit Number. Your work is authorized by this Regional General(RGP)or Nationwide Permit(NWP)provided it is accomplished in strict accordance with the attached conditions and your submitted plans. If your activity is subject to Section 404 (if Section 404 block above is checked), before beginning work you must also receive a Section 401 water quality certification from the N.C. Division of Environmental Management, telephone (919) 733-1786. For any activity within the twenty coastal counties, before beginning work you must contact the N.C. Division of Coastal Management, telephone (919) 733-2293. Please read and carefully comply with the attached conditions of the RGP or NWP. Any violation of the conditions of the RGP or the NWP referenced above may subject the permittee to a stop work order,a restoration order,and/or appropriate legal action. This Department of the Army RGP or NWP verification does not relieve the permittee of the responsibility to obtain any other required Federal, State, or local approvals/permits. The permittee may need to contact appropriate State and local agencies before beginning work. If there are any questions regarding this authorization or any of the conditions of the General Permit or Nationwide Permit, please contact the Corps Regulatory Official specified below. Date 5- $-b3 Corps Regulatory Official LTelephone No. 34 ;LSI-Y93D Expiration Date of Verification SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORMS, PROJECT PLANS, ETC., MUST BE ATTACHED TO THE YELLOW(FILE) COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. CESAW Form 591 DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD A) APPLICANT: Mack Johnson County: Brunswick LOCATION OF PROJECT: 6252 Inlet Watch Drive, Southport DATE APPLICATION RECEIVED COMPLETE BY FIELD: February 24, 2003 FIELD RECOMMENDATION: Attached: YES To Be Forwarded:No CONSISTENCY DETERMINATION: Attached:No To Be Forwarded:Yes FIELD REPRESENTATIVE: Russell DISTRICT OFFICE: Wilmington DISTRICT MANAGER REVIEW: B) DATE APPLICATION RECEIVED IN RALEIGH: : ;'_ FEE REC'D:$ Q57D-W PUBLIC NOTICE REC'D: ✓ 03 END OF NOTICE DATE: U kvlo`"ADJ�RIP. PROP NOTICES REC'D: ✓ DEED REC'D: ✓ APPLICATION ASSIGNED TO: Gv/svn ON: 2 C) 75 DAY DEADLINE: -i/iy1o3 150 DAY DEADLINE: MAIL OUT DATE: 03 STATE DUE DATE: '5 I ,A W(0 3 FEDERAL DUE DATE: FED COMMENTS REC'D: '5'aje3 PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY DATE COMMENTS OBJECTIONS: NOTES RETURNED YES NO Coastal Management-Regional Representative °Z p$(b3 Ck Coastal Management-LUP Consistency Division of Community Assistance Land Quality Section Division of Water Quality 3/lL'e 3 xx o 3 da3 tvo ��yw� Storm Water Management(DWQ) 3��s ✓ State Property Office Division of Archives&History Division of Environmental Health Division of Highways s1a4 Im3 Wildlife Resources Commission Z1 O Division. of Water Resources Division of Marine Fisheries 3/ g Submerged Lands(DMF) uS PRC-E Ni f) t± a003005 09 C-,P Iq-is no c6 t- on 518 to 3 Permit# -1 4-03 DCM Coordinator: Sc.n MAILING DISTRIBUTION: Permitee: Agent: N DCM Field Offices: Elizabeth City Morehead City Washington Wilmington US Army Corps of Engineers(USACE): Washington: Mike Bell (NCDOT) Bill Biddlecome(NCDOT) Raleigh Bland Wilmington: Dave Timpy(NCDOT) Henry Wicker Others: Cultural Resources: Renee Gledhill-Early Environmental Health: Beverly Sanders Marine Fisheries: Mike Street NCDOT: Roberto Canales Shellfish Sanitation: Patty Fowler State Property Office: Joseph Henderson Water Quality: John Dorney John Hennessy(NCDOT) Water Resources: John Sutherland Wildlife Resources: David McHenry Bennett Wynne David Cox(NCDOT) Travis Wilson (NCDOT) FAXING DISTRIBUTION: Permitee at Agent at DCM Field Offices: Elizabeth City Morehead City Washington Wilmington US Army Corps of Engineers(USACE): Washington: Mike Bell (NCDOT) Bill Biddlecome(NCDOT) Raleigh Bland Wilmington: Dave Timpy (NCDOT) Henry Wicker NCDENR North Carolina Department of Environmentrtd Natural Resources Division of CoasW ManagemeM Michael F.Frey,Gavenror Donna D. MoM Director William G.Ross Jr.,Secretary {I 1 Match 3, 200� 1 CERTIFIED MAIL ? RETURN RECEIPT REQUESTED. Mack Johnson 3 6252 Inlet Watch Dr. Southport, NC 28461 Dear Mr. Johnson: This letter is in response to your application request under the Coastal (CAMA) to construct a floating dock on your property �a Management Act Brunswick Count NC. p ICY located bn the Cape Pear River in Southport, Y, Processing of the permit application, *hich was accepted complete by the Division of Coastal Managert=t"s Wilmington office on Febcuar wever, -t has been determined that additional information will be required priou� to the Dv, taking oral action on your application. These items are summarized below: f 1. In accordance with T15A:07J.0203 a ( ), "P1nDjet L plans of work plats must include a top or plan view, a cross-sectional view, and a location map." No cross-sectional view was pry with your application. 2- In accordance with T15A:071.0203 (b)(1), Details of Work Plats, "Existing water depths must be indicated wing mean low water as base or zero.- No water depths are shown on the work plats provided. i In that the,rules of the Coastal Resources Commission state that -If the application is found to be incomplete or inaccurate after processing has begun or if additional information from the applicant is necessary to adequately assess the project, the processing shall tenninated ncc , than �, � pending nxcipt of the �sary changes or necessary information froran the applicant." 15A:07J.0204(d)j, the Division has determined that in cases such as this, the additional information req by this letter must be obtained prior to the issuance of a CAMA permit Therefom, it is n application be placed in abeyance until such time as the uest©d i that passing of yotu permit provided to this office. "� ra ornaation for the proposed project is i As required by T15A:07J.0204(d), during the pendency ofi any termination of procng, the perrruit proccssing period will not nun. Upon resolution of the above listed item, the Divisions of�Coastal Management will resume processing of the application at the point wl}ere it was terminated, 1638 Mail Service Center, Raleigh,North Carolina'�27699-16W Phone: 919-733-22931 FAX; 919-733-1495 t fntemet httpJ/Ww*.rxzoa.sWmana9of gM.r)et M EqW ePPm��NfiftaM kfion enoc yw-so%Recycled 1 t k Post cwarwPper i i Z ' d 9LS0-bSb-OI6 wnixij dEb : SO EO 90 Few , f If you have any questions concetna,n these (919) 733-2293,extension 247 or email Mr at klisti nlat Tease fecl fret to caonwi me by telcphoac 'onncmail,net. i Sinceirly, Kristie F. Corsott I Assistant Fern its & Consistency Coordinator c1c: Yanet Fussell bCM, 1l�oreh ��' Wiltr;i�ngton ! ead City s ; 4 f f ; f i t ( s i t f i ; f sy i E ' d 9LS0-bSb-OI6 wnixu dEb : SO CO 90 �;eW •a I MEMORANDUM MAR 0 4 2003 TO: Doug Huggett Major Permits Processing Coordinator DIV.OF COASTAL MANAGEMENT RALE10H FROM: James E. Rosich,AICP Wilmington District Planner SUBJECT: CAMA Major Permit Application Land Use Plan Consistency Determination: Mack Johnson—City of Southport, Brunswick County DATE: February 27, 2003 The applicant is proposing to add a floating dock(8 feet by 40 feet)to an existing pier on the Cape Fear River. The proposed project site is located within the City of Southport at 6252 Inlet Watch Drive in the Landing subdivision. According to the Division's Field Investigation Report,Public Trust Area and Estuarine Waters Areas of Environmental Concern (AECs)will be impacted. Waters at the site are classified SC, and are closed to shellfishing. Waters are not designated as Primary Nursery Area(PNA). This development proposal has been reviewed for consistency with the City of Southport 1997 Land Use Plan. The land classifications for this are Conservation(above listed AECs)and Urban Transition Residential (upland portion of the site). According to the LUP,the Conservation land classification is designed to provide for effective long-term management of significant,limited or irreplaceable areas which include AECs. Development in the estuarine system should be restricted to such uses which satisfy 15A NCAC 7H use standards and the City of Southport zoning ordinance. The Urban Transition Residential land classification includes areas that are presently being developed for urban residential purposes, and is designed to provide lands to accommodate future urban growth within the planning period. The following LUP policies are applicable to this project: Residential. Commercial and Industrial Development Impacts on Resources: the City of Southport will allow development within:Areas of Environmental Concern. The City will rely on 15A NCAC 7H, and its subdivision and zoning ordinances to regulate development within AECs. Marine Resource Areas: The City of Southport supports responsible usage and development in marine resource areas. The City will rely on 15A NCAC 7H.0207 to regulate use and development within estuarine and public trust areas;for structures that extend into over estuarine and public trust waters, replacement of structures and/or change of use will be allowed so long as the structure is consistent with or allowed by the CRC. This proposed project appears to be consistent with the Land Use Plan provided all local, state and federal regulations are met. cc: Charles S. Jones,DCM Rob Gandy, City of Southport File 40a Ma NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary February 26, 2003 MEMORANDUM RECCEIVED TO: Ms. Melba Laney WR U #5 2003 for: Mr. William A. McNeil, Director OIV OF COASTALM"GEMW Division of Community Assistance RALEIGH FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Mack Johnson Project Location: 6252 Inlet Watch Drive at The Landing, Southport Proposed Project: To add an 8' by 40' floating dock to the waterward end of an existing pier on the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and return this form by March 26, 2003 If you have any questions regarding the proposed project, please contact Janet M. Russell at Ext. 249. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845 Phone: 910-395-3900\Fax: 910-350-2004\Internet: http://dcm2.enr.state.nc.us An Equal Opportunity\Affirmative Action Employer-50%Recycled\10%Post Consumer Paper MAR.26.2003 4:39PM NCDENR WIRO NO. 186 P.3 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F, Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary Febru uy 26, 2003 MEMORANDUM TO: Ms. Noelle Lutheran for: Mr, Alan W, Klimek, P.E., Director Division of Water Quality FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant; Mack Johnson Project Location: 6252 Inlet Watch Drive at The Landing, Soutliport Proposed Project: To add an 8' by 40' floating dock to the waterward end of an existing pier on the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and return this form by March 26, 2003 If you have any questions regarding the proposed project, please contact Janet M. Russell at Ext. 249. When appropriate, in-depth comments with supporting data is requested, REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project, This agency approves of the project only if the recommended changes are incorporated. See attached, This agency objects to the project for reasons described in the attached comments, SIGNEri DATE _n,U,n 3-14 14 72 127 Cardinal drive Extension, Wilmington, North Carollrla 28405-3845 Phone: 910-395-39001F'ax: 910-L350-2004 1 Internet; http://dcm2•enr,state,nc.us An Equal Opportunity 1 Afflrma(ve Action Employer,50% Recycled 110%post Copsurper paper NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary February 26, 2003 MEMORANDUM TO: Fritz Rohde Mr. Preston P. Pate, Jr., Director Division of Marine Fisheries KW FROM: Doug Huggett Major Permits Processing CoordinatorSUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Mack Johnson Project Location: 6252 Inlet Watch Drive at The Landing, Southport Proposed Project: To add an 8' b 40' floating dock to the waterward end of an existing pier on the Cape Fear River/�/3t-q 1,iS&v 1"(7 e C au NUJ Please indicate below your agency's position or viewpoint on the proposed project and return this form by March 26, 2003 If you have any questions regarding the proposed project, please contact Janet M. Russell at Ext. 249. When appropriate, in-depth comments with supporting data is requested. REPLY: �s agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED4�3,A kJ DATE / 127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845 Phone: 910-395-3900\Fax: 910-350-2004\Internet: http://dcm2.enr.state.nc.us An Equal Opportunity\Affirmative Action Employer-50%Recycled\10%Post Consumer Paper A aWA NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary February 26, 2003 MEMORANDUM MAR 0 4 2003 TO: Mr. Charles F. Stehman, P.G., Ph.D. DIV OF CO,*TALMANAGEMENT Division of Water Quality/Groundwater Section RALEIOH FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Mack Johnson Project Location: 6252 Inlet Watch Drive at The Landing, Southport Proposed Project: To add an 8' by 40' floating dock to the waterward end of an existing pier on the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and return this form by March 26, 2003 If you have any questions regarding the proposed project, please contact Janet M. Russell at Ext. 249. When appropriate, in-depth comments with supporting data is requested. REPLY: his agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. (2Z SIGNED DATE 127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845 Phone: 910-395-3900\Fax: 910-350-2004\Internet: http://dcm2.enr.state.nc.us An Equal Opportunity\Affirmative Action Employer-50%Recycled\10%Post Consumer Paper ag .. NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary February 26, 2003 MEMORANDUM TO: Mr. James Rosich, Community Planner DCM/WiRO FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Mack Johnson Project Location: 6252 Inlet Watch Drive at The Landing, Southport Proposed Project: To add an 8' by 40' floating dock to the waterward end of an existing pier on the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and return this form by March 26, 2003 If you have any questions regarding the proposed project, please contact Janet M. Russell at Ext. 249. When appropriate, in-depth comments with supporting data is requested. REPLY: X This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED s DATE 127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845 Phone: 910-395-3900\Fax: 910-350-2004\Internet: http://dcm2.enr.state.nc.us An Equal Opportunity\Affirmative Action Employer-50%Recycled\10%Post Consumer Paper AJ �\ NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F.Easley,Governor Donna D. Moffitt, Director William G.Ross Jr.,Secretary May 7,2003 MEMORANDUM RECEIVED TO: Bennett Wynne MAY 15 2003 Wildlife Resources Commission ATTN: Habitat Conservation Program DIV.OF COASTAL MANAGEMENT RALIFIM FROM: Doug Huggett Major Permits Processi:;g Coordinator SUBJECT: CAMA PERMIT APPLICATION REVIEW APPLICANT: MACK JOHNSON PROJECT LOCATION: 6252 INLT WATCH DRIVE AT THE THE LANDING, SOUTHPORT. PROPOSED PROJECT:ADD AN 8' BY 40' FLOATING DOCK TO THE WATERWARD END OF AN EXISTING PIER ON THE CAPE FEAR FIVER. Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 28, 2003. If you have any questions regarding the proposed project, please contact Doug Huggett at (919) 733-2293, ext. 244. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. t// This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. This agency obje s to the project for reasons described in the attached comments. SIGNED.- DATE ;���� 3 70. 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293\FAX: 919-733-1495\ Internet: http:lldcm2.enr.state.nc.us An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper RECEIVED MAY 2 3 2003 WCDENR DIV.OF COASTAL MANAGEMENT North Carolina Department of Environment and Natural Resources RAALEIGH Division of Coastal Management Michael F.Easley,Governor - Donna D. Moffitt, Director William G.Ross Jr.,Secretary May 7,2003 MEMORANDUM �03, i 4 TO: Ms. Renee Gledhill-Early, Director MAY 8 2003 4 Division of Cultural Resources Archives & History Building RSTORC PP,7%WATION%FCE 64� 42w4- FROM: Doug Huggett 6111 /1y C3 Major Permits Processing Coordinator r SUBJECT: CAMA PERMIT APPLICATION REVIEWlxo 1 k APPLICANT: MACK JOHNSON PROJECT LOCATION: 6252 INLT WATCH DRIVE AT THE THE LANDING, SOUTHPORT. PROPOSED PROJECT: ADD AN 8' BY 40' FLOATING DOCK TO THE WATERWARD END OF AN EXISTING PIER ON THE CAPE FEAR FIVER. Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 28, 2003. If you have any questions regarding the proposed project, please contact Doug Huggett at (919) 733-2293, ext. 244. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. t agency o 'ects th roLect to reasons described in the attached comments. SIGNED DATE 24 03 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293\FAX: 919-733-1495\ Internet: http:lldcm2.enr.state.nc.us An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper MAY 1 2003 )l(k' 117 Ai_ NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F.Easley,Governor Donna D. Moffitt, Director William G.Ross Jr.,Secretary May 7,2003 MEMORANDUM RECEIVED TO: Mr. Roberto Canales RECEIVED State Construction/Materials Branch MAY . 2003 Division of Highways DwoFCOASTALM"UM FROM: Doug Huggett RALEIGH Major Permits Processing Coordinator SUBJECT: CAMA PERMIT APPLICATION REVIEW APPLICANT: MACK JOHNSON PROJECT LOCATION: 6252 INLT WATCH DRIVE AT THE THE LANDING, SOUTHPORT. PROPOSED PROJECT: ADD AN 8' BY 40' FLOATING DOCK TO THE WATERWARD END OF AN EXISTING PIER ON THE CAPE FEAR FIVER. Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 28, 2003. If you have any questions regarding the proposed project, please contact Doug Huggett at (919) 733-2293, ext. 244. When appropriate, in-depth comments with supporting data is requested. REPLY t_� This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. This agency objects to the project for reasons described in the attached cornrnents. SIGNED - DATE 'MA-3 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293\FAX: 919-733-1495\ Internet: http://dcm2.enr.state.nc.us An Equal Opportunity\Affirmative Action Employer-50%Recycled 110%Post Consumer Paper 111AA-0 R REE E I ki�; NCDENR ?1 MAY 0 8 inn, North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F.Easley,Governor Donna D. Moffitt, Director William G.Ross Jr.,Secretary May 7,2003 MEMORANDUM RECEIVE TO: Mr. Joseph H. Henderson, Director MAY 2 7 2003 State Property Office Department of Administration DW.ofCDA$TALMANAGEMENT LEiQH FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA PERMIT APPLICATION REVIEW APPLICANT: MACK JOHNSON PROJECT LOCATION: 6252 INLT WATCH DRIVE AT THE THE LANDING, SOUTHPORT. PROPOSED PROJECT: ADD AN 8' BY 40' FLOATING DOCK TO THE WATERWARD END OF AN EXISTING PIER ON THE CAPE FEAR FIVER. Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 28, 2003. If you have any questions regarding the proposed project, please contact Doug Huggett at (919) 733-2293, ext. 244. When appropriate, in-depth comments with supporting data is requested. REPLY y This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. This agency objects to e project for reasons described in the attached comments. SIGNED Q eft �,��_ DATE -4� -Z Z 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293\FAX: 919-733-1495\ Internet: http://dcm2.enr.state.nc,us An Equal Opportunity\Affirmative Action Employer—50%Recycled 110%Post Consumer Paper DIVISION OF COASTAL MANAGEMENT AD.IACENT RIPARIAN PROPERTY OWNFR NOTIFICATION/WAIVER FORM Name of Individual Applying For Perniit: Alck k')60. J Address of Property: �p a 5-0 (Lot or Street#, Street or Road) (City and Coun(y) I hereby certify that I own property adjacent to the above-referenced property. The individual applying for this permit has described to me as shown on the attached drawing the development they are proposing. A description or drawing, with dimensions, should be provided with this letter. I have no objections to this proposal. If you have objections to what is being proposed, please write the Division of Coastal Management, 127 Cardinal Drive Extension, Wilmington, NC 28405 or call 910--395-3900 within 10 days of receipt of this notice. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that a pier,dock,mooring pilings,breakwater,boat house or boat lift must be set bek a minimum distance of 15` from my area of riparian access-unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. Qz Sh,outn %c- I do not wish to waive the 15' setback requirement. b ci ,R Sign Name Date Print am - CS-A NCDENRc rr CARouw D -v_.Y or Fr+v�nwwcw*,wc N.mnK Rcapupac[a '.�N �� I Telephone Number witlT Area&de S:\cama\shells\riparianproperty.inn p� ION OF COASTAL. MANjGEN Palm4aMAY 7 2003 NCDENR MAST N of North Carolina Department of Environment and Natural ResourOA ER FdMKXWM Division of Coastal Management , Michael F.Easley,Governor Donna D. Moffitt, Director William G.Ross Jr.,Secretary May 7,2003 MEMORANDUM LAVED TO: Mr. John Sutherland, Chief AM II 0 8 2003 Water Planning Section t�IV°OFCA1RAI�l� Division of Water Resources FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA PERMIT APPLICATION REVIEW APPLICANT: MACK JOHNSON 1q--(D3 PROJECT LOCATION: 6252 INLT WATCH DRIVE AT THE THE LANDING, SOUTHPORT. PROPOSED PROJECT: ADD AN 8' BY 40' FLOATING DOCK TO THE WATERWARD END OF AN EXISTING PIER ON THE CAPE FEAR FIVER. Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 28, 2003. If you have any questions regarding the proposed project, please contact Doug Huggett at (919) 733-2293, ext. 244. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. This agency objects to the project for reasons described in the attached comments. SIGNED '-^— - DATE 7 s 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293\FAX: 919-733-1495\ Internet: http://dcm2.enr.state.nc.us An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper �0F W A TARO Michael F. Easley, Governor �O G William G. Ross, Jr., Secretary (Uny North Carolina Department of Environment and Natural Resources r _-� Alan W. Klimek, P.E., Director p Division of Water Quality Wilmington Regional Office November 7, 2002 c/� Mr. Mack Johnson ,+. ? RECEIVED 6252 Inlet Watch Drive Southport, NC 28461 NOV 1 3 2002 Subject: EXEMPTION ply OF COASTAL MANAGEMENT Stormwater Project No. SVV8.021035 RALEIGH Mack Johnson Floating Dock Addition Brunswick County Dear Mr. Johnson: The Wilmington Regional Office received a copy of the CAMA Major Permit Application for a Floating Dock Addition on October 23 2002. Staff review of the plans and specifications has determined that the development activities proposed at this time will not pose a threat to surface water quality from stormwater runoff. The Director has determined that projects that are reviewed and approved by the Division as not posing a water quality threat from stormwater runoff should not be subject to the stormwater management permitting requirements of 15A NCAC 2H.1000. By copy of this letter, we are informing you that your project will not require a stormwater management permit. If the subject project disturbs five acres or more and has a point source discharge of stormwater runoff, then it is also subject to the National Pollutant Discharge Elimination System (NPDES) stormwater discharge requirements. You are required to have an NPDES permit for stormwater discharge from projects meeting these criteria. The stormwater rules require the Division to permit the common plan of development, therefore, any future development on the property, regardless of whether a CAMA Major permit is also required, will require a Stormwater Management Permit application and permit issuance from the Division of Water Quality prior to any construction. If you have any questions or need additional information concerning this matter please contact Ms. Linda Lewis at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/arl: S:\WQS\STORMWAT\CAMA\021035.Nov cc: Janet Russell, DCM Delaney Aycock, Brunswick County Inspections Doug Huggett, DCM Wilmington Regional Office Central Files Now NCDENR N.C.Division of Water Quality 127 Cardinal Drive Extension Wilmington,N.C.28405 (910)395-3900 Fax(910)350-2004 Customer Service 800-623-7748 f0o de- SokrnSon �u�nscv�C.Y_ Cc,ut Development Type FFF DCM A DWQ% (14300 1601 435100033 1625 6253) (24300 1602 435100095 2341) I. Private,non-commercial development that does not involve the filling or excavation of any 5250 1DOSo(S250) wetlands or open water areas: 11. Public or commercial development that does not involve the filling or excavation of any wetlands or open $400 10D%(S400) 0%(SO) water areas: Ill. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas,determine if A,B,C.or D below applies III(A). For Private,non-commercial development,If General water Quality Certification No.3301(see attached) S250 100%(S250) D%(SO) can be applied: Ill(B): For public or commercial development,if General water Quality Certification No.3301(see attached) S400 100%(S400) 0%(SO) can be applied: III(C). If General Water Quality Certification No.3301(see attached) could be applied,but DCM staff determined that additional review and SOO 60%(S240) written DWQ concurence is needed 40%(S160) because of concerns related to water quality or aouafic life: IIIPD If Geneal Water Quality a Certification No.33D1(see attached) S400 605b(S240) can not be applied: 40;0(S160) IV. For deveiopmr ent that involves the filling and/or excelafion of more than one acre of wetlands and/or S475 60%(S2E5) 40%(S190) open water areas: GO +- .t�0 C e�� NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary February 26, 2003 FAX: 910-457-9427 2 Pages State Port Pilot Legal Advertisement Section Post Office Box 10548 Southport, North Carolina 28461 Re: Public Notice - Mack Johnson Dear Sir: Please publish the attached Notice in the Wednesday, March 5, 2003, issue. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Chris Pope, Division of Coastal Management, 1638 Mail Service Center, Raleigh, North Carolina 27699-1638. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Wilmington office. Sincerely, nwoj,%, Diana Nash Coastal Management Secretary Enclosure cc: Doug Huggett Chris Pope File Copy 127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845 Phone: 910-395-3900\Fax: 910-350-2004\Internet: http://dcm2.enr.state.nc.us An Equal Opportunity\Affirmative Action Employer-50%Recycled\10%Post Consumer Paper NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received on February 24, 2003. According to said application, Mack Johnson, 6252 Inlet Watch Drive, Southport, Brunswick County, NC proposes to add an 8' by 40' floating dock to the waterward end of an existing pier on the Cape Fear River. A copy of the entire application may be examined or copied at the office of Environment and Natural Resources, 127 Cardinal Drive Extension, Wilmington, North Carolina 28405, (910/395-3900) during normal business hours. Comments mailed to Donna D. Moffitt, Director, Division of Coastal Management, 1638 Mail Service Center, Raleigh, N. C., 27699-1638, prior to March 26, 2003, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. State of North Carolina Department of Environment 0 and Natural Resources Wilmington Regional Office Division of Coastal Management Michael F. Easley, Governor NCDENR William G. Ross Jr., Secretary NORTH CAROLINA DEPARTMENT OF Donna D. Moffitt, Director ENVIRONMENT AND NATURAL RESOURCES February 24, 2003 Mr. Mack Johnson 6252 Inlet Watch Drive Southport, NC 28461 Dear Mr. Johnson: The Division of Coastal Management hereby acknowledges receipt of your application for State approval for a floating dock addition located at 6252 Inlet Watch Drive, The Landing Subdivision in Southport, NC, Brunswick County. It was received as complete on February 19,2003 and appears to be adequate for processing at this time. The projected deadline for making a decision is May 4,2003. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above,you should consider the review period extended. Under those circumstances,this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along the entrance to the project where it can be observed from a public road. Some examples would be:Nailing the notice card to a telephone pole or stake along the road right-of-way fronting the property. Failure to post this notice could result in an incomplete application. A field report has been prepared and is in the process of being circulated to the various state and federal review agencies for their comments. If additional information is required based on this review,the agencies may contact you directly. Sincerely, Janet M. Russell Coastal Mgt. Representative Enclosure RECEVVEW FEB 2 8 2003 cc: Doug Huggett, DCM Jim Gregson, DCM DfVfsECOasTAL MANAGEMENT Wayne Strickland, LPO RALEIMA Henry Wicker, COE 127 Cardinal Drive Extension,Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer T it _ t SECTIONSENDER: COMPLETE THIS COMPLETE THIS SECTIONON DELIVERY Received by(Please Print Clearly) B. Date of Delivery ■ Complete items 1,2,and 3.Also complete A. item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse C. Signature so that we can return the card to you. ❑Agent ■ Attach this card to the back of the mailpiece, X ❑Addressee or on the front if space permits. D. Is delivery address different from item 1? ❑Yes 1. Article Addressed to: KC) If YES,enter delivery address below: ❑ No Mack J ohm s�� lg a S a fir,I e dun . e. Li 3. 2-Certified Type I-Certified Mail ❑ Express Mail ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑C.O.D. } 4. Restricted Delivery?(Extra Fee) ❑Yes 2. Article Number(Copy from service label) PS Form 3811,July 1999 is Return Receipt 102595-99-M-1789 _.., Domestic � •st- Service iECEIPT CoverageCERTIFIED Provided) (DomesticOnly; nce c0 Mac �ek,nsor, M r*t J m m Postage $ Cr • . -- Certified Fee Postmark Here i ------- ra Return Receipt Fee • fL fU (Endorsement Required) ATOR Ck • C] C3 Restricted a e, (EndorsemOt. . : Q Q T_ 0AC® AGEMENT LSE" �_ f 1-- V-0ENTER C3 Q Name I n I (to C]3 O Street,A r N ED City,State,ZIP+4 - � O O - ' RETURN TO FRANK W. ERWIN R-1119 I Excise Tax 582.00 Recording Time,Book and Page Tax Lot No. .......... .. ... .. .... .._. . . ....__.......-. Parcel Identifier No. Part of 2380000301...._.... Verified by .... ... . .... County on the __ day of . ,. ---- 1 19..... by ......................................................................................................................._..................................................................................... Mai f FRANK W. ERWIN, ATTORNEY after recording to .._...__ _. ....__.... __ ._. .._ ...__ PO BOX 7206f JACKSONVILLE,.;NC_2,8.540....... This instrument was prepared by .. ..FRANK W. ERWIN, ATTORNEY__.___ Brief description for the Index L T 146 PHASE THREE. THE LANDING AT SOUTHPORT I NORTH CAROLINA GENERAL WARRANTY DEED 2nd y AUGUST 19. 99., by and between THIS DEED made this. ............. day of ._ ...AUGUST_............ _.__.. IGRANTOR GRANTEE BLUEGREEN CAROLINA LAND, INC. MACK P. JOHNSON AND WIFE, SUSAN W. JOHNSON 1716 WHITE POND LANE IWAXHAW, NC 28173 Enter In appropriate block for each party: name,address,and, if appropriate, character of entity,e.q. corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, a I shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is here acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all tl certain lot or parcel of land situated in the City of _.SOUTHPORT SMITHVILLE p: y .___ _. Townsh IBRUNSWICK County,North Carolina and more particulal•ly described as follows: Being all of Lot 146 as shown on a plat entitled "The Landing, I Phase Three" recorded in Map Cabinet 21 Pages 16 thru 18, Brunswick County Registry. I Subject to restrictive and protective covenants as recorded in Book 1226, Page 0701 and amended in Book 1248, Page 839; Book 1267, Page 1236; Book 1293, Page 532, and Book 1301, Page 1203, Brunswick County Registry. kF i7 Z I r fi F t V { 1 N C 1h,A..nr 14mn M. 7 k 1'176.R,-,WA 11177 �...•..wne..��. �.. �,. a...ni.r+�,,...w.,n rnr.1. �,y The property hereinabove described was acquired by Grantor by instrument recorded in ............................................................ .................................................................................................................................................................................... A map showing the above described property is recorded in Plat Book ...... l.._.....__.__.... page.....16 thru 18 TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple,has the right to convey the same in fee simple, that title is marketable and-,free and clear of all encumbrances,and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions: IN WITNESS WHEREOF, the Grantor has hereunto set his hand and seal, or if corporate,has caused this Instrument to be,signed in Its corporate name by Its duly authorlsed officers and Its seal to be hereunto affixed by authority of Its Board of Directors, the day and year lust above written. BLUEGREEN CAROL I NA LAND, INC. ,aL9!!enr►./a� -------------------------------------------------------------(SEAL) ----------- -------------- (Corporate Name) ���GPROovitpon'/!}�9♦♦ VICE President I)1 u� t ------------- _ - SEAIQ ATTEST. � _ ___________________________----------------------------(S(SEAL) ✓v/ ---ASSISTANT_________secretary(Corporate seat) ♦♦♦1 F(AWA b�� _______(SEAL) g/////11119�b, SEAL-STAMP NORTH CAROLINA- ----------------------------------County. y I, a Notary Public of the County and State aforesaid, certify that __________________________________________ y ____________________________________________________________________________________________________Grantor, - u mpersonally appeared before me this day and acknowledged the execution of the fore[oing Instrument.Witness my 0 5 hand and official stamp or seal,this________ day of----------------------------------------- 19_____- Mycommission expires:______________________________ ________________________________________ Notary Public SEgL-STAMP NORTH CAROLINA- ------ONSLOW-----------------County. f.�N I,a Notary Public of the County and state aforesaid, certify that ____ANN_L,__GQSS----__ ---------- S c ASSISTANT y personally came before me this day and acknowledged that____he Is ___ ________ Secretary of BLUEGREEN CAROLINA LAND_r__INC.a North Carolina corporation,and that by authority duly liu ------------------------------------- • TAj M 1 given and as the act of the corporation, the foregoing Instrument was signed In Its name by Its VICE______ 0ty : N:: P L _________ at Ri HER ASS ST NT ,3LIC o President,sealed with Its corporate seal and attested d as Its________ ____ _____ Secretary. a" 2 nd AUGUST ---___-- I9 99 ____- . ,. K'Itoeec my hand and official stamp or meal,t ._ ..day of_.____ _ _ ____ 1.:1 11,16�2003 __ � duty ubllc +- a/Y commission expires:.___ _ ------- -----� ` -- -- v The foregoing Certificate(s) of ___________________________________________________________-________________________________________________.._ _____________________________________________________________________________--___________-_-____________________-__.__-_______-_____.________ , ______________________________________________________________________________________________________________________________________________ Is/are certified to be correct;This Instrument and this certificate are duly registered at the dale and time and In the Book and Page shown on the first page hereof. REGISTER OF DEEDS FOR------------------------------------COUNTY By ___________________________________________________________________Deputy/Assistant-Register of Deeds i