Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
157-03 Renewal 02/2007
3 w•:..a-rrhk tw-ra-;-:fa.��o-r, �-aaa-:w,a�.+a+.s-}a•ro-o»�ra r�x�v�o-tsy-.�aee-�s•r.-c-�r:o•}s-x-:•at-raax-r. Permit Class Permit Number RENEWAL 157-03, STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission x for X Major Development in an Area of Environmental pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113- 29 PI' Issued to John Head PO Box 1460,Buxton,NC 27920 Authorizing development in Dare County at Pamlico Sound, 501 Kgbor Drive 'Wit Ffi��, , as.requested in the permittee's letter dated 12/14/06 A Y }r Y C X This permit, issued on February 9, 2007 , is subject to compliance with the application (where consistent . with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit.to be null and void. 1) This renewal shall be attached to the original of Permit No. 157-03, which issued on 11/4/03, and copies of both documents shall be readily available on site when Division personnel inspect the project for compliance. { 2) Al l conditions and stipulations of the active permit remain in force under this renewal. r x i :C C } This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. f 4 This permit must be accessible on-site to Department } personnel when the project is inspected for compliance. �� Charles S. Jones, Director :t X Any maintenance work or project modification not covered Division of Coastal Manacrement hereunder requires further Division approval. . All work must cease when the permit expires on This permit and its conditions are hereby accepted. December 31, 2008 In issuing this permit, the State of North Carolina agTrees } that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee 4 �::-.-..v.•:ti:-1-is<_:i-'r:r-�tiv�:4:z�:z�}-YN•:Kv:-:.:ti<..�:_.::::::.:-i��...:..ti.....:.}:ti-:K-::iz-::�ti-::�titi._-::-::-'r:.:-::... ....�1:::ti<-:=:titi-ti 4�-:.:�:•_•_.'rti-:::•:-r::titi.�-:....:.ti......a.-.i..}.}.;.;-.,.4.,�.t NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary February 9, 2007 Mr. John Head P.O. Box 1460 Buxton,N.C. 27920 Dear Mr. Head: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. Please sign both the original (buff- colored form) and the Xerox stamped "Copy". Return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. Please retain the original (buff-colored form), as it must be available on site when the project is inspected for compliance. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A- 121.1 or 113-229. Your petition for a hearing must be tiled in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-269.8 within twenty (20) days of this decision on'your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it is to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site.To facilitate this review, we request that You complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in .accordanc.e with the permit, you will be helping to protect our vitally important coastal resources. S' cerely, . AV Douglas V. Haggett Major Permits and Consistency Manager Enclosure 400 Commerce Avenue, Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net An Equal opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper Permit# �5 G DCM Coordinator: IN MAHI NG DISTRIBUTION: D �oxPermitee: � -fit Agent: _ DCM Fi S: 'zabeth City orehead it as' ngton Wilmington US Army Co s incers(VSACE): astiington: .. . Mike Bell(NCDOT) Bill ecotm(NCDOT) aleigh Blan Wilmington: Dave Timpy Others: Cultural Resources: Renee Gledhill-Early Public Water Supply: Debra Benoy(W1RO) Fred Hill(WARD) Marine Fisheries: Mike Street NCDOT: Ken Pace Shellfish Sanitation: . Patty Fowler- State Property Office: Tom ("line a ua' Cyndi•Karoly(for non-DOT) John Hennessy Wildlife Resources: Maria Tripp Steve Everhart Travis Wilson(NCDOT) LPO: FAXING DISTRIBUTION: Permitee at Agent at DCM Field Offices: Elizabeth City(252-264-3723) Morehead City(252-247-3330) Washington(252-948-0478) Wilmington(910-350-2004) US Army Corps of Engineers(USACE): _ Washington: Mike Bell(NCDOT) Bill Biddlecome(NCDOT) Raleigh Bland(252-975-1399) Wilmington: Dave Timpy(910-251-4025) CAMA Major Permit Process Manual Page 70 of 76 DEC 18 2006 COAST/il R,."ANAGFMEIVr %8E7 ciTy December 14, 2006 John Cecee NC Division of Coastal Management 1367 US Hwy 17 South Elizabeth City,NC 27909 RE:Permit#157-03 Dear John: I hope this letter finds you well. As per our discussion on December 13, 2006, I am requesting an extension the above referenced permit. The reason I have not completely proceeded with the project is lack of adequate finances. Hopefully I will be able to complete this project in the summer of 2007. In reference to the question on the form you showed me: 1.) I still own the property; 2.) I will make every effort to meet all local, state, or federal rules in regards to the bulkhead installation;and 3.) I will contact CAMA 30 days prior to construction. I hope this information is sufficient. If not,please don't hesitate to contact me. Sincerely, John F. Head Jr. o C� l PO BOX 549 • FRISCO, NC 27936 OFFICE: 252-995-3807, EXT. 101 • H02\IE: 252-995-3338 FAX: 252-995-6512 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director Wi is oss 99(-91VED MEMORANDUM JAN 12 2007 TO: Doug Huggett, Major Permits Coordinator forehead City DCM THROUGH: Frank Jennings, District Manager,NE District (�� o (itrfit�ti FROM: John Cece, Field Representative,NE District ' DATE: January 8, 2006 SUBJECT: Renewal of CAMA Major Permit#157-03. REFERENCE: (a) Letter from Mr. John Head (dated December 14, 2006) requesting an Extension of Major Permit#157-03 (b) 15A NCAC 07J.0404, Development Period Extension The applicant was issued CAMA Major Permit#157-03 on November 4, 2003 to remove an old pier and construct a bulkhead water ward of a small Coastal Wetland fringe on a canal in the Brigands Bay subdivision in Frisco, Dare County. The applicant submitted a letter dated December 14, 2006 (see attached) requesting a renewal of this permit, and subsequently submitted a check for the $100 renewal fee (check number 3462, dated January 4, 2007). I have reviewed the original permit application and conducted a site visit and determined that the applicant has removed the old pier but has not constructed the proposed bulkhead. The applicant meets the conditions outlined in reference (b),therefore I recommended that Major Permit#157-03 be extended for two years,provided all previous permit conditions remain in effect. Thank you for your time and effort. Enclosures: Applicant letter dated November 9, 2006 Check number 3462, dated January 4, 2007 1367 U.S. 17 South, Elizabeth City,North Carolina 27909 Phone: 252-264-39011 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—30%Recycled by Fiber Weight �V' '��� ��,;� ���') _. <<' ; • �' lit}. Ecos stemL 21'.L, PROGRAM RECEIPT �c �i� ��c�� c' D« �y March 28,2005 DWQ#: 05-0261 COE#: 200510613 John Head l P.O.Box 549 Frisco,NC 27936 Project: John Head Property(PIN#051617125301) County: Dare The North Carolina Ecosystem Enhancement Program(NC EEP) has received a check in the amount of $3,069.00, check number 2798, as payment for the compensatory mitigation requirements of the 401 Water Quality Certification/Section 404 permit issued for the above referenced project. This receipt serves as notification that the compensatory mitigation requirements for this project have been satisfied. Please note that you must also comply with all other conditions of this certification and any other state,federal or local government permits or authorization associated with this activity. The NC EEP, by acceptance of this payment, acknowledges that the NC EEP is responsible for the compensatory mitigation requirements associated with the project permit and agrees to provide the compensatory mitigation as specified in the permit. The NC EEP will mitigate for 0.14 acres of non-riparian wetlands in Cataloging Unit 03020105 of the Tar-Pamlico River Basin. Payments to the Ecosystem Enhancement Program are not reimbursable unless a request for reimbursement is received within 12 months of the date of this receipt. A letter must accompany requests for reimbursement from the permitting agency stating that the permit and/or authorization has been rescinded. If you have any questions or need additional information, please contact Carol Shaw at 919-733-5205. Sincerely, i Gilmore,liam D. 'l more, PE Director cc: Cyndi Karoly, Wetlands/401 Unit Doug Huggett,Division of Coastal Management Tracey Wheeler, USACOE-Washington Kyle Barnes,DWQ Regional Office-Washington, File JZ"tDY .. E .. YDtEGt Oar State, ©N �• P O St � IF�CDENR North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652/919-715-0476!www.nceep.net Permit class Permit Number NEW STATE STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Jet-r m tr t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to John Head PO Box 1460 Buxton NC 27920 Authorizing development in Dare County at Pamlico Sound 50148 Snug Harbor Drive, Frisco , as requested in the permittee's application dated 7/22/03, including attached workplan drawing (1) dated 5/8/03 This permit, issued on Novemher 4, 2003 , is subject to compliance with the application(where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines,imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization 1) The alignment of the permitted bulkhead must be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of any construction. Failure to initiate construction within 30 days, or significant erosion of the shoreline by adverse weather conditions, will require the alignment to be restaked by DCM within a maximum of 30 days prior to the new expected start of construction. 2) The bulkhead will not extend waterward more than 5 feet from the mean high water level at any point along its alignment at the time of construction. 3) The bulkhead must be constructed prior to any backfilling activities. , (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. �ID'o`nna D. Moffitt,Director Any maintenance work or project modification not covered — Division of Coastal Management hereunder requires further Division approval. All work must cease when the permit expires on This permit and its conditions are hereby accepted. December 31, 2006 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal f. 4 Management Program. Signature of Permittee �:-Y:-:-::��-?.ti tiv:i-:-:-kti-hti'i-:�:'r?:-:-::�Y:-'r'ry-:�:-�:�yi•::-:-'r:-:-�•}};-}i•i-:-��.i+ti-r-::-.+,•;=•:•:-::�'r s��:sri•h•:'rC•;•:•.�•7%-J•;•!..:}�}}}ti-:.:,?�7-:ti'-1h tiff tii:-�:}:ti-:�+•Y:-ti:?-:-Y.�titii-P:iti{..ir:i-:r�!r�//.!vr.:�i•?•