Loading...
HomeMy WebLinkAbout49-03 Renewal 12/2006 a}o-x+ti.K-wrc-w•ci�c<-:o-}xo,.tiv-. .-ao-xa.u.�x-x�rr,-:t.mxo-rx�}.•ti-}}}xo-»xc��}xrr�}o-x�wrro-}x�wc Permit Class Permit Number RENEWAL 49-03 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission for X Major Development in an Area of Environ al Cgffrn 8 2006 pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGMurdhead City.DCM Issued to Lacy M. Henry, PO Box 966, Atlantic Beach,NC 28512 Authorizing development in Pamlico County at adj. Raccoon Creek, intersection of Avenue A and South Avenue, Oriental , as requested in the perinittee's letter dated 6/30/06. This permit, issued on December 8,2006 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may , be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) This-renewal shall be attached to the original of Permit No. 49-03, which was issued on 4/14/03, and copies of both documents shall be readily available on site when Division personnel inspect the project for compliance. x 2) All conditions and stipulations of the active permit remain in force under this renewal. r t 7y` V Y 7' A� .t :S .t This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. v Department k =' This permit must be accessible on-site to De .$ P P Y personnel when the project is inspected for compliance. Charles S. Jones, Director Any maintenance work or project modification not covered Division of Coastal Management hereunder requires further Division approval. Y Y All work must cease when the permit expires on This permit and its conditions are hereby accepted. December 31, 2008 In issuing this permit, the State of North Carolina agrees 7 that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee� �ti[:ti-}:4}:?:+r}:-i=rr}x-iM}TFC-W}}x-}\}..-.:-..r:-}::�xa�:-:vi-}:i:�:4}:�}}}:...::�:.Yv4tititi-:-}x.}}:i-T:-::ti:4-x-.rrr.-}:-x-'r\4ti-?4}:ti'r`-?ti:-}:4}}i-i-.:...r....:Y}]-};•x.}::.}:<..i-:.}}1-}i.}:}'r}}}'r}:�[-:Xti NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F.Easley,Governor Charles S. Jones, Director William G.Ross Jr.,Secretary December 11, 2006 Lacy M: Henry P.O. Box 966 Atlantic Beach,NC 28512 Dear Mr. Henry: T'he ellolosed peniait collgt'itu—L6s authoTlzation undei the Coastal Area Mallabeilleat Act, mid wheic applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. Please sign both the original (buff- colored form) and the Xerox stamped "Copy". Return the copy to this office in the enclosed envelope. Signing the permit and.proceeding means you have waived your right of appeal described below. Please retain the original (buff-colored form), as it must be available on site when the project is inspected for compliance. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A- 121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings; 6714 Mail Service Center; Raleigh; NC 37611-6714; (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty(20)days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the pen-nit form. Otherwise, all work must be calTied out In accordallco With your application. Modifications, thile exteilsions, acid future inaintenanoo require additional approval. Please read your permit carefully.prior to starting work' and review all project plans, as approved. If you are having the work done by a contractor, it is to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Sincerely, tc d a t. I ett NN b gg Major Permits and Consistency Manager Enclosure 400 Commerce Avenue, Morehead City, NC 28557 Phone: 252-808-28081 FAX 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer-50%Recycled 110%Post Consumer Paper Permit# ' D3 DCM Coordinator: I MAH� NG99 `DISTRIBUTION: /// 1 Q Permitee. M I Agent: _ DCM Field Offices: f Elizabeth City orehead i Was n on, Wilmington US Army Corps of Engineers(USACE): .ashington: Mike Bell (NCDOT) ' Bil�Bildleqomq(N�C'T) ReIg a Wilmington: Dave Timpy Others: Cultural Resources: Renee Gledhill-Early Public Water Supply: Debra Benoy(WIRO) Fred Hill(WARD) Marine Fisheries: Mike Street NCDOT: Ken Pace Shellfish Sanitation: . Patty Fowler State Property Office: Tommy Cline Water Quality: Cyndi Karoly(for non-DOT o n ennessy Wildlife Resources: Maria Tripp Steve Everhart Travis Wilson(NCDOT) LPO: FAXING DISTRIBUTION: Permitee at Agent at DCM Field Offices: Elizabeth City(252-264-3723) Morehead City(252-247-3330) Washington(252-948-0478) Wilmington(910-350-2004) US Army Corps of Engineers(USACE): Washington: Mike Bell(NCDOT) Bill Biddlecome(NCDOT) Raleigh Bland(252-975-1399) Wilmington: Dave Timpy(910-2514025) CA-MA Major Permit Process Manual Page 70 of 76 0 NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H, Sullins Dee Freeman Governor Director Secretary February 26,2009 CERTIFIED MAIL 70081300 0001 0434 4807 Ms. Lacy M.Henry MAR 3 2009 P.O.Box 966 Atlantic Beach,NC 28512 Morehead City Subject. 401 Water Quality Certification Inspection Lacy Henry Property DWQ Project#2003-0111 Raccoon Creek [SC,HQW,NSW] Dear Ms. Henry: On February 19, 2009 Amy Adams and Anthony Searbraugh of the Division of Water Quality (DWQ)inspected a proposed boat basin and docking facility located on the southwest intersection of South Avenue and A Avenue in Oriental,Pamlico County. This project was inspected for compliance with the General Water Quality Certification(GC)#3351 and Authorization Certificate per the Neuse River Buffer Rules(15A NCAC 2B .0233)with Additional Conditions granted on April 1,2003 for the bulkhead and 8-slip docking facility at the subject property. The GC and Buffer Authorization approved the dredging of 0.57 acres of waters,fill of.0.007 acres of waters, and clear and grade of approximately 8,000 ft2 of protected riparian buffer to complete your project as described in your August 2,2002 application. The inspection revealed that the project has not yet been completed. As such,you will be rescheduled for an inspection at a later date. This office would like to remind you that general certification and buffer authorization will expire when the 404 permit expires unless otherwise specified. Any future impacts are limited to the impacts proposed in your application and you must comply with all additional conditions regarding deed notifications(restrictive covenants), erosion and sediment control practices,protective fencing, diffuse flow requirements, and culvert placement and installation. North Carolina Division of Water Quality Internet: www.ncwaterauality.org 943 Washington Square Mall Phone: 252-946-6481 One Washington,NC 27889 FAX 252-946-9215 NorthQuohna An Equal Opportunity/Affirmative Action Employer—50%Recycled/109%Post Consumer Paper Naturally At. •' NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley,Governor Charles S. Jones, Director William G. Ross Jr.,Secretary MEMORANDUM: j TO: DOUG HUGGETT ► '"�� �/ Cl/tI®6 THRU: TERE BARRETT FROM: STEPHEN LANE," SUBJECT: RENEWAL REQUEST—CAMA MAJOR PERMIT#49-03, LACY HENRY, PAMLICO COUNTY DATE: September 22, 2006 Please find enclosed a request from Mr. Lacy Henry to.renew State Permit#49-03. This permit was originally issued to Mr. Henry on 4/14/03 to construct an 8-slip docking facility, install 147 linear feet of bulkhead, and conduct excavation within and adjacent to Raccoon Creek. No work has been undertaken to date. The permit expires on December 31, 2006. By virtue of Section 15A NCAC 07J .0404, the permittee is allowed a two year extension on this permit. A check for$100.00 is attached. I recommend the permit be renewed as requested. 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808\FAX: 252-247-3330\Internet: www.nccoastalmanagement.net An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper i Permit Class Pennit Number . NEW 49-03 STATE OF NORTH CAROLINA Department of Environment and Natural Resource and Coastal Resources Commission ?9Q . city bom for X Major Development in an,Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 I 'Issued to Lacy M.Henry,PO Box 966,Atlantic Beach,NC 28512 Authorizing development in Pamlico County at adi.Raccoon Creek,intersection of Avenue . Aand South Avenue. Oriental , as requested in the pennittee's application dated 7/31/02. including ::attached.the worknlan drawings (11). Sheets 1 - 11 of 11 all dated revised 10/2/02 This permit, issued on_ April 14,2003 ,is subject to compliance with the application(where consistent With the permit),all applicable regulations,'special conditions and notes set forth below. Any violation of these terms may � subject to fines,imprisonment or civil action;or may cause the permit to be null and void. i ' Excavation I i Due to the potential for the suspension of;toxins present in the sediment of Raccoon Creek due to the dredging activities, A turbidity curtain shall be installed around the area to be excavated and shall remain in place for a 24 hour period after completion of excavation to prevent the introduction of toxic sediments into the adjacent water body. I Excavation will not exceed-6 feet below the normal water level. In no case shall the depth of excavation w. exceed the depth of connecting waters. `3} The permittee agrees to comply with the conditions identified in the attached supplement prepared by the United States Fish and Wildlife Service titled "Precautions for General Construction in Areas which may be used by the West Indian Manatee in North Carolina",revised June 2002. (See attached sheets for Additional Conditions) i i II'' :.:Th4 permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the :otHer'qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date: An appeal requires resolution prior to work initiation or niiance as the case maybe. 'I1iis permit must be accessible on-site to Department ;_.Y6:rsonnel when the project is inspected for compliance. 96-Any,maintenance work or project modification not covered nna D. Moffitt, Director ;. hereunder requires further Division approval. Division of Coastal Management All work must cease when the permit expires on This permit and its conditions are hereby accepted. i December 31,2006 In,'issuing this permit, the State of North Carolina agrees 'at your your project is consistent with the North Carolina Coastal i a!vlanagement Program. Signature of Permittee 1 ' Lacy M.Henry Permit#49=03 Page 2 of 5 ADDITIONAL CONDI No vegetated wetlands will be excavated or filled. JUL 0 3 2006 i ,5) The temporary placement or double handling of fill mateh%Mfl ' t or, a et;,a�ted wetlands is not ucluauthorized. rYY :•10OTE: The permittee's contractor is advised to contact the U.S. Coast Guard at (910) 815-4895,ext. 108 to discuss operations and appropriate lighting, markers,etc. for all dredge equipment. Spoil Disposal :.;f) The spoil disposal area must be inspected and approved by a representative of the Division of Coastal Management prior to the commencement of any dredging activities. '1) All excavated materials will be confined above normal water level and landward of regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of solids into any marsh or surrounding waters. 8) The disposal area will be constructed a sufficient distance from the normal water level or any marsh to eliminate the possibility of dike erosion into surrounding wetlands or waters.' .The disposal area will be properly graded and provided a ground cover sufficient to restrain erosion -within 30 working days of project completion. "_.4.DTk: The permittee is advised that this permit does not authorize the placement of spoil material within 50 feet of the normal water line except for that which will be used to I ackfill the permitted bulkhead. Any development or land disturbing activity that is considered non-water Y dependent is not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission (EMC) Neuse River buffer regulations in place at l the time of such development. The permittee is advised to contact the NC Division of Water -6481, Quality to determine compliance with the Neuse River Basin Buffer Rules at (252) 946 ;;. Shoreline Stabilization f d) The alignment of the authorized•bulkhead must be staked by a representative of•the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather:.conditions, will require the alignment to be restaked by DCM within a maximum of 30 days prior to the new expected start of construction. . The bulkhead must be constructed prior to any backfilling activities. 1 ). The bulkhead must be structurally. tight so as to prevent seepage of backfill materials through the I structure. 1 The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. 1 r Lacy M. Henry Permit#49-03 J U L 012006 Page 3 of 5 ADDITIONAL COl �I� �� LD c fv, 1.4) The backfill material will be clean and free of any pollutants except in trace quantities. `S) The dredge material to be used as backfill for the permitted bulkhead shall be properly dewatered prior to backfilling activities. f) Except for that material obtained by dredging acceptable for use as backfill material, all other backfill material will be obtained from a high ground source and all backfill material will be confined behind the permitted bulkhead. Commercial Docking Facility The Town of Oriental Land Use Plan 1994 Update requires pumpout facilities or public toilet facilities I for all docks in the Town Harbor (Raccoon Creek) that provide business services to any recreational or work boat. Therefore, prior to the occupancy of any new slips authorized under this permit, a marine pumpout sewage disposal facility or a high ground public toilet facility.will be installed and operable, and maintained for the life of the commercial docking facility. N Should the permittee wish to pursue the construction of a publicly accessible toilet facility at the I F site in lieu of the required pumpout facility, please contact a representative of the Division of > Coastal Management for a determination of any permit requirements. }1'$)`: ' In accordance with commitments made by the permittee, a locked head policy shall be implemented and enforced. This permit authorizes only the docks, finger piers, and mooring pilings located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, may become a permanent part of this commercial docking facility without permit edification. No non-water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 0) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the commercial docking facility. Any sewage discharge at the commercial docking facility shall be 'considered a violation of this permit for which the permittee is responsible. This prohibition shall be j applied and enforced throughout the entire existence of the permitted structure. j I 24) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor. 22) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. Use of the permitted activity must not interfere with the public's right to free navigation on all navigable waters of the United States. .''23).. The authorized structure and associated activity must not cause an unacceptable interference with navigation. j I h .''Lac 'M.Henry :.�� � Permit#49-03 ;. Page 4 of.5 ADDITIONAL CON .ITIO S A edb � o t� o e��ederal project, and the ' ....24) This permit does not authorize the interference witA"a � � � p p � , permittee will not be entitled to compensation for damage to the authorized.structure or work, or injury Which may be caused from existing or future operations undertaken by the United States in the public interest. 5). The docking facility will be designed to accommodate no more than 8 vessels. At no time shall more than 8 vessels be moored or docked at the facility. The restriction of the number of vessels shall apply to all marine vessel types, including but not limited to motorboats, sailing vessels and personal i watercraft. .The permittee must install and maintain at his expense any signal lights or signals prescribed by the U.S: I -.Coast Guard,through regulation or otherwise, on the authorized facilities. The permittee will maintain the authorized work in good condition and in conformance with the terms and. conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. Sedimentation and Erosion Control ` Prior to construction of any new boat slips or other docking facilities under this permit, the permittee t must apply for and receive an Easement from the Department of Administration's State Property Office as required under N.C.G.S. 146' 12(e). Sedimentation and Erosion Control j - I 'M: An Erosion and Sedimentation Control Plan may be required for this project. The permittee is advised to contact the Department of Environment and Natural Resources,Land Quality Section, 943 Washington Square Mall,Washington,NC 27889, (252)946-6481 for this determination. i : 9) In order to protect water quality, runoff from construction must not visibly increase the amount of suspended sediments in adjacent waters. . I Appropriate sedimentation and erosion control devices, measures or structures must be implemented to "} ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, -diversion swales or berms, sand fence, etc.). 31) All disturbed areas shall be properly graded and provided a ground cover sufficient to restr.dn erosion within thirty days of project completion. I ;< General 32)" If a court of competent jurisdiction determines that a party other than the permittee has legal title to any part of the area approved for development under this permit, this permit shall be null and void as to the area the court determines is not owned by the permittee. This condition shall take effect on the date such-court judgment becomes final. In such event, the permittee shall consult DCM prior to initiating or continuing any further development under this permit. ., f Lacy.M. Henry Permit#49-03 Page 5 of 5 nn � ? QQ ADDITIONAL CO 6ITION9 i 'NOTE: This permit does not convey any r'ighw ph'ar4 ritwqy i state or material. 33) ' The permitted activity will be conducted in such a manner as to prevent a significant increase in turbidity outside of the area of construction or construction-related discharge. Increases such that the turbidity in the waterbody is 25 NTU's or less in all saltwater classes are not considered significant. i 34) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required;upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. TE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. `OTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. MOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water � Quality Certification No. 3301 (DWQ Project No. 030111). NOTE: The U.S. Army Corps of Engineers has 'assigned the proposed project COE Action Id. No. 200310338. j I i