HomeMy WebLinkAbout175-03 Vereen, Holloway & Martin (A.O.Hardee) Q
a
Permit Class Permit Number
NEW 175-03
STATE OF NORTH CAROLINA
Department,of Environment and Natural Resources
and
Coastal Resources Commission
MAY 0 5 2004
SHAG for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Regina Vereen,Sherri Holloway&Sonya Martin,c/o A.O.Hardee,55 Park Street Ext.,Little River,SC 29566
Authorizing development in Brunswick County at adj. manmade canal, Lots 188-190, end of
Marlin Dr. Holden Beach , as requested in the permittee's application dated 6/16/03, including
attached workplan drawings (2), Sheets 1 &2 of 9 both dated 6/16/03.
This permit, issued on November 24, 2003 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth_below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Shoreline Stabilization
1) The bulkhead shall be aligned landward of all coastal wetlands on the south end of the properties, and
shall continue in a straight line to the proposed return wall on Lot 190.
2) The alignment of the permitted bulkhead must be staked by.a representative of the Division of Coastal
Management within a maximum of 30 days prior to the start of any construction. Failure to initiate
construction within 30 days, or erosion of the shoreline by adverse weather conditions, will require the
alignment to be restaked by DCM within a maximum of 30 days prior to the new expected start of
construction.
(See attached, sheets for Additional Conditions)
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance. /r
.
Any maintenance work or project modification not covered onna D. Moffitt, Director
hereunder requires further Division approval. Division of Coastal Management
All work must cease when the permit expires on This permit and its conditions are hereby accepted.
December 31,_2006
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program. ` Signature of Permittee
Regina Vereen, Sherri Holloway & Sonya Martin Permit#175-03
Page 3 of 3
ADDITIONAL CONDITIONS
16) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence,
diversion swales or berms, sand fence, etc.).
17) A11 disturbed areas shall be properly graded and provided a ground cover sufficient to restrain.erosion
within thirty days of project completion.
General
18) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary.of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions
caused thereby, without expense to the United States or the state of North Carolina. No claim shall be .
made against the United States or the state of North Carolina on account of any such removal or
alteration.
NOTE:- This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required..
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 395-3900 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under Nationwide Permit
No. 18 and General Permit No. 197800080 (COE Action Id. No. 200301191) which were issued
on 11/24/03.
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: A. O. Hardee
2. LOCATION OF PROJECT SITE: Lots 188, 189 & 190 at the end of Marlin Dr., Holden Beach,
Brunswick Co. NC.
Photo Index - 2000: 4-37: Q-21 1995: 4-35: P,Q-7 1989: 185-3: G-12
State Plane Coordinates - X: 2201534 Y: 59501 Rover file# - S 081418A
3. INVESTIGATION TYPE: CAMA/D&F
4. INVESTIGATIVE PROCEDURE: Date of Site Visit - 8/14/03
Was Applicant Present - No
5. PROCESSING PROCEDURE: Application Received - cc: 7/1/03
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Holden Beach
Land Classification From LUP - Developed
(B) AEC(s) Involved: PT, EW, ES, CW
(C) Water Dependent: Yes
(D) Intended Use: Private
(E) Wastewater Treatment: Existing - None
Planned - Municipal sewer available
(F) Type of Structures: Existing - None
Planned - Bulkhead(future residential development)
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
S artina alterniflora 340 sqft.
(B) Non-Vegetated Wetlands 1,500 sqft.
(C) Other - Highground disturbance 15,000 sqft.
(D) Total Area Disturbed: 16,840 sq. ft.
(E) Primary Nursery Area: No
(F) Water Classification: SA Open: No
8. PROJECT SUMMARY: The applicant proposes to construct a bulkhead (1901.f.) along the shoreline
of three(3) undeveloped lots, adjacent to a man-made canal, at the end of Marlin Dr., in Holden
Beach. The proposed bulkhead alignment would incorporate 340 sqft. of coastal wetlands and
approximately 1500 sqft. of intertidal area and shallow bottom.
i
A. O. Hardee
Page 2
9. PROJECT DESCRIPTION
The project site consists of three (3) undeveloped lots (Lots 188, 189, 190), adjacent to a man-made canal, at
the northeast end of Marlin Dr., in Holden Beach, in Brunswick County. The applicant is applying for this
permit on behalf of his three (3) daughters, who are the legal owners of the properties. The lots are 50 feet
wide and approximately 93 feet in depth from Marlin Drive. The lots are bordered by Canal No. 3 on the east
side, which is part of a 5 canal system joined together on the northern end by a cross canal, and connected to
the Atlantic Intracoastal Waterway (AIWW) via an entrance channel. The project site is located at the
intersection of the canal, the cross canal and the entrance channel connection. The applicant's lots are
currently undeveloped and the properties are overgrown with weeds and vines. There are a couple of Live
Oaks and Pines on the property, but numerous large Red Cedars dominate the trees existing onsite. There is
a vertical escarpment, 5 to 7 feet high, along the shoreline (east side) of the property. The normal high water
line is located at the base of this escarpment. The erosion is more severe on Lot 190, probably due to the
proximity to the confluence of the three canals. There is a narrow border of coastal wetlands adjacent to the
shoreline of Lot 188 and a portion of Lot 189. The marsh border consists of Smooth Cord Grass S artina
alterniflora) and it is approximately 70 feet long and 10-12 feet wide from the base of the escarpment. The
area adjacent to shoreline of the remainder of Lots 189 and 190, exists as unvegetated, intertidal bottom. The
shoreline of the adjacent lot to the south is stabilized by an existing bulkhead.
The waters adjacent to the project site are classified as SA, by the NC Division of Water Quality. They are
closed to the harvest of shellfish. The waters are not a designated primary nursery area (PNA), by the NC
Division of Marine Fisheries.
The applicants propose to reestablish the previous dimensions of the properties by constructing a bulkhead
along the shoreline of the three (3) lots. The new bulkhead,would be 150 feet long and constructed along an
alignment established by extending the alignment of the existing bulkhead from the adjacent lot to the south of
the project. The proposed bulkhead would vary from 4 to 24 feet waterward of the toe of the existing erosion
escarpment. A wing wall, 40 feet in length, would be constructed on the northern property line of Lot 190, to
return the bulkhead to the highground The proposed alignment would run through the middle of the adjacent
border of coastal wetland vegetation at the southeastern corner of the project. The applicants also propose to
clear, grade and fill the remaining area of the lots, in conjunction with the bulkhead construction project, to
prepare them for future residential development.
10. ANTICIPATED IMPACTS
The proposed project would incorporate approximately 340 square feet of coastal wetlands. The remaining
marsh (approx. 400 sgft.) would likely also be lost during the bulkhead construction process. The proposed
project would incorporate approximately 1,500 square feet of unvegetated intertidal bottoms. The applicant
anticipates the project requiring approximately 30 cubic yards of backfill material to be placed below mean
high water. All of the highground property (15,000 sqft.) would be disturbed during the project. Additional
highground soil disturbance and creation of impervious surface area would occur with the subsequent
construction of residential structures.
Submitted by: E. F. Brooks Date: August 19, 2003 Office: Wilmington
Recommendations for State Permit - A. O. Hardee
The applicant has not shown the need to incorporate the coastal wetland border. The lots can be developed
without the loss of the wetlands by aligning the bulkhead on the landward edge of the marsh. Any permit
issued should contain the following conditions:
1) Subsequent residential development must obtain CAMA Minor Permits from the Holden Beach Minor
Permit Program. Contact Rhonda Phillips, Local Permit Officer at (910) 842-6080.
2) That the bulkhead alignment be staked along the proposed bulkhead alignment by a representative of
the Division of Coastal Management (DCM) within a maximum of thirty (30) days prior to the start of
construction. Failure to initiate construction within thirty (30) days, or erosion of the shoreline by
adverse weather conditions, will require the alignment to be re-staked by DCM within a maximum of
thirty (30) days prior to the new expected start of construction.
3) The bulkhead must be constructed prior to any backfilling activities.
4) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the
structure.
5) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles, or
other suitable materials approved by the Department personnel. No excavation is permitted except for
that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc.
This permit does not authorize any excavation waterward of the approved alignment.
6) All backfill material will be clean and free of any pollutants, except in trace quantities. Metal
products, organic materials, or unsightly debris will not be used.
7) All backfill material will be obtained from a highground source and confined behind the permitted
bulkhead.
AUG 21:,'2003
ONaOFM .
Form DCM-MP-1
APA- P- LICATIO
N.
(To be completed by all applicants)
W3
1. APPLICANT c. Street address or secood4i6id-,Li b6- il
Lots 188, 189, 190 Marlin Drive
a. Landowner: See attached list
b,Authorized Agent: Father d. Is proposed work within city limits or
Name A.O. Hardee phaming jurisdiction? x Yes
No(Town of Holden Beach)
Address 55 Park Street Extension
e. Name of body of water nearest project (e.g.
City Little River river,creek,sound,bay)
State South Carolina Intracoastal Waterway
Zip 29566
Day Phone 843-249-1264 3. DESCRIPTION AND PLANNED USE
Fax 843-249-1503 OF PROPOSED PROJECT
c. Project name(if any) N/A a. List all development activities you propose(e.g.
building a home,motel,marina,bulkhead,pier,
And excavation and/or filling activities.
Construction of a bulkhead and backfill for
shoreline stabilization on existing canal lots
b. Is the proposed activity maintenance of an
existing project,new work,or both?
2. LOCATION OF PROPOSED New
PROJECT c. Will the project be for public, private or
commercial use?
Private
a. County Brunswick
b. Town Holden Beach
d. Give a brief description of purpose,use,
methods of construction and daily operations of
proposed project. If more space is needed,please
Form DCM-MP-1 attach additional pages.
See attached Narrative
Revised 03/95
j. Has a professional archaeological assessment
been done for the tract? Yes x No
If yes,by whom? N/A
4. LAND AND WATER k. Is the project located in a National Registered
CHARACTERISTICS Historic District or does it involve a National
Register listed or eligible property?
a. Size of entire tract 3 lots total.344 acres Yes x No
b. Size of individual lot(s) —5000 square feet 1. Are there wetlands on the site? x Yes No
Coastal(marsh) x Other
If yes,has a delineation been conducted?..No,_ _
c. Approximate elevation of tract above MHW or Coastal wetlands onl T,MHNV=kN41and�lihe' IN
NWL 7-12'mhw (Attach documentation, available)
j `
I I^t {,t o hF
d. Soil type(s)and texture(s)of tract
Newhan fine sand D I V 1,G I )i,l OF
in.Describe existing wastewater treattiient facilities`:
e. Vegetation on tract None at present
Cedar,grapevine,wax myrtle,smooth
cordgrass,sea oxeye,4upon,black cherry,kudzu
f. Man-made features now on tract N/A n. Describe location and type of discharges to
waters of the state. (For example,surface runoff,
g. What is the CAMA Land Use Plan land Sanitary wastewater, industrial/commercial
classification of the site?(consult the local land use plan.) effluent,"wash down"and residential discharges.)
Limited surface runoff,no impervious areas exist
Conservation Transitional
Developed Community o. Describe existing drinking water supply source.
Rural x Other Public water system
Municiple
h. How is the tract zoned by local government?
R-1
5. ADDITIONAL INFORMATION
I. Is the proposed project consistent with the
applicable zoning? X Yes No
(Attach zoning compliance certificate,if applicable)
In addition to the completed application form,the
following items must be submitted: * An accurate, dated work plat (including plan
* A copy of the deed(with state application only) view and cross-sectional drawings)drawn to scale
or other instrument under which the applicant in black ink on an 81/2'by I I"white paper. (Refer
claims title to the affected properties. If the to Coastal Resources Commission Rule 710203 for
applicant is not claiming to be the owner of said a detailed description.)
property,then forward a copy of the deed or other
instrument under which the owner claims title, Please note that original drawings are preferred and
plus written permission from the owner to carry only high quality copies will be accepted. Blue-line
out the project. prints or other larger plats are acceptable only if an
Revised 03/95
adequate number of quality copies are provided by
applicant. (Contact the U.S. Army Corps of A check for $400 made payable to the
Engineers regarding that agency's use of larger Department of Environment, Health, and Natural
drawings.) A site or location map is a part of plat Resources (DEHNR) to cover the costs of
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to processing the application.
Form DCM-MP-1 * A signed AEC hazard notice for projects in
oceanfront and inlet areas.
the site. Include highway or secondary road(SR)
numbers,landmarks,and the like. * A statement of compliance with the N.C.
Environmental Policy Act(N.C.G.S.113A-1 to
*A Stormwater Certification,if one is necessary. 10) If the project involves the expenditure of public
*A list of the names and complete addresses of funds or use of public lands, a attach st em' I ^
the adjacent waterfront (riparian) landowners documenting compliance with the North'i.Ca�olin it
and signed return receipts as proof that such Environmental Policy Act.owners
f the application
and plats byve rcertifi d mail.eceived a copy oSuch landowners €: ',n;: 5
must be advised that they have 30 days in which to
submit comments on the proposed project to the ;v� J'
Division of Coastal Management. Upon signing 6. CERTIFICATION AND PERMISSIrON i`{'
this form, the applicant further certifies that such TO ENTER ON LAND
notice has been provided.
Name William Smith I understand that any permit issued in response to
Address 1007 S.Edisto Drive this application will allow only the development
Florence,S.C. 29501 described in the application. The project will be
subject to conditions and restrictions contained in
Name Richard Chopus the permit.
Address 150 Marlin Drive I certify that to the best of my knowledge, the
Holden Beach,N.C. 28462 proposed activity complies with the State of North
- Carolina's approved Coastal Management Program
* A list of previous state or federal permits and will be conducted in a manner consistent with
issued for work on the project tract. Include permit such program.
numbers,permittee,and issuing dates.N/A
I certify that I am authorized to grant, and do in Signatur .Agent
fact,grant permission to representatives of state and Landowner or uthorized Agent
federal review agencies to enter on the Please indicate attachments pertaining to your
aforementioned lands in connection with evaluating proposed project.
information related to this permit application and X DCM MP-2 Excavation and Fill Information
follow-up monitoring of the project. DCM MP-3 Upland Development
DCM MP-4 Structures Information
I further certify that the information provided in this DCM MP-5 Bridges and Culverts
application is truthful to the best of my knowledge. DCM MP-6 Marina Development
This is the 16'h day of June,2003. NOTE:Please sign and date each attachment in
the space provided at the bottom of each
Print Name Steve Morrison,Agent form.
Revised 03/95
Form DCM-W-2
I(Tf
EXCAVATION O�° :► : :ir <i
AND FILL �i,11 ryT`f' '
D r 1 1 t��i, _C.)
(Except bridges and culverts)
Attach this form to Joint Application for CAMA
Major Permit, Form DCM-MP-1. Be sure to
complete all,other sections of the Joint Application 1. EXCAVATION
that relate to this proposed project. a. Amount of material to be excavated firom.below
M11W or NAT in cubic yards N/A
Describe below the purpose of proposed excavation
or fill activities. All values to be given in feet b. Type of material to be excavated
N/A
Average Final
Existing Project
Length Width Depth Depth c. Does the area to be excavated include coastal
wetlands (marsh), submerged aquatic vegetation
Access channel (SAVs)or other wetlands?—Yes No N/A
(NEW)or
(t W )N/A d. Highground excavation in cubic yards N/A
Canal N/A
2. DISPOSAL OF EXCAVATED
Boat N/A
Basin MATERIAL
a. Location of disposal area N/A
Boat N/A
Ramp b. Dimensions of disposal area N/A
Rock N/A c. Do you claim title to disposal area?N/A
Groin
Yes No
from the
r
M. If no,attach a letter granting permission f
Rock N/A owner.N/A
Breakwater
d. Will a disposal area be available for future
Other(Excluding N/A maintenance? Yes No N/A
shoreline stabiliz-
ation) if Yes, where?
Revised 03195
Form DCM-MP-2 (2)Dimensions of fill area N/A
(3)Purpose of fill N/A
e. Does the disposal area include any coastal
wetlands(marsh), SAVs or other wetlands? b. Will fill material be placed in coastal wetlands
Yes No N/A (marsh),SAVs or other wetlands?
x Yes No.Upper volunteer marsh fringe
at south end
f. Does the disposal include any area in the water? If yes,
Yes No N/A (1)Dimensions of fill area 340 square feet
(2)Purpose of fill Bulkhead backfill,lot restoration
3. SHORELINE STABILIZATION 5. GENERAL
_ _a. Type of shoreline stabilization
x Bulkhead �prap a. How will excavated or fill material be kept on
site and erosion controlled?Bulkhead to control on-
b. Length 190' including wing wall at north end going erosion
b. What type of construction equipment will be
c. Average distance waterward of MHW or NWL used(for example,dragline,backhoe,or hydraulic
9' dredge)?Backhoe,dozer,dump truck
d. Maximum distance waterward of MHW orNWL
21'
e. Shoreline erosion during preceding 12 months c. Will wetlands be crossed in transporting
Unknown but obviously continual due to equipment to project site? Yes x. No
fallen trees and 5-7' tall esc ment If yes, explain steps that will be taken to lessen
environmental impacts.
f. Type of bulkhead or riprap material
Corrugated sheeting with treated wood walers,can
g. Amount of fill in cubic yards to be placed below
water level - Applicant or Project Name A.O.Hardee
(1)Rip rap N/A
(2)Bulkhead backfill—30
Signature Agent
h. Type of fill material gpland sand
i Source of fill material lot areas and delivered ���/3
Date
4. OTHER FH,L ACTIWITIES
(Excluding Shoreline Stabilization)
4
a. Will fill material be brought to site? (1 1� It
Yes No N/A !• -! v
'I
F"'
If yes,
(1) Amount of material to be placed in the
water N/A C C)A"""
Revised 03195
Project Narrative
Shoreline Stabilization
Lots 188, 189, 190 Marlin Drive
Holden Beach, North Carolina
The proposed project consists of constructing a bulkhead and backfilling the eroded
shoreline of three adjoining undeveloped lots. The lots are located at a right angle
intersection of a man-made canal system within a largely built-out residential
neighborhood. This unique geographical setting has produced an unreasonable hardship
for the lot owners who are continuing to lose property due to the on-going erosion. An
escarpment, 5-7' high on the northern portion of the shoreline, has formed as a result of
this erosion and two large cedar trees along with shrubs and grasses have fallen onto the
bare intertidal flat in that location. The lot owners propose to reestablish the past canal
shoreline limits by erecting a bulkhead in alignment with the existing bulkhead on lot 187
and extending it parallel to the canal in front of all three lots before turning a wing wall
back into the land on"the northern property line of lot 190. In order to tie in with the
adjoining bulkhead, 340 square feet of the upper volunteer marsh fringe in that location
will be impacted. The bulkhead will consist of corrugated sheeting with treated wood
walers and cap. A deadman tie back system will be installed to provide additional wall
support. The bulkhead will be backfilled with sandy material from the three lots and
supplemented as necessary with contracted hauled-in material. The total area of the three
lots and total area of disturbance is .344 acres.
,v(j,
Landowner List
Lot 188 Regina Vereen
3561 Golf Avenue
Little River, S.C. 29566
843-399-7528
Lot 189 Sherri Holloway
615 Pennington Ridge Court
Lewisville,N.C. 27023
336-945-0554
Lot 190 Sonya Martin
1475 Four Mile Road
Conway, S.C. 29526
843-365-1225
(All are daughters of A.O. Hardee, Authorized Agent on application)
a -
�1 "
L�
PROPOSED BULKHEAD
CANAL 'f '' 1 ,j
W W „ Marsh
1
Bu t khead
Mean HWL (2. 9' )
Top of Bank WING ALL TO.BE ON PROPERTY LINE
AND EXTEND INTO UPLAND
N Rebnr Fd. 'N 87'30'13" E 100.0 ' 40'
.9B' Rebnr Fd, Toe o
Bank m
z to �� ( r
m .
r` CD ,� p Z
. LOT 190 ' ��� s n
�\a'- m
<2 �
9�C) . N 8T31'25" E m Fd. m Mean LWL (-1. 9' )
IP Fd, 93.60' rn .
Proposed .Butkhe.ad
2
S 01'20' 8" E TO AL GN WITH NEIGHBOR'S BULKHEAD
LOT 189 9.66'
o0 m
®
340 SQUARE FEET MARSH FRINGE IMPACT I W
IP Fd. N 87'20'09 E IP Fd. Dist, W (�
a
92.73' a
W 0 Marsh r
U, S 00'08'53" W A-- 4. — —A'
o LOT 188 49.46 I W
cn
N 86'56'58" E 100-.00 Rebnr Fd
cf) N
o Io Existing Bu.t'khead
cn
18 "7 NIA ,
SCALE 1 30
m; rr,
N 87'12'23" E
Rebar Fd. Rebnr Fd.
N 93.19'
o -
z BULKHEAD AND BACKFILL
N o A.O. HARDEE
_ o HOLDEN BEACH, N.C.
cp 0 6116103
Ln 0 SHEET 1 OF 9
BULKHEAD CROSS SECTION
-
V
SCALE 1 "= 4'
TO ALIGN WITH BULKHEAD ON LOT 187
A A,
FINISH.GRADE TREATED WOODEN CAP
EXISTING GRADE
BACKFILL
r
- WALE
F� TIE BACK ROD WALER
OtS� CORRUGATED SHEETING
O
2� MEAN HIGH WATER
09
DEADMAN �� CANAL 3
MEAN LOW WATER
SHEETING AND DEADMAN DEPTHS PER CONTRACTOR
BULKHEAD AND BACKFILL
A.O. HARDEE
HOLDEN BEACH, N.C.
6116103
SHEET 2 OF 9
y % `'J rpunanaP-- 4- `� e _ - - T'�,�� \ n• > \� .� .-- aR -{ I- -
Briery � yC ?�f -r' -.. -.__ _ _ ..� •t �� Eauml __ `?�-_ __ �s ♦'i+ s t�=-�`_- —�r �^o-
Y -� +ram - - - - - - r:.•.- �_ _ i{.. ��-_- ,--..`-
_ LOCATION MAP
--
G Sevin -.+
mr
- - ga4�EHp FFa.R xa �+_'4--�- "f T_- L I;-a 0 /'�� i /r~ .° aPo `-- • __'t�'�� � �V:dt"�`���9Y_''+- e Q _ �I� -? t-4
/ j Aif�.. � � - 0_.���6�1 Waccaq �B.T¢'fs(a--•.,. - I- 1 `^-Y�' `��le�_ _ _ �`r _r_ - - _ _ -t� r t�
_ r'aaFe FBLRl F �-^- � � P -_�_�-.. I ``GTS c��` �i• _' _� _-� _ -- -
- - � �rA � 7 s St laeE -.qy_ o-i - •_� - -_� r -Y•__ -`.\1C'A_ -_ _
// SafIX,Im'• '\'.4 O \ =�^~TRH_ - m J--'' ��_r_ -��r
.s - - ..-_may`"' � - ,�, �_ - �o +•o. _- .l
lO O_ _-_ `_rt SJaA'C\BaWCMY o. _r. 41l 9a•r�n B nrh �_ ..���4 - wf-�' - B � _etG\
905
•YEMIIF Ft�'�, _ _ __ '\ `°
Lo
r - :Ii --_
�A=`- `= -T-+-. ,.,
4" 904 � a° r' >orw' l" 130 r �- =_y- 4y_ A 1
i'
E ...aE i _Bns. - - `poa,o _
EMES ra y� aoaE P
Hi I _ r _ _ � r
', Ot4G—
_ a�pw00ooLmC -( _ -SrBall nd 1 4M1 __ d.[°u�
G
s in J j
p-
�IrT Tl� 0fit. _h._ �g 10 tr
)11
!O_ ON ShanaaP X•`I,alf Pa - i s
-_� _ T I~ ; _ .� - _i? D°9hPcd a 0`a aaf� n r Ol0 S PL COS SXELL�. V` =• d
04 0 b Sh°ll�
d.
dl
4
irll
�I aw
1 gC�
Hal�Ya' "
, 904
179 a3 ; •y'lP Rine;c"-
.Jv J Ova We- Beach
\ \ _ Ocean Isle - -
Fifhing Pier
� YP r c $ >• 13 Y
1 .y
Sunset each Fishing Pier it tr y
77�� Island '\ L 1 L
V Ch,-Gro
r SCALE 1 "= 2.4 MILES
mch
• r t - .f _ t it � I�-
E � �
.._.x..r�al..-:Ia2�L"LL��:.'-•-3.i.._ n .fA '_.�...�'.t,. .,....� -. - 1(' .j - .
BULKHEAD AND BACKFILL
A.O. HARDEE
HOLDEN BEACH, N.C.
6/16103
SHEET 6 OF 9 A..:..T'.:'L A N I C
PP
PaLPs b 34r B'
r
Li
' USGS QUAD MAP •• � � '1/ 6 -�� '
1266✓ goy '` '� _� � (.� 4�, •w !� . �-. � p^a�.,���.,��.
34.
40
,7 �. �' ''• i,Tel;.—, y^ \ �— �
�`��_� 7 •94 ,•a 7. I - 27 C.f 25 •\ •'
kja
S ITE
J'V _ 5.. y r".� �s �f ` t..: S, �OaCf8f71jJS
n��_ •.J t':. .v�--„BQd --�- -- r _ ��_— _ �y � ����'�'"(L�/�,'�\�) ::dt,..-..wa,:.».�a a 4 z•_. ,r� .r.�s.�c:�i I 70 r�:� O
•/! - (IV'✓1'/ -�_- - .� .. _ .� - _ S 4 a�a Y" �`n! tV i d:,:�key("�id16,r`. '•G
- F
Qlderl=Beach - G�if_
-
n `I 1—ter
each
SCALE 1 "= 2000'
Y _
ty f S
r>' BULKHEAD AND BACKFILL
x
A.O. HARDEE
HOLDEN BEACH, N.C.
! a y 6116103
- -__ SHEET 7 OF 9
ciit
r
'."IfI.Fq�PT LAM.DR— .i i
.... ......... .. ......... 1 19. , g
��I.'TBIAN ArY
W':
DA
GGotte- 1.14.JENO L DR X WAL
-S-A�I,4Y LN ............... ART P
1 IS.HAPPY V
�,I:I"VE.YS.TONE C�-. 00, t,(,D ROAD MAP ......SUPER ENTER
6"1" RISE OR
OTrE Ill 8.DEERP%RK DR
1<19.RISING MEADOW
..............
----4-HWy
T RD
ocE IEWET
LA. GULL L§PMM QB_ -SELLA"
RD 1jIPR10E1ARM Cf -STRI
R—GRINF LL.Y 'T . nr 5
4.MURDOCK CT , t 11 ov,
5.JONES ST
1 6.FOX ST
'T U
in 2-1 1 S.ERAV1 �p TAFT.RD
LAUREL
- K CT I-- SIDE CT ,0
3 CA
SWELL
:W �9
AIW14�1�T \1
5.DEER
7':F.`.,.T`R"rCT-.j,-L-
ui T T ��b�k
0.HOLLAND CT Is
VD Mp
9.8ENSON CT
10 OAK
LEAF CT..'� c ?-Ifj lit)
1.EGGERT.CT DI a •B.PA11i
9.HOOAN CT
Apims"',
CEW 0 �H�1&11LNACUTI T 130
t.Es 11.SANDTRAP DF51-
sTAPO TpOD �2.F IRWAY DR* C?
%
3.S EAD CT
4
U TFR`
r_ AVE 6!�q;ADJIA OR OR LUE HER
L
-6AY RD
0
c9
801"
"4.qAbp AV BROOK HOLLOW DRRp GROVE
ru' 41, /y), ,Ne-,
0 ..........
m ......... ..............
9� mUN 1 .............
n
PHI "R iA 131 N#15
-4
1,01 —SEASHDRE HILLS ......-
�SHDRE HILLS
II
S
ci) r LA r,1, ol LL R.
I DZ� I� po -A t�!� �SHDF IHST� ;nr
3. 0
-!TM�
D
Ou 11
BEACH 16 k %f
16 ........ u
0 IA. Al
14
NON,
Eel( SITE
sc 0
Q c 2 1 CONES qu
0
1.0 RD P,
lk OR'I'E9
wi FM
v
-p
0
9 -ND PT IV.
a
�5SIXTH
Ix Tw; Ns T
FIFTH SABBATH
& ArDR
0
NOT TO SCALE V. ......
NO f�vc -A'T'2,ff-F-
0 'T o tb Aj
OCEAN 10, ,wsJ 130 q-
c
MY
J" V
t ,
a
DR 57
ID
00 y BULKHEAD AND BACKFILL
W
lu
to
g
w ;t13
-n
HOLDEN BEACH. N.C.
; � m
qq g- Oil
f
6116/03
w
SHEET 8 OF 9
u L6�t
BRUNSWICK COUNTY SOIL SURVEY
rii7il
ot
iB
Ma,
T6
y lB ;� �-t• `•""Yv4 � �'�t.'.<•,� .r \Y`�•�w-,t' � da:r--- .. i, d.XS A�..�"d:. ;y �°i.� 4cv�S ,.•.d.�•'. •.
KrB.-
KrB g!
-7,
V,
pA;-
:;Kr e-w-,
W;pi
I IK CA.
SITES
VkO,
a6dinB CAr v
:17
0"
'��f s^' s���`. . � � ,:��•, t h-B�g��'��"�.;�{`�3f-"" J �1�"c � ti_".�yf'�����^.. D_.'-c `:,°'r�r�
07
-4. N eE
Nt
GP
IN-
c
— ----------
;1116 NCE
Z.
mot .
-In-
77
If
C
Z-
'
SCALE 1 2000
a
"'N k.......
Ilk Q3
BULKHEAD AND BACKFILL
A.O. HARDEE
33*5,
p
HOLDEN BEACH, N.C. 78*30,D
6116103
SHEET OF
'c
8e6t 8y: LAND MANAGEMENT; 91U 4!i2 UUUU ; JUM'-11 -U3 ZI:1Ur@1; rage 212
Agent Authorization]Form
LiW6�fdm
do hereby give my permission for Land
g, Inc. (LMG) to prepare and submit on my behalf, application
materials for a CAMA Major Development Permit for a bulkhead and b$ckfill on Lots
188, 199, and 190 Marlin Drive; Holden Beach, N.C. i further give my permission for
LMG to provide additional 'materials as may be requested by the review agencies.
�8nnt Date
w `tit
1, `l l .:
100'd dT0:E0 E0/TT/80 EOSTEtZ S17e 'dui 'uocz K2 aao�Pu nN
Sent By: LAND MANAGtMtN I i v •+ac vvuv +.may -• ^'
Agent Authorization Form
I,Sherri Holloway,do hereby give my permisxion to-A.O.-Hardee to"act as my agent to
apply for a CAMA Major Development Permit for a bulkhead and baekfill on my
property at lot 189 Marlin Drivc,Holden Beach,N.C.
Z — -03
sign atu a Date
RECEIVED
AUG 2 7 Yf w i
OR C®��GH �-
NAGEM
n r r.•,r. q I i
Sent By: LANU MANAUtMtNI; � •, •� ••�••� , , ,
Agent Authorization Form
1, Sonya Martin,do hereby give my permission to A.O.Hardee to act as my agent to
apply for a CA.MA Major Development Permit for a bulkhead and backfill on my
Property at lot 190 Marlin Drive,Holden Beach,N.C.
Signatur Date 8 f$ 3
F.
Mft nY: LARu 1..�
Agent Authorization Form
T,Regina Vereen,do hereby give my permission to AO. Hardee to act as my agent to
apply for a CAMA Major Development Permit for a bulkhead and backfill on may
property at lot 189 Marlin Drive,Holden Beach.N.C.
_. .
Si reT _ Date
�. AUJ ? 5; 2003
�JLL
DIVISION OF COASTAL MANAGEMENT
APPLICATION TRANSMITTAL AND PROCESSING RECORD
A) APPLICANT: A. O. Hardee County: Brunswick
LOCATION OF PROJECT: Lots 188, 189 & 190 at the end of Marlin Dr., Holden Beach
DATE APPLICATION RECEIVED COMPLETE BY FIELD: July 1, 2003
FIELD RECOMMENDATION: Attached: YES To Be Forwarded:No
CONSISTENCY DETERMINATION: Attached:No To Be Forwarded:Yes
FIELD REPRESENTATIVE: Ed Brooks DISTRICT OFFICE: Wilmington
DISTRICT MANAGER REVIEW:
B) DATE APPLICATION RECEIVED INRALEIGH: FEE REC'D:$
PUBLIC NOTICE REC'D: ✓ END OF NOTICE DATE: q /1, S-1 u3
ADJ. RIP. PROP NOTICES REC'D: DEED REC'D:
APPLICATION ASSIGNED TO: ON:
C) 75 DAY DEADLINE: o3p, 150 DAY DEADLINE: t 2.*r/0 3
MAIL OUT DATE: 03 STATE DUE DATE: I S D
FEDERAL DUE DATE: t cp 123/y3 FED COMMENTS REC'D: lIlly M
PERMIT FINAL ACTION: ISSUE DENY DRAFT ON ll a3
AGENCY DATE COMMENTS OBJECTIONS: NOTES
RETURNED YES NO
Coastal Management-Regional Representative S-fZ,t`0-7 ✓ L'(J7�tlft GY�"ff
Coastal Management-LUP Consistency F-IZ,Z/q
Division of Community Assistance Sr/2�1,j3
Land Quality Section Sr js?-403 AJC-
Division of Water Quality 10/13/03
Storm Water Management(DWQ) -7/t,}/0% ✓ 'EXe-wv►ILt
State Property Office 9 1 3 0 3 ✓ tj C-
Division of Archives&History ,33 ✓
Division of Environmental Health 9 12,103
Division of Highways 9 13101 ✓ #Jc-
Wildlife Resources Commission 9 1Zz(d3
Division. of Water Resources 4/12/u3
Division of Marine Fisheries �{ (S��3 ✓
Submerged Lands(DMF)
Permit# /73=U
DCM Coordinator: J-r
MAILING DISTRIBUTION:/
Permitee: / Z,"- e � l Lja G AfG%ti/ 7
DCM Field Offices:
Morehead City
AV*&hiP�n-
Wilmington
US Army Corps of Engineers (USACE):
Washington: Mike Bell (NCDOT
ReINCDOT)
igh Bland
Wilmington: Da*GZimry T-4
Henry Wicker
Others:
Cultural Resources: Renee Gledhill-Early
Environmental Health: Beverly Sanders
Marine Fisheries: Mike Street
NCDOT: Roberto Canales
Shellfish Sanitation: Patti Fowler
State Property Office: Joseph Henderson
Water Quality: John Dorney
OT)
Water Resources: John Sutherland
Wildlife Resources: Dauk McLL-
Bennett Wynne
17avi�rl (�v�N: rr�n�T)
Tra_ s-W L,A eN��QT)
FAXING DISTRIBUTION:
Permitee at C/�Z/,
Agent at
DCM Field Offices:
n�
Morehead City
Wilmington
US Army orps of Engineers (USAGE):
Washin ike Bell (NCDOT)
Bill B NCDOT)
aleigh Bland
Wilmington: Dave Ti n 6 ---
Henry Wicker
Updated as 2/28/03
X00
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr.,Secretary
November 24, 2003
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
THOMAS G WEBB
151 MARLIN DRIVE
HOLDEN BEACH NC 28462
Dear Mr. Webb:
Thank you for your September 7, 2003, letter concerning the Coastal Area Management Act
(CAMA) Major Development Permit application submitted by A.O. Hardee seeking authorization to
construct a bulkhead along the shoreline of three lots at the end of Marlin Drive, In Holden Beach,
Brunswick County. The Division appreciates your concerns about the proposed project, and we have
looked very closely at the issues raised in your letter.
The Coastal Area Management Act permit review process involves a coordinated state and
federal review of each permit application, with all review agency comments considered by the
Division before final action is taken on a permit application. In this case, no significant resource
concerns or objections were expressed by these review agencies. Based on this, the Division has
determined that the proposed project is consistent with the Rules of the Coastal Resources
Commission, as well as those of other State regulatory agencies. Consequently, the Division has
issued a permit for the proposed activity on November 24, 2003, and a copy is being provided to you
for your information.
If you wish to object to the issuance of the permit, you may request an appeal of this decision
—within twenty (20) days of the permit decision. §113A-121.1(b). If you would like copies of the
appropriate appeal forms or should you like to discuss the specifics of the process, please contact me
by telephone at (919) 733-2293, extension 240, or by email at Jeff.Sebaffer@ncmail.net.
Sincerely,
Jeff Schaffer
Assistant Major Permits/Consistency Coordinator
cc: Ed Brooks—DCM Wilmington
DCM, Morehead City
1638 Mail Service Center, Raleigh, North Carolina 27699-1638
Phone: 919-733-2293\FAX: 919-733-1495\Internet: http://www.nccoastalmanagement.net
An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper
J /W
RElu � �
9W C A 2522 Nov 1 7003
%dmaytm,A"%w4w 28402 )ROFWASITAL41NAGEMEN
-wo-452-000;f ALUA
99.&�4
11/14/03 S1 .5d ..A 6 9'.k
�te�eleen✓uouioorz 3805 VakAfao&.Wvmuw
(p CJi dmaikgtm ✓1f8 28403
d Henry Wicker
US Army Corps of Engineers
Regulatory Branch
P.O. Box 1890
Wilmington,N.C. 28402-1890
Re: Action ID.No. 200301-19, CAMA Major Permit, A.O. Hardee
Dear Henry,
I am in receipt of your 10/29/03 letter regarding the bulkhead alignment for Mr. A.O.
Hardee (agent for-his three daughters who own the lots) as requested in his CAMA Major
Permit application. As discussed by phone yesterday, we received CAMA authorization
for another bulkhead on five other canal lots owned by Mr. Hardee on Tuna drive which
is the next street to the east in the same neighborhood-(Permit Number 100-00 and minor
modification). In that earlier permitted project, he was allowed to align his bulkhead with
the neighboring.bulkheads, which resulted in the backfilling of 554 square feet (0.013
acre) of coastal wetland. This amount of wetland impact within the man made canal
system was determined to be insignificant by DCM and therefore allowed. We received
Corps authorization for that project under Nationwide Permit No. 18 (COE Action Id.
No. 200001294). In the current CAMA Major application, W. Hardee is requesting a
total of 340 square feet (0.008 acre)of backfill for the bulkhead.
I have enclosed. a copy of the earlier bulkhead and backfill application materials and
authorization for your reference. Please contact me with any questions that you may have
regarding this information..Thank you for your assistance.
Sincerely,
Steve Morn n
Environmental Consultant
Encl: permit Number l 00-0( , application materials
Cc: Jeff Schaffer
A.O. Hardee .
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
_ P.O.BOX 1890
WILMINGTON.NORTH CAROLINA 28402-1890
REPLY TO
ATTENTION OR '
October 29, 2003
ECOV0
Regulatory Division IN,
Action ID. No. 200301191 �(� �L4kWAG ENt
Mr-.-A.O. Hardee
55 Park Street Extension
Little River, North Carolina 29566
Dear Mr. Hardee:
On August 23, 2003, we received your application for Department of the Army
authorization to construct a bulkhead along the shoreline of three undeveloped lots, adjacent to a
man-made canal, at the end of Marlin Drive, in Holden Beach, Brunswick County, North
Carolina.
After review of your proposal the Federal agencies and Corps are requesting a revision of
your application and plans. These recommendations are due to anticipated adverse
environmental impacts. You have not shown the need to incorporate the coastal-wetland border
and the lots can be developed without the loss of the wetlands by aligning the bulkhead on the
land ward edge of the marsh. Also, filling of coastal wetlands is inconsistent with the State
CAMA (Coastal Area Management Act) Program.
Our administrative process provides you the opportunity to propose a resolution and/or
rebut any and all objections before a final decision is made. In this regard, I would appreciate
being made aware of your intentions, in writing, on or before November 12, 2003.
I am responsible for processing your application and available to assist you. If you have
any questions you may call me at (910) 251-4930.
Sincerely,
Henry Wicker, Project Manager
Wilmington Regulatory Field Office
a
Copies Furnished:
Mr. Jim Gregson, District Manager
Wilmington Regional Office
North Carolina Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
�j Mr. Doug Huggett
Division of Coastal Management
North Carolina Department of
Environment and Natural Resources
1638 Mail Service Center
Raleigh, North Carolina 27699-1638
t;
A 0
� xa
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley,Governor Donna D. Moffitt, Director William G. Ross Jr.,Secretary
October 13, 2003
Thomas G. Webb
151 Marlin Drive
Holden Beach, NC 28462
Dear Mr. Webb:
Thank you for your September 7, 2003, letter concerning the Coastal Area Management
Act (CAMA) Major Development Permit application submitted by A.O. Hardee seeking
authorization to construct a bulkhead along the shoreline of three lots at the end of Marlin Drive,
In Holden Beach, Brunswick County. As you may be aware, the Division of Coastal
Management is coordinating a multi-agency state and federal review of the proposal. I can
assure you that your comments will be examined and taken into consideration prior to the
Division taking final action on this permit application, and you will be informed of this final
action.
The Division appreciates you taking the time to comment on this application, and your
letter will be added to the official permit application file for this project. Please feel free to
contact me at (919) 733-2293, extension 240, or-email me at Jeff.Schaffe.r@ncmaiI.net, if you
should have any additional concerns relating to this project.
Sincerely,
Jeff Schaffer
Assistant Major Permits Coordinator
cc: Ed Brooks—DCM Wilmington
DCM, Morehead City
1638 Mail Service Center, Raleigh, North Carolina 27699-1638
Phone: 919-733-2293\FAX: 919-733-1495\Internet: http://www.nccoastalmanagement.net
An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper
j DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT,CORPS OF ENGINEERS
_ P.O.BOX 1890
WILMINGTON.NORTH CAROLINA 28402-1890
REPLY TO
ATTENTION OF:
September 29, 2003
Regulatory Division
Action ID No. 200301191 �1 ��
OCT' 13 2003
�IV.OFCOq, � , nnp
-A.'O'. Hardee'
55 Park Street Extension
Little River, South Carolina 29566
Dear Mr. Hardee:
On July 24, 2000, we renewed general permit No. 198000291 (copy enclosed), which
provides Federal authorization for construction activities that receive authorization from the State
of North Carolina.
A review of your request to construct a bulkhead along the shoreline of three undeveloped
lots, adjacent to a man-made canal, at the end of Marlin Drive, in Holden Beach, Brunswick
County, North Carolina, indicates it to be a candidate for Federal authorization under this general
permit. Accordingly, the administrative processing of your application will be accomplished by
the North Carolina Division of Coastal Management. Comments from Federal review agencies
will be furnished to the State.
If your application must be withdrawn from this general permit process for any reason,
you will be informed regarding its further management. If there are no unresolved differences in
State-Federal positions or policies, the final action taken on your application by the State will.
result in your receiving written notice from us that your application is consistent with the general
permit and you may commence your activity. Only after receiving such confirmation should you
begin work.
Your application, pursuant to Section 404 of the Clean Water Act and Section 10 of the
River and Harbor Act has been assigned Action ID No. 2003011911 will be coordinating your
permit application with other Federal agencies. You may contact me at (910) 251-4930.
Sincerely,
Henry Wicker, Project Manager
Wilmington Regulatory Field Office
Enclosure
Copies Furnished (without enclosure):
Mr. Doug Huggett Mr. Ronald J. Mikulak, Chief
Division of Coastal Management Wetlands Section-Region IV
North Carolina Department of Environment Water Management Division
and Natural Resources U.S. Environmental Protection Agency
1638 Mail Service Center 61 Forsyth Street, SW
Raleigh, North Carolina 27699-1638 Atlanta, Georgia 30303
Mr. John Dorney Mr. Jim Gregson, District Manager
Division of Water Quality Wilmington Regional Office
North Carolina Department of Environment North Carolina Division of Coastal Management
and Natural Resources 127 Cardinal Drive Extension
1650 Mail Service Center Wilmington, North Carolina 28405
Raleigh, North Carolina 27699-1650
Mr. Garland B. Pardue
U. S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh, North Carolina 27636-3726
Mr. David Rackley
National Marine Fisheries Service, NOAA
219 Fort Johnson Road
Charleston, South Carolina 29412-9110
2
IE
��P 0 2003
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS �o®F�A5TAL�6flA6d� lr
P.O. BOX 1890 e� �A
WILMINGTON, NORTH CAROLINA 28402-1890 n1?Av
Regulatory" iv
ision REFER TO 9
Action ID. r2DD.;D[191 Applicant: ; D. NCLY'I t°�
• I'�'ti�4µl-wt�4c�e Cr4-r�� _.��.�._.------ - - `I
Waterway: V}rk', IQ'PLQ Ld County: rwy,501 Type Work: true, l(
Mr.Ron Sechler Commander,Aoww
National Marine Fisheries Coast Guard,Atlantic Area
Service,NOAA 431 Crawford Street
Pivers Island Portsmouth,Virginia 23704
Beaufort,North Carolina 28516
Mr.Ronald J.Mikulak, Chief Without enclosures
Wetlands Section—IV
Water Management Division Mr..-Doug-Huggett
U.S.Environmental Protection Agency Division of Coastal Management
61'Forsyth Street, SW NC Dept of Environment and
Atlanta, Georgia 30303 Natural Resources
1638 Mail Service Center
Mr. Garland Pardue,Field Supervisor Raleigh,North Carolina 27699-1638
Fish and Wildlife Enhancement
U.S. Fish and Wildlife.Enhancement A r
Post Office Box 33726 rRegional Office
Raleigh,North Carolina 27636-3726 Division of Coastal Management
NC Department of Enviornment,Health
Commanding Officer and Natural Resources
United States Coast Guard 6-J -'ve-
Marine Safety Office n
1502 North Front Street
Wilmington,NC 28405 Mr.David Rackley
National Marine Fisheries Service,NOAA
219 Forth Johnson Road
Gentlemen: Charleston, South Carolina 29412-9110
Pursuant to Action ID No. 198000291, the CAMA-Corps general permit/processing agreement, a
State Field Investigation Report is enclosed. Your comments and/or recommendations would be
appreciated on or before 10- a 3 —b 3
Questions or comments may be addressed to the undersigned, available at telephone
(910) 251-4930.
Si cerely,
Henry Wicker,Project Manager
Wilmington Regulatory Field Office
Enclosure
1
A
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F.Easley,Governor Donna D. Moffitt, Director William G.Ross Jr.,Secretary
September 15, 2003
A.O. Hardee
55 Park Street Extension
Little River, SC 29566
Dear Mr. Hardee:
This letter is with reference to the application you submitted on behalf of your daughters
for a Coastal Area Management Act Major Development and state dredge and fill permit to
construct a bulkhead along the shoreline of three undeveloped lots (188, 189, and 190) at the end
of Marlin Drive, Holden Beach, Brunsiwck County, NC. Although processing of the application
is nearing completion, additional time is needed for this office to complete the review and make
a decision on your request. Therefore, it is necessary that the standard review time be extended.
An additional 75 days is provided by G.S. 113A-122(c) which would make November 28, 2003
the new deadline for reaching a decision on your request. However, we expect to take action
prior to that time and will do so as soon as possible. In the interim, if you have any question on
the status of your application, do not hesitate to contact this office.
Very sincerely,
eff Schaffer
Asst. Major Permits/Consistency Coordinator
cc: Ed Brooks—DCM,Wilmington
DCM,Morehead City
Steve Morrison,Land Management Group,Inc., PO Box 2522,Wilmington,NC 28402
1638 Mail Service Center, Raleigh, North Carolina 27699-1638
Phone: 919-733-2293\FAX: 919-733-1495\Internet: http://www.nccoastalmanagement.net
An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper
WA TF Michael F.Easley,Governor
William G.Ross Jr.,Secretary
\m G North Carolina Department of Environment and Natural Resources
rAlan W.Klimek,P.E.Director
-� Division of Water Quality
O 'C Coleen H.Sullins,Deputy Director
Division of Water Quality
September 11;2003
Mr.A.O.Hardee
55 Park Street Extension
Little River, SC 29566
SUBJECT: Approval of 401 Water Quality Certification
and Additional Conditions
Bulkhead lots 188, 189,& 190/Marlin Drive
DWQ Project#031063
Brunswick County
Dear Mr. Hardee:
You have our approval,in accordance with the attached conditions(WQC#3400)to conduct the following
activity on lots 188,189 and 190 at the.end of Marlin Drive in Holden Beach,Brunswick County. This approval
allows you to:
1. Fill 340 square feet of coastal wetlands and 1500 square feet of jurisdictional waters for the purpose
of constructing a 190 linear feet bulkhead along the eroding shoreline of three undeveloped lots,
adjacent to a man-made canal.
This approval is only valid for the purpose and design that you described in your CAMA application
received by the Division of Water Quality(DWQ)on August 22,2003. After reviewing your application,we
have determined that General Water Quality Certification Number 3400 covers this activity. This Certification
allows you to use your CAMA Permit when the NC Division of Coastal Management issues it. Please keep in
mind that there may be additional Federal, State or Local regulations applicable to your project,such as(but not
limited to)Sediment and Erosion Control,Non-Discharge and Water Supply Watershed regulations,and General
NPDES Stormwater and Coastal Stormwater. In addition,this approval will expire when the accompanying
CAMA Permit expires unless otherwise specified in the General Certification.
This approval is only valid for the purpose and design that you described in your CAMA Major Permit
application received by the Division of Coastal Management on June 25,2003.If you change or modify your
project,you must notify the Division(DWQ)in writing and you may be required to send us a new
application for a new certification. If the property is sold,the new owner must be given a copy of the
Certification and approval letter and is thereby responsible for complying with all conditions. If total
wetland fills for this project(now or in the future)exceed one acre,compensatory mitigation may be required
as described in 15A NCAC 2H.0506(h). For this approval to be valid,you must follow the conditions
listed in the attached certification and the additional conditions listed below:
1. Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules,and any subsequent modifications,the applicant is required to return the attached
certificate of completion to this office and a copy to the 401/Wetlands Unit,North Carolina
Division of Water Quality, 1650 Mail Service Center,Raleigh,NC,27699-1650;
N.C.Division of Water Quality 127 Cardinal Drive Extension (910)395-3900 Customer Service
Wilmington Regional Office Wilmington,NC 28405 (910)350-2004 Fax 1 800 623-7748 NC-D 3tS
Page Two
Mr.Hardee
DWQ Project#031063
September 11,2003
2. The turbidity standard of 25 NTUs(Nephelometric Turbidity Units) shall not be exceeded as
described in 15 A NCAC 2B. .0200.Appropriate sediment and erosion control practices must be
used to meet this standard;
3. The only fill or excavation allowed in wetlands or waters is described in the first section of this
certification. Any additional impacts,including impacts that result from erosion,will be a
violation of this 401 Water Quality Certification.
Please notify this Office at the number listed below if any problem arises during the construction of
the project that may affect water quality.
If you do not accept any of the conditions of this certification,you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a
written petition conforming to Chapter 150B of the North Carolina General Statutes to the Office of
Administrative Hearings, 6714 Mail Service Center,Raleigh,N.C. 27699-6714. This certification and its
conditions are final and binding unless you ask for a hearing.
This letter completes the review of the DWQ Permit#031063 under Section 401 of the Clean Water
Act. If you have any questions,please telephone Noelle Lutheran or Rick Shiver at 910-395-3900.
Sincerely,
&e�
Alan W.Klimek,P.E.,Director
` Division of Water Quality
Attachments: GC#3400
Certificate of Completion
cc: Corps of Engineers Wilmington Field Office—Henry Wicker
WiRO-Noelle Lutheran
401/Wetland Unit, Central Office—Cyndi Karoly
CAMA/Morehead City—Ed Brooks
CAMA Raleigh—Doug HuggettED
'�Central`Files 'OCT 1 6 nui
J1 NWAT GEMEm,
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F.Easley,Governor Donna D. Moffitt, Director William G.Ross Jr.,Secretary
August 25,2003
MEMORANDUM
50V
TO: Mr. John Sutherland,Chief
Water Planning Section
Division of Water Resources � �L�ANpGE�EEN�
FROM: Doug Huggett
Major Permits Processing Coordinator
SUBJECT: CAMA PERMIT APPLICATION REVIEW
APPLICANT: A. HARDEE
1
PROJECT LOCATION: LOTS 188, 189, & 190 AT THE END OF MARLIN DRIVE, HOLDEN
BEACH, BRUNSWICK COUNTY.
PROPOSED PROJECT: CONSTRUCT A BULKHEAD (190 L.F.) ALONG .THE SHORELINE
OF THREE (3) UNDEVELOPED LOTS, ADJACENT TO A MAN-
MADE CANAL,AT THE END OF MARLIN DRIVE.
Please indicate below your agency's position or viewpoint on the proposed project and return this form
by September 15, 2003. If you have any questions regarding the proposed project; please contact Doug
Huggett at (919) 733-2293, ext. 245. When appropriate, in-depth comments with supporting data is
requested.
REPLY
This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project, only if the recommended changes are incorporated.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE
1638 Mail Service Center, Raleigh, North Carolina 27699-1638
Phone: 919-733-2293\FAX: 919-733-1495\Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity\Affirmative Action Employer-50%Recycled\10%Post Consumer Paper
NCDENR 2 2003
North Carolina Department of Environment and Natural Res ourceb OECOAOTALMANAGEME10
Division of Coastal Management SUM
Michael F.Easley,Governor Donna D. Moffitt, Director William G.Ross Jr.,Secretary
August 25,2003
MEMORANDUM �C
TO: Mike Kelly,Acting Director
Division of Environmental Health ,16 a1
FROM: Doug Huggett rl
ON
Major Permits Processing Coordinator '�,—
SUBJECT: CAMA PERMIT APPLICATION REVIEW
APPLICANT: A.O.-HARDEE
PROJECT LOCATION: LOTS 188, 189, & 190 AT THE END OF MARLIN DRIVE, HOLDEN
BEACH, BRUNSWICK COUNTY.
PROPOSED PROJECT: CONSTRUCT A BULKHEAD (190 L.F.) ALONG THE SHORELINE
OF THREE (3) UNDEVELOPED LOTS, ADJACENT TO A MAN-
MADE CANAL, AT THE END OF MARLIN DRIVE.
Please indicate below your agency's position or viewpoint on the proposed project and return this form
by September 15, 2003. If you have any questions regarding the proposed project, please contact Doug
Huggett at (919) 733-2293, ext. 245. When appropriate, in-depth comments with supporting data is
requested.
REPLY .rL�✓�f �fcoE�A.PHPM
This agency has no objection to the project as proposed. ,
This agency has no comment on the proposed project.
This agency approves of the project, only if the recommended changes are incorporated.
This agency objects to the project for reasons described in the attached comments.
SIGN 10, ti ILL r DATE
1638 Mail Service Center, Raleigh, North Carolina 27699-1638
Phone: 919-733-2293\FAX: 919-733-1495\Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper
RECB ® �
Q IrA
SEP I,�0_ 2003 --�—
� NCDENR Aucs 2003
iN•� lVorth Carolina Department of Environment and Natural Resource
%S7URIS;°RESERlk1nQN omcil .
Division of Coastal Management
Michael F.Easley,Governor Donna D. Moffitt, Director William G.Ross Jr.,Secretary
August 25,2003 2 2290
MEMORANDUM
TO: Ms. Renee Gledhill-Early,Director IfO
Division of Cultural Resources
Archives &History Building
AWL � (l0-(mz�
FROM: Doug Huggettm
Major Permits Processing Coordinator
SUBJECT: CAMA PERMIT APPLICATION REVIEW
APPLICANT: A.O. HARDEE-
PROJECT LOCATION: LOTS 188, 189, & 190 AT THE END OF MARLIN DRIVE, HOLDEN
BEACH, BRUNSWICK COUNTY.
PROPOSED PROJECT: CONSTRUCT A BULKHEAD (190 L.F.) ALONG THE SHORELINE
OF THREE (3) UNDEVELOPED LOTS, ADJACENT TO A MAN-
MADE CANAL, AT THE END OF MARLIN DRIVE.
Please indicate below your agency's position or viewpoint on the proposed project and return this form
by September 15, 2003. If you have any questions regarding the proposed project, please contact Doug
Huggett at (919) 733-2293, ext. 245. When appropriate, in-depth comments with supporting data is
requested.
REPLY
This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project, only if the recommended changes are incorporated.
This agency objects to the project for reasons described in the attached comments.
SIGNED %6DATE 1 &�)
1638 Mail Service Center, Raleigh, North Carolina 27699-1638
Phone: 919-733-2293\FAX: 919-733-1495\ Internet: http://dcm2..enr.state.nc.us
An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper
AUC27' 2M,
AJ
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary
August 20, 2003 'AUG 2 6 2003
MEMORANDUM
I ,!c
TO: Mr. Charles F. Stehman, P.G., Ph.D. ZaRlIzo
Division of Water Quality/Groundwater Section 54/ SEP 1 12003
FROM: Doug Huggett 0-FCOAN ZM,
Major Permits Processing Coordinator
% erRaVl
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: A. O. Hardee
Project Location: Lots 188, 189 & 190 at the end of Marlin Dr., Holden Beach, Brunswick County
Proposed Project: To construct a bulkhead (190 l.f.) along the shoreline. of three (3) undeveloped lots,
adjacent to a man-made canal, at the end of Marlin Drive. The proposed bulkhead
alignment would incorporate 340 sgft. of coastal wetlands and approximately 1500 sqft.
of intertidal area and shallow bottom.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
September 10, 2003. If you have any questions regarding the proposed project, please contact Ed Brooks at Ext.
247. When appropriate, in-depth comments with supporting data is requested.
REPLY: ✓ This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are incorporated.
See attached. .
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE �2 v
127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845
Phone: 910-395-3900\Fax: 910-350-2004\Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity\Affirmative Action Employer-50%Recycled\10%Post Consumer Paper
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F.Easley,Governor Donna D. Moffitt, Director William G.Ross Jr.,Secretary
August 25,2003
MEMORANDUM
RECEIVED
TO: Mr. Roberto Canales CEP 8 2003
State Construction/Materials Branch MOCOASTALMMAGNEW
Division of Highways
FROM: Doug Huggett
Major Permits Processing Coordinator
SUBJECT: CAMA PERMIT APPLICATION REVIEW
APPLICANT: A.O.-HARDEE .
PROJECT LOCATION: LOTS 188, 189, & 190 AT THE END OF MARLIN DRIVE, HOLDEN
BEACH, BRUNSWICK COUNTY.
PROPOSED PROJECT: CONSTRUCT A BULKHEAD (190 L.F.) ALONG THE SHORELINE
OF THREE (3) UNDEVELOPED LOTS, ADJACENT TO A MAN-
MADE CANAL, AT THE END OF MARLIN DRIVE.
Please indicate below your agency's position or viewpoint on the proposed project and return this form
by September 15, 2003. If you have any questions regarding the proposed project, please contact Doug
Huggett at (919) 733-2293, ext. 245. When appropriate, in-depth comments with supporting data is
requested.
REPLY
This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project, only if the recommended changes are incorporated.
This agency objects-to the project for reasons described in the attached comments.
SIGNED DATE Z73
1638 Mail Service Center, Raleigh, North Carolina 27699-1638
Phone: 919-733-2293\FAX: 919-733-1495\ Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F.Easley,Governor Donna D. Moffitt, Director .William G.Ross Jr.,Secretary
August 25,2003
MEMORANDUM RECEIVED
TO: Mr. Joseph H.Henderson,Director SEP 3 2003
State Property Office 0No�OpASTA`MANAGEM
Department of Administration RAL IGH
FROM: Doug Huggett
Major Permits Processing Coordinator
SUBJECT: CAMA PERMIT APPLICATION REVIEW
APPLICANT: �A O.HARDEE—'
PROJECT LOCATION: LOTS 188, 189, & 190 AT THE END OF MARLIN DRIVE, HOLDEN
BEACH, BRUNSWICK COUNTY.
PROPOSED PROJECT: CONSTRUCT A BULKHEAD (190 L.F.) ALONG THE SHORELINE
OF THREE (3) UNDEVELOPED LOTS, ADJACENT TO A MAN-
MADE CANAL, AT THE END OF MARLIN DRIVE.
Please indicate below your agency's position or viewpoint on the proposed project and return this form
by September 15, 2003. If you have any questions regarding the proposed project, please contact Doug
Huggett at (919) 733-2293, ext. 245. When appropriate, in-depth comments with supporting data is
requested.
REPLY
_L-,__�This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project, only if the recommended changes are incorporated.
This agency objects to the project for reasons described in the attached comments.
SIGNED CDATE L (�
1638 Mail Service Center, Raleigh, North Carolina 27699-1638
Phone: 919-733-2293\FAX: 919-733-1495\ Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F.Easley,Governor Donna D. Moffitt, Director William G.Ross Jr.,Secretary
August 25,2003
RECEIVED
MEMORANDUM SEP 3 2003
TO: Mr. Roberto Canales 31V.0F(;0AWA.MIM9rA&Q
State Construction/Materials Branch RALCN1N
Division of Highways
FROM: Doug Huggett
Major Permits Processing Coordinator
SUBJECT: CAMA PERMIT APPLICATION REVIEW
APPLICANT: A.O. HARDEE >
PROJECT LOCATION: LOTS 188, 189, & 190 AT THE END OF MARLIN DRIVE, HOLDEN
BEACH, BRUNSWICK COUNTY.
PROPOSED PROJECT: CONSTRUCT A BULKHEAD (190 L.F.) ALONG THE SHORELINE
OF THREE (3) UNDEVELOPED LOTS, ADJACENT TO A MAN-
MADE CANAL", AT THE END OF MARLIN DRIVE.
Please indicate below your agency's position or viewpoint on the proposed project and return this form
by September 15, 2003. If you have any questions regarding the proposed project, please contact Doug
Huggett at (919) 733-2293, ext. 245. When appropriate, in-depth comments with supporting data is
requested.
REPLY
This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project, only if the recommended changes are incorporated.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE Z
1638 Mail Service Center, Raleigh, North Carolina 27699-1638
Phone: 919-733-2293\FAX: 919-733-1495\ Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity 1 Affirmative Action Employer—50%Recycled\10%Post Consumer Paper
• }
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary
August 20, 2003
MEMORANDUM
TO: Fritz Rohde D �n
Mr. Preston P. Pate, Jr., Director
r
Division of Marine Fisheries Z 5 ?!iO3
FROM: Doug Huggett
Major Permits Processing Coordinator
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: A. O. Hardee
Project Location: Lots 188, 189 & 190 at the end of Marlin Dr., Holden Beach, Brunswick County
Proposed Project: To construct a bulkhead (190 l.f.) along the shoreline of three (3) undeveloped lots,
adjacent to a man-made canal, at the end of Marlin Drive. The proposed bulkhead
alignment would incorporate 340 sgft. of coastal wetlands and approximately 1500 sqft.
of intertidal area and shallow bottom.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
September 10, 2003. If you have any questions regarding the proposed project, please contact Ed Brooks at Ext.
247. When appropriate, in-depth comments with supporting data is requested.
REPLY: — \This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are incorporated.
See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE �_ L- L-Zb
127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845
Phone: 910-395-3900\Fax: 910-350-2004\Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity\Affirmative Action Employer-50%Recycled\10%Post Consumer Paper
Z5 WA
A74i�'A
FqCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F.Easley,Governor Donna D. Moffitt, Director William G.Ross Jr.,Secretary
August 25,2003
RECEIVED
MEMORANDUM SAP ` 2 ZOOS
TO: Bennett Wynne A 011`00AI°AILMNAGEM
EM
Wildlife Resources Commission
ATTN: Habitat Conservation Program
FROM: Doug Huggett
Major Permits Processing Coordinator
SUBJECT: CAMA PERMIT APPLICATION REVIEW
APPLICANT: A.O. HARDEE--
PROJECT LOCATION: LOTS 188, 189, & 190 AT THE END OF MARLIN DRIVE, HOLDEN
BEACH,BRUNSWICK COUNTY.
PROPOSED PROJECT:_ CONSTRUCT A BULKHEAD (190 L.F.) ALONG THE SHORELINE
OF THREE (3) UNDEVELOPED LOTS, ADJACENT TO A MAN-
MADE CANAL, AT THE END OF MARLIN DRIVE.
Please indicate below your agency's position or viewpoint on the proposed project and return this form
by September 15, 2003. If you have any questions regarding the proposed project, please contact Doug
Huggett at (919) 733-2293, ext. 245. When appropriate, in-depth comments with supporting data is
requested.
REPLY
This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project, only if the recommended changes are incorporated.
This agency objects to the project for reasons described in the attached comments.
SIGNED /' DATE
1638 Mail Service Center, Raleigh, North Carolina 27699-1638
Phone: 919-733-2293\FAX: 919-733-1495\Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper
LTMA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary
August 20, 2003
MEMORANDUM D
TO: Dan Sams 'AUG
for: Mr. James Simons, Director
Division of Land Quality DIV•QFCp*TgLyANA
FROM: Doug Huggett
Major Permits Processing Coordinator
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: A._.O.-Hardee
Project Location: Lots 188, 489 & 190 at the end of Marlin Dr., Holden Beach, Brunswick County
i
Proposed Project: To construct a bulkhead(190 l.f.) along the shoreline of three (3)undeveloped.lots, adjacent to a
man-made canal, at the end of Marlin Drive. The proposed bulkhead alignment would incorporate
340 sgft. of coastal wetlands and approximately 1500 sgft: of intertidal area and shallow bottom.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
September 10, 2003. If you have any questions regarding the proposed project, please contact Ed Brooks at Ext.
247. When appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are incorporated.
See attached.
Erosion and Sediment Control Plan application and approval is required for this project.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE -144. ZO Zvd3
127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845
Phone: 910-395-3900\Fax: 910-350-2004\Internet: http://dcm2.enr.state.tic.us
An Equal Opportunity\Affirmative Action Employer-50%Recycled\10%Post Consumer Paper
r�®
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary
August 20, 2003
MEMORANDUM
TO: Ms. Melba Laney REC, Vt
for: Mr. William A. McNeil, Director AEG 2 7 2003
Division of Community Assistance
FROM: Doug Huggett
Major Permits Processing Coordinator
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: A_O.-Hardee '
Project Location: Lots 188, 189 & 190 at the end of Marlin Dr., Holden Beach, Brunswick County
Proposed Project: To construct a bulkhead (190 l.f.) along the shoreline of three (3) undeveloped lots,
adjacent to a man-made canal, at the end of Marlin Drive. The proposed bulkhead
alignment would incorporate 340 sgft. of coastal wetlands and approximately 1500 sqft.
of intertidal area and shallow bottom.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
September 10, 2003. If you have any questions regarding the proposed project, please contact Ed Brooks at Ext.
247. When appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are incorporated.
See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE 8-2 z A
127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845
Phone: 910-395-3900\Fax: 910-350-2004\Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity\Affirmative Action Employer-50%Recycled\10%Post Consumer Paper
r, NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary
August 20, 2003
MEMORANDUM
TO: Mr., James Rosich, Community Planner
DCM/WiRO
FROM: Doug Huggett
Major Permits Processing Coordinator
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: A. O. Hardee
Project Location: Lots 188, 189 & 190 at the end of Marlin Dr., Holden Beach, Brunswick County
Proposed Project: To construct a bulkhead- (190 l.f.) along the shoreline of three (3) undeveloped lots,
adjacent to a' man-made canal, at the end of Marlin Drive. The proposed bulkhead
alignment would incorporate 340 sgft. of coastal wetlands and approximately 1500 sqft.
of intertidal area and shallow bottom.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
September 10, 2003. If you have any questions regarding the proposed project, please contact Ed Brooks at Ext.
247. When appropriate, in-depth comments with supporting data is requested.
REPLY: ZThis agency has no objection to the.project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are incorporated.
See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE ,�I A Q03
127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845
Phone: 910-395-3900\Fax: 910-350-2004\Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity\Affirmative Action Employer-50%Recycled\10%Post Consumer Paper
MEMORANDUM
TO: Doug Huggett
Major Permits Processing Coordinator ��®
FROM: James E. Rosich,AICP AUG 2 2,2003
Wilmington District Planner
BKOROAVAI.MO
SUBJECT: CAMA Major Permit Application: A.O.Hardee
MUM
Town of Holden Beach,Brunswick County
DATE: August 21, 2003
The applicants propose to construct a bulkhead along the shoreline of three undeveloped canal-front lots.
The bulkhead will be approximately 190 feet in length. The project site is located in the Town of Holden
Beach at Lots 188, 189 and 190 of Marlin Drive, and adjacent to Canal#3.
According to the field investigation report,the following Estuarine System Areas of Environmental
Concern(AECs) will be impacted: Public Trust Area;Estuarine Waters;Estuarine Shorelines and Coastal
Wetlands. Adjacent waters are classified SA and closed to shellfishing. The Primary Nursery Area(PNA)
designation does not apply.
The proposed development has been reviewed for consistency with the Town of Holden Beach 1997
CAMA Land Use Plan Update, as amended(January 23, 2003). The project is consistent with the land
use plan provided all local,state and federal regulations are met. The land classifications for this
project are Developed(uplands) and Conservation(AECs). `The Developed classification provides for
continued development and redevelopment,' according to the land use plan. The land use plan states:
"The primary intent of the Conservation class is to provide protection for the fragile resources that involve,
in part AECs."
The following land use plan policies are applicable:
Resource Protection—Appropriate Land Use in Areas of Environmental Concern (Part a): It is the policy
of the Town of Holden Beach to conserve and manage estuarine waters, coastal wetlands,public trust
areas, and shorelines, as an interrelated group of AECs, so as to safeguard and perpetuate their
biological, social, economic, and aesthetic values and to ensure that development occurring within the
AECs is compatible with natural characteristics so as to minimize the likelihood of significant loss of
private property and public resources.
Resource Protection—Damage to Existing Marshes by Bulkhead Installation(amended January 23, 2003):
It is the policy of the Town of Holden Beach to prevent damage to existing significant coastal and
freshwater marshes as a result of bulkhead installation as provided under State and Federal regulation.
Maintenance and replacement of existing bulkheads will be permitted. It is the policy of the Town of
Holden Beach to allow for the straightening and aligning of bulkheads to original property lines on canal
lots.
cc: Charles Jones,DCM
Ed Brooks,DCM
Steven Wheeler,Holden Beach
File
O� WATF9 Michael F. Easley, Governor
William G. Ross, Jr., Secretary
North Carolina Department of Environment-and Natural Resources
coAlan W. Klimek, P.E., Director
> Division of Water Quality
0 Coleen H. Sullins, Deputy Director
Division of Water Quality
Wilmington Regional Office
July 10, 2003
Mr. A.O. Hardee �v GENE
55 Park Street Extension JUL .14 2003
Holden Beach,NC 28462 '
Subject: EXEMPTION � �
Stormwater Project No. SW80306
Lots 188,189, & 190 Marlin Drive
Brunswick County
Dear Mr. Hardee.
The Wilmington Regional Office received a copy of the CAMA Major Permit
Application for Construction of a bulkhead and backfill for shoreline stabilization on June 25,
2003. Staff review of the plans and specifications has determined that the development activities
proposed at this time will not pose a threat to surface water quality from stormwater runoff. The
Director has determined that projects that are reviewed and approved by the Division as not
posing a water quality threat from stormwater runoff should not be subject to the stormwater
management permitting requirements of 15A NCAC 2H.1000.By copy of this letter,we are
informing you that your project will not require a stormwater management permit.
If the subject project disturbs one acre or more and has a point source discharge of
stormwater runoff, then it is also subject to the National Pollutant Discharge Elimination System.
(NPDES) stormwater discharge requirements. You are required to have an NPDES permit for
stormwater discharge from projects meeting these criteria. The stormwater rules require the
Division to permit the common plan of development,therefore,any future development on the
property,regardless of whether a CAMA Major permit is also required,will require a Stormwater
Management Permit application and permit issuance from the Division of Water Quality prior to
any construction.
If you have any questions or need additional information concerning this matter please
contact Ms. Linda Lewis at(910) 395-3900.
Sincerely,
Rick Shiver
Water Quality Regional Supervisor
RSS/arl: S:\WQS\STORMWAT\CAMA\030624.Jun
cc: Caroline Bellis, DCM
Delaney Aycock,Brunswick County Inspections
Doug Huggett,DCM
Wilmington Regional Office
Central Files
Ph
N.C.Division of Water Quality127 Cardinal Drive Extension
(910)395-3900 Customer Service WC—DENR
Wilmington Regional Office Wilmington,N.C.28405 (910)350-2004 Fax 1-800-623-7748
5WUA, V C.
At 61)6ce Ax,25,2,2
Wdm aytm,✓lrWA%6a/ma 28402
Jul 9YO-452-000Y
9?v&d.T...t&d 99ha Y4
g 6/23/03 9 C/ 5a
9ll .9805 WUk4 .RGnw
Caroline Bellis
Division of Coastal Management
127 North Cardinal Drive
Wilmington,N.C. 28405-3845
Re: CAMA Major Permit application, Lots 188, 189, 190 Marlin Drive,
Holden Beach,N.C.
Dear Caroline,
I have enclosed the application materials for a CAMA Major Permit to authorize the
construction of a bulkhead with backfill for shoreline stabilization for Lots 188, 189, and
190 Marlin Drive on Holden Beach. Mr. A.O. Hardee is applying on behalf of the lot
owners who are his daughters. Copies of the application materials have been sent by
certified mail to the riparian landowners and the return receipts (green cards) will be
forwarded to you as soon as possible. Please contact me with any questions that you may
have regarding the proposed activity. Thank you for your assistance.
Sincerely,
Steve Morrison ,
Environmental Consultant �J t
v F
c A l: Application
cation � ��package; $400 fee check, deed copies
Cc -`
Development Type FEE DCM% DWQ%
(14300160143510DO9316256253) (24300 1602 435100095 2341)
1. Private,non-cammercial
development that does not involve
the filling or excavation of any MO 100%(S250)
wetlands or open water areas: 0%(SO)
IL Public or commercial development '
that does not Involve the filling or
excavation of any wetlands or open 100%(S400) 0%(SO)
water areas:
III.For development that involves the
filling and/or excavation of up to 1
acre of wetlands and/or open water
areas,determine if A,B.C,or D
below applies
III(A� For Private,non-commensal
development,If General water Quality
Certification Nb.33D1(see attached) S250- 10D%(S250). O%(SD) -
can be applied
111(13k For public or commercial
development,if General wafer Quality
Certification No.33D1(see attached) �� = 100%•(S400) 0%(SO)
can be applied
111(C). If General Water Quality,
Certification No.3301(see attached)
Could be applied,but DCM staff,
determined that additional review and S40D 60%(S240)
written DWQ conmarence is needed - 40%(S160) .
because Df concerns related to water _
quality or aquatic life
111(D� If eat Water Quality
Certificati n No.3301(see attached) 5400 60%('5240)
can not. applied 40%($16O)
N Fordevelopmenttr dinvolves. - -
the fiIImg and/or excavation of rnore -
than one acre of wellands and/or :5475 60%(52(i5) -00%(5190) - —
open water areas
_ OMI
AjUi
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary
August 20, 2003
FAX: 910-754-5407
2 Pages
Brunswick Beacon
Ms. Carolyn Sweatt
Legal Advertisement Section �®
Post Office Box 2558 AUG 21 '2QQ3
Shallotte, North Carolina 28459
Re: Public Notice - A. O. Hardee
Dear Ms. Sweatt:
Please publish the attached Notice in the Thursday, August 28, 2003, issue.
The State Office of Budget and Management requires an original Affidavit of Publication prior to payment
for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original
invoice to Chris Pope, Division of Coastal Management, 1638 Mail Service Center, Raleigh, North Carolina
27699-1638. Please also send a copy of the affidavit to DCM, 127 Cardinal Drive Extension, Wilmington, NC
28405.
Thank you for your assistance in this matter. If you should have any questions, please contact me at our
Wilmington office.
Sincerely,
Linda Painter
Coastal Management Secretary
Enclosure
cc: Doug Huggett
Chris Pope
File Copy
127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845
Phone: 910-395-3900\Fax: 910-350-2004\Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity\Affirmative Action Employer-50%Recycled\10%Post Consumer Paper
NOTICE OF FILING OF
APPLICATION FOR CAMA MAJOR
DEVELOPMENT PERMIT
The Department of Environment and Natural Resources hereby gives public notice as
required by NCGS 113A-119(b) that application for a development permit in an Area of
Environmental Concern as designated under the CAMA was received on July 1, 2003.
According to said application, A. O. Hardee, at lots 188, 189, & 190 at the end of
Marlin Drive, Holden Beach, Brunswick County, proposes to construct a bulkhead (190 l.f.)
along the shoreline of three (3) undeveloped lots, adjacent to a man-made canal, the alignment
would incorporate 340 sgft. of coastal wetlands and approximately 1500 sqft. of intertidal area
and shallow bottom.
A copy of the entire application may be examined or copied at the office of
Environment and Natural Resources, 127 Cardinal Drive Extension, Wilmington, North
Carolina 28405, (910/395-3900) during normal business hours.
Comments mailed to Donna D. Moffitt, Director, Division of Coastal Management,
1638 Mail Service Center, Raleigh, N. C., 27699-1638, prior to September 18, 2003, will be
considered in making the permit decision. Later comments will be accepted and considered up
to the time of permit decision. Project modification may occur based on review and comment
by the public and state and federal agencies. Notice of the permit decision in this matter will
be provided upon written request.
PIMA
NOENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary
August 19, 2003
A. O. Hardee
55 Park Street Extension
Little River, SC 29566
Dear Mr. Hardee:
The Division of Coastal Management hereby acknowledges receipt of your application for State approval for
the proposed construction of a bulkhead, at Lots 188, 189, and 190, on Marlin Drive, in Holden Beach, in Brunswick
County. It was received as complete on July 1, 2003, and appears to be adequate for processing at this time. The
projected deadline for making a decision is September 14, 2003. An additional 75-day review period is provided by
law when such time is necessary to complete the review. If you have not been notified of a final action by the initial
deadline stated above, you should consider the review period extended. Under those circumstances, this letter will
serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day.
If this agency does not render a permit decision within 70 days from July 1,.2003,you may request a meeting
with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a
meeting will be held within five working days from the receipt of your written request and shall include the property
owner, developer, and project designer/consultant.
NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed
development. Enclosed you will find a "Notice of Permit Filing" postcard which must be.posted at the property of
your proposed development. You should post this notice at a conspicuous point along your property where it can be
observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the
road right-of-way fronting your property; or at a point along the road right-of-way where a private road would lead one
into your property. Failure to post this notice could result in an incomplete application. .
A field report has been prepared and is in the process of being circulated to the various state and federal review
agencies for their comments. If additional information is required based on this review, the agencies may contact you
directly.
Sincerel
cc: Doug Huggett, DCM E. F. Brooks
Jim Gregson, DCM Field Representative
Rhonda Phillips, LPO
Henry Wicker, COE
Steve Morrison, Agent
127 Cardinal Drive Extension, Wilmington, North Carolina 28405-3845
Phone: 910-395-3900\Fax: 910-350-2004\ Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity\Affirmative Action Employer-50%Recycled\10%Post Consumer Paper
y
s � -
CAMA PP— RMIT
APPLI ,.I=
OJECT.00ro CO3ns*r SAC* M )DWIA&C-1cl cno via)
COMMENTSAlm
THROUGH ► 1'%- ;LO(73
• � • � •
APPLICANT:
clue
LOCALOFFICER C •
A 0
. •.
D � w
.. ' , • • • DELIVERY
SEN■ Complete itee'ns 1,2,and 3.Also complete _-R ived by(P as rI - learly) B D o De ery .
item 4 if Restricted Delivery is desired. t _ �3 I
■ Print your name and address on the reverse
so that we can return the card to you. C:Si
■ Attach this card to the back of the mailpiece, [1 Agent
or on the front if space permits. ❑Addressee
D. eery add ss different from item 1? ❑Yes
1. Article Addressed to: If YES,enter elivery address below: ❑No
i
15o ff rzl 'n�0oe-
3. Service Type
Certified Mail ❑ Express Mail
❑ Registered ❑ Return Receipt for Merchandise
❑ Insured Nail ❑C.O.D.
av T 4. Restricted Delivery?(Extra Fee) ❑Yes
2. At` -
700;1 "2',510 '0009 1774 6927
PS Form 3811,July 1999 Domestic Return Receipt 102595.00-M-0952
COMPLETE • COMPLETE • • DELIVERY
■ Complete items 1,2,and 3.Also complete A. Received by(Please Pri t Clearly) B. Date of Delivery
item 4 if Restricted Delivery is desired.
■ Print your name and address on the reverse C. Signature
so that we can return the card to you. m ❑Agent
■ Attach this card to the back of the mailpiece, X ❑Addressee
or on the front if space permits.
D. Is delivery address differer�D m item 1? Yes
1. Article Addressed to: if YES,enter delivery a fires elow:
.W,,
0
0
r � �
—Del V� ` �'
3. S rvice Type
(� Certified Mail ElExpress Mail
FlUen��e, SC, p 950 I ❑ Registered ❑Return'Receipt for Merchandise
❑ Insured Mail ❑ C.O.D.
i
4. Restricted Delivery?(Extra Fee) ❑Yes
2.
7001 . 2510; 0009 1774. 6910;; . ;; =
PS Form 3811,July 1999 Domestic Return Receipt 102595.00-M•0952
�omc 516 828
tvwntuW DOW 95
p �m, Charl s
rv+
BRUNSWICK ' 82
NORTH CAMUNk December —AM:=W.
TMS DEED.Mae�n�— �••
A. O. Hardee and Joyce R_ Hardee
by
HO=rY r t7 -d stun td
Sonya Joy-Hardee, Rt. # 2 Box'11
or the Ift,VUL North Myrtle Beac j-
h, S. C.
Ho S outh Carob
Had Mate a!.�.-------
oc the aeeand VVU
ZLat A O 8arde
WrrbZSSEM -
TrN DOLLARS i510.00) and Love d affec
us Sonya Joy Hardee
� b7
Ve b�{scd and vA&nd IW ege
the�pt of Wbleb isne:tto ae�ledse0. Sonya Jov Hardee h
b=0b,wU gad eamt7 tO
Lockwo F
bdn and x=dZM a eestata U'd to t+ at Lad bade
NorBrunswick - r_r, sute
11 cam gad ba®ded n9OU°'WS6 Ift'
th c trip lot or parcel of land,
ALL AND SINGuLAs al situate, lyin d b LoCacwood Folly Township, _�
' ng
Brunswick unty, at of orth Carolina, andInOre
NETY, (190)
oarticul y ib a in NO. ONE HUNDRED,
f of the B b r Acr la On fo Coastal Development corporation
11 1 •ck ty, North Carolina, asp PlAt
at Hold each, B
�� I , registered
3, dated
thereof by C- B• Br Book 8 Page -1in the office
30 196 corded i MP
North Carona.
P. "is r of a of Brtms li
we for eater certainty
to hi at en is hereby
of sc 'p n•
i
Y n Fe[.29
45 ,E JY�9
_' e1��
y f
}
HOOK PAR �RC9 +
USE M INK AP
Y
The above had was eonveped to I(raator by �"--- •�•��T+-See Beet No. 194 Pue 229 I�
Corp.
TO HAVE AND TO HOLD the atatesald tract or parcel of Ised and all privileges and appurtenances ehereuoto
below to the Uld,artY of the second part nod. h-- heLa and asst forever. i !�
And the saki p.LM of the frsc part do -covenant tbat.._ they tNare � rs
they have
aslud of saki premises W Lie and the slpht to maory the same to fee ample: that the acme j
are tree trove co w.tambrane and tbN they warrant and defend the said Utle to the same aaalatt the
A-1, of all penom wbstsoever.
IN TLS DZM WIME OP the raid part ie the Hrft p��have se the
and we]
i
tseal) �
. o. R ee l� t
i
(Seal) i
tsw) J
(J (Stall
. - tsrut l
Attest: (seal)
(S
CSI) j
• HORRY Cam-
STAT2:OP 11
Notary Pvb t;do h;tv txrs7b!hat J
A. 0/Hardee and Joyce R. Hardee .•`'.�1lC�:J t
cep this day and atlmowtedted tho due execution,of the anaesed dee f et cod+ +nee.. ��r
11 17th December���)�$�
wan my Y day .IT✓�r� ' I.�i 2 ! r
eommtaton
TE OF NO C LIP14 ca ub '/)• :S31�y�rf r`'
Notarr PubUa do hereby eetrib'that S
ppeal+ed t before we 1hthisddayand ae>mewlexecutionthe
ted the due execution of annexed deed of eaeveyaaca I
w(tt:els my hand and notarial seal.•cot. ds1 or AA -._.2Y i
NJ?. (seal) i
BRUNSWICK -
STATE OF NO&TII CAHOLiN� couNPF.
The foreaaiwt oerunate(al Charles L. Watson. Notary Public
r 11
f. (are) certified to be eot'rett. This lnthvmeet wax presented for registration thta day I
and hour and duly recorded In the oMee of the Register of Dads of $I UASWiCk r 4. C
Book. 516 page 828
21serti December A_D to 82 a. 1:40 o lock P-*r
Regtsre Donna H. Prince i
Depub/2C9t➢tl�t-Reslsttrbt Diedt^I� � ��'�
' • Batsaded and verlfltd: ��__`••- }. L.