HomeMy WebLinkAbout51-03 Minor Mod. 10/2003 Permit Class Permit Number
MODIFICATION/MINOR 51-03
STATE OF NORTH CAROLINA
Department of Environment and Natur es"urc
RE' ��� � and
'" " y Coastal Resources Commi i D
NQv 1 s 2003 ar11Yit
31V.0FCOASTALMANAGERN w
RALOOH for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Eastern N.C.Natural Gas, PO Box 1551 -PEB 18,410 S. Wilmington St., Raleigh, NC 27602-1551
Authorizing development in Multiple County at Multiple waterbody crossing in 6 eastern
N.C. counties , as requested in the permittee's application letter dated 8/29/03, including
attached revised impact spreadsheet dated received 9/8/03.
This permit, issued on October 24, 2003 , is subject to compliance with the application(where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This minor modification authorizes the changing of the method of crossing of one wetland (W71A)
from horizontal directional drilling (HDD) to an open cut, and a switch from the use of open cuts to
HDD at 5 smaller wetland sites, all as indicated in the referenced permit modification request dated
8/29/03.
2) This minor modification must be attached to the original of Permit No. 51-03, which was issued on
4/11/03, as well as all subsequent modifications, refinements and/or amendments, and copies of all
documents must be readily available on site when a Division of Coastal Management representative
inspects the project for compliance. All conditions and stipulations of the active permit remain in force
under this modification unless altered herein.
NOTE; The N.C. Division of Water Quality authorized the proposed project under a modification to
General Water Quality Certification No. 3274 (DWQ Project No. 030051), which was
originally issued on 2/17/03 and modified on 10/20/03.
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Donna UNYoTfitt, Director
Any maintenance work or project modification not covered Division of Coastal Management
hereunder requires further Division approval.
All work must cease when the permit expires on This permit and its conditions are hereby accepted.
December 31, 2006
In issuing this permit, the State of North Carolina agrees AA.
that your project is consistent with the North Carolina Coastal 1&4r t
Management Program. 61 Signature of Permittee
Permit##
DCM Coordinator:
AIAM NG DISTRIBUTION:
Permitec: F /C VV
Agent: p
DCAI Field Offices:
Elizabeth Cis.
orehead Cih
Vl'ashington
VI/ilm ington
US Army Corps of Engineers (LTSACE):
Washington: Mike Bell(NCDOT)
B iddlecome(NC
Raleig B
Wilmington: Dave Timpy(NCDO
Henry Wicker
Others:
Cultural Resources: Renee Gledhill-Early
Environmental Health: Beverly Sanders
Marine Fisheries: Mike Street
NCDOT: Roberto Canales
Shellfish Sanitation: Gina Brooks
State Property Office: Joseph Henderson
Water Quality:
Dorsey
Water Resources: John Hennessy(NCDOT)
Wildlife Resources: John Sutherland
David McHenry
Bennett Wynne
David Cox(NCDOT)
Travis Wilson (NCDOT)
FANG DISTR-3�ON:
Permitee at ��
Agent at
DC11I Field Offices:
Elizabeth City
wMin7on
Wilmington
US Army Corps of Engineers T
Washington: (SAGE):
Mike Bell(NCDOT)
Bill Biddlecome(.NCDOT)
Raleigh Bland
Wilmington: Dave Timpy(NCDOT)
Henry W
Updated as 2/7/03 icker
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT,CORPS OF ENGINEERS
PO BOX 1890 . ..
`PJILMINGTON NC 28402-1890
October 15, 2003
Regulatory Division
Action ID No. 200310253
RECEIVED
OCT 2 710p3
Sheila Hughes, Environmental Coordinator o3 .�IV.OF(,1pq�����,,,�`
Eastern North Carolina Natural Gas �' 111
ou
410 South Wilmington Street
Raleigh,North Carolina 27602-1551
Dear Ms. Hughes:
On May 2, 2003, the Department of the Army issued a permit to Eastern North Carolina
Natural Gas to construct Phase IRA of the Eastern North Carolina Natural Gas pipeline project
from Hackney in Pitt County to Tar Landing in Onslow County. A written request for permit
modifications was received on August 28, 2003.
This request involves the replacement of the Horizontal Directional Drill (HDD) of Wetland
71A with open-cut construction. Wetland 71A is located north of Ten Mile Fork immediately
west of U.S. Hwy. 17 near the Jones and Craven County line. Several other wetland crossings
previously permitted to be open-cut have been identified for HDD (see attached Phase 3A Permit
Modification). This modification is requested due to the length of Wetland 71A and the
associated construction cost. The modification decreases temporary impacts associated with
pipeline construction by 0.018 acres.
The permit is hereby modified to include the work as shown on the enclosed plans. It is
understood that all conditions of the original permit remain applicable and that the expiration
date is unchanged.
Sincerely,
Charles R. Alexander, Jr.
Colonel,U.S. Army
District Engineer
Enclosure
Copies Furnished with enclosure:
Chief, Source Data Unit Mr. Ronald J. Mikulak, Chief
NOAA\National Ocean Survey Wetlands Protection Section—Region IV
ATTN: Sharon Tear N/CS261 Water Management Division
1315 East-West Hwy., Rm 7316 U. S. Environmental Protection Agency
Silver Spring, MD 20910-3282 61 Forsyth Street
Atlanta, Georgia 30303
Mr. David Rackley
National Marine Fisheries Service U. S. Fish and Wildlife Service
219 Fort Johnson Road Fish and Wildlife Enhancement
lirvision
leston, South Carolina 29412-9110 Post Office Box 33726
Raleigh,North Carolina 27636-3726
Doug Huggett
of Coastal Management Mr. Ron Sechlar
N.C. Department of Environment National Marine Fisheries Service
and Natural Resources Pivers Island
1638 Mail Service Center Beaufort,North Carolina 28516
Raleigh,North Carolina 27699-1638
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary
September 17. 200;
MEMO TO: John Dorney, DWQ—Raleigh
Mike Street, DMF—Morehead City _
FROM: Doug Huggett
Major Permits'Coordinator%'
SUBJECT: Modification request for CAMA Major Permit 51-03 (DWQ Project
No. 030051) issued to Eastern North Carolina Natural Gas (ENCNG)
for Phase IIIA, Beaufort, Craven, Pamlico, Jones and Onslow Counties
Attached please find a modification request submitted by Ms. Sheila Hughes of Eastern
North Carolina Natural Gas, in which a modification to CAMA Permit No. 51-03 was requested.
This modification request involves changing the method of crossing for one wetland area from
horizontal directional drilling(HDD)to an open cut. To offset this impact, ENCNG proposes to
switch from an open cut method to HDD at 5 smaller wetland sites. In order to properly evaluate
this request, I would like to request comments from your agencies on the modification. If at all
possible, comments by September 30, 2003 would be appreciated. Please feel free to contact me
at(919) 733-2293 should you wish to discuss this matter further.
cc: Tracey Wheeler, DCM—Morehead City(w/out attachment)
1638 Mail Service Center, Raleigh, North Carolina 27699-1638
Phone: 919-733-2293\FAX: 919-733-1495\ Internet: hftp://dcm2.enr.state.nc.us
An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper
A
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr.,Secretary
MEMORANDUM:
TO: DOUG HUGGETT
FROM: TRACEY WHEELER, , cLCA-1
SUBJECT: MINOR MODIFICATION—CAMA MAJOR PERMIT # 51-03
DATE: September 5, 2003
Please find enclosed a request from Ms. Shelia Hughes, Environmental Coordinator for Eastern
North Carolina Natural Gas (ENCNG) requesting a modification to CAMA Major Permit # 51-
03 to change the horizontal direction drill of Wetland 71-A to an open cut. ENCNG proposes to
change the method of construction in several other wetlands from open cut to horizontal
directional drill. If permitted, the modification would not increase total wetland impacts.
This permit was originally issued on April 11, 2003 and was amended on May 12, 2003. The
permit was issued for the installation of 94.5 miles of natural gas and fiber optics line in
Beaufort, Craven, Pamlico, Jones, and Onslow counties. The applicant proposes to change one
1.23 HDD crossing to open trench, and to change eleven smaller crossings constituting 1.24 ac,
from open trench to HDD. None of the subject crossings are navigable, nor do they contain
coastal wetland vegetation.
After thorough review of the request I have determined that this proposal is consistent with 15A
NCAC Subchapter 07H.0208, and .0209. Therefore, I recommend the Minor Modification be
authorized and that all original conditions of the issued permit remain in effect. The applicant
will be submitting the $100 modification fee.
cc: Ted Tyndall, DCM
RECEIVED
SEP 8 2003
ONOWNTALMANAGOM
RUM
151-B Hwy. 24, Hestron Plaza II, Morehead City, North Carolina 28557
Phone: 252-808-28081 FAX: 252-247-33301 Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper
Easter) I 5E? o 2 2003
Eastern North Carolina Natural Gas
29 August 2003
Ms. Tracey Wheeler
Field Representative
Division of Coastal Management
Morehead City Office
151-B Hwy 24, Hestron Plaza II
Morehead City,NC 28557
RE: Phase IIIA Minor Modification Request—Wetland 71A Construction Method
Dear Ms. Wheeler,
EastemNC is proposing to modify its original Phase IIIA CAMA permit by replacing the
Horizontal Directional Drill (HDD) of Wetland 71A (a non-CAMA wetland) with open-cut
construction. To balance this request, EastemNC has identified several other wetlands that were
previously permitted to be open-cut for HDD construction. The modification request is being
submitted due to the length of W71A, which will cause EastemNC to face a tremendous
construction cost. The longer the length of a HDD the more costly it is per foot of HDD, which
we need to avoid where possible under our budget constraints. EastemNC had previously
submitted the Phase IIIA permit application book when this information was discovered, and it
was an oversight on our part. EastemNC would like permission to open-cut W71A, and HDD
others listed to bring the length of wetlands drilled to the original permitted amount. Therefore,
overall wetland impact numbers are not changing. The table attached lists all wetlands requested
for open-cut and each corresponding length.
Our environmental consultant, Environmental Services, Inc. (ESI), used GPS technology to
gather all wetland and/or stream data points and flagged them in November of 2002. Aerial
maps showing the exact location and acreage's of both the proposed open-cut of W71A and
HDD's for each wetland are attached for your information.
Should you have any questions or need any additional information, please don't hesitate to call
me at (919) 235-6014. Thank you in advance for your support and assistance in processing the
requested modification to our Phase IIIA CAMA Permit 51-03.
yxt/- 0
Sheila J. Hughes
EastemNC Natural Gas
Environmental Coordinator
P.O.Box 1551-FEB 18
410 S.Wilmington Street Telephone 919 546-2670
Raleigh,NC 27602-1551 Fax:919 546-6707